ML20009E640
| ML20009E640 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/16/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wells D DETROIT EDISON CO. |
| Shared Package | |
| ML20009E641 | List: |
| References | |
| NUDOCS 8107280327 | |
| Download: ML20009E640 (2) | |
See also: IR 05000341/1981009
Text
{{#Wiki_filter:- 4 . . 6 WUL 161981 s ) / R[{{{;ftA f Docket No. 50-341 2 GK b88fA The Detroit Edison Company u h a,kg E ATTN: Mr. Donald A. Wells Manager, Quality Assurance 9' 2000 Second Avenue / Detroit, MI 48226 / Ce [74 Gentlemen: This refers to the routine safety inspection conducted by Messrs. B. H. Little and P. M. Byron of this office on June 1-30, 1981, of activities at Enrico Fermi, Unit 2, authorized by NRC Construction Permit No. CPPR-87 and to the discussion of our findings with Mr. E. Griffing at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. During this inspection, certain of your activities appeared to be in non- compliance with NRC requirements, as specified in enclosed Appendix A. A written response, submitted under oath or affirmation, is required. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC's Public Document Room. If the enclosures contain any information that you or your contractors believe to be exempt from dis- closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within seven (7) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such information. Section 2.790(b)(1) requires that any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the [gg 0107280327 810716 DR ADOCK 05000 g
1 " . . . Detroit Edison Company -2- basis which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter, the enclosures, and your response to this letter will be placed in the Public Document Room. We will gladly discuss any questions you have concerning this inspection. Sincerely, O ./ . F. Heishman, Acting Director Division of Resident and Project Inspection Enclosures: 1. Appendix A, Notice of Violation 2. IE Inspection Report No. 50-341/81-09 cc w/encls: DMB/Docmaent Control Desk (RIDS) Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission l Eugene B. Thomas, Jr., Atto rney l l , 1 / RIII RIII RIII RIIIp{{'g RIII[ d[9AT>> # ,9&.T U' ]d Little/jp f_ Byron Konklin Knop Heis%'an 7/13/81 . - }}