ML20009E537

From kanterella
Jump to navigation Jump to search
Forwards LER 81-032/03L-0
Date released: 01/23/2020 Download: ML20009E537


LER 81-032/03L-0:on 810616,during Normal Operation,Decay Heat Closed Cycle Cooling Pump Supply Fan AHF-15B Discovered Noisy.Fan Declared Inoperable.Caused by Worn Bearings.Sealed Bearings Replaced
ML20009E551
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/14/1981
From: Heinandy V
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009E551 (2)
Forwards LER 81-032/03L-0
ML20009E536
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/14/1981
From: Baynard P
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009E536 (1)