CONTAINMENT SYSTEMS OXYGEN CONCENTRATION LItilTING CONDITION FOR OPERATION 3.6.6.3
- The primary containment atmosphere oxygen concentration shall be less than 4% by volume during the period from:
a.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER > 15% of RATED THERMAL-i POWER, to b.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to a scheduled reduction of THERMAL POWER to < 15% of RATED THERMAL POWER.
r 1
APPLICABILITY:
CONDITION 1.
ACTION:
With the oxygen concentration in the primary containment exceeding the limit, be in at least STARTUP within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
s.
SURVEILLANCE REOUIREMENTS 4.6.6.5 The oxygen concentration in the primary containment shall be verified to be within the limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER
> 15% of RATED THERMAL POWER and at least once per 7 days thereafter.
- For the pertud commencing at 0630 on June 29, 1981, a one-time only exemption is allowed to operate BSEP-2 in Condition 1 with contain-ment oxygen concentration exceeding 4% by volume for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
~'
8107270023 810629 l
PDR ADOCK 05000324 i
P PDR I
LRUNSWICK - UN T 2 3/4 6-29
. Amendment No.
~_
~
1 CONTAINMENT SYSTEMS CXYGEN CONCENTRATION N
LJ ITING CONDITIO" FOR OPERATION 4
3.6.6.3
- The primary containment atmosphere oxygen concentration shall be less than 4% by volume during the period from:
a.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER > 15% of RATED THERMAL POWER, to b.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to a scheduled reduction of THERMAL POWER to < 15% of RATED THERMAL POWER.
1 APPLICABILITY:
CONDITION 1.
ACTION:
With the exygen concentration in the primary containment exceeding the limit, be in at least STARTUP within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
t' I
I SURVEILLANCE REOUIREMENTS 4.6.6.3 The oxygen concentration in the primary containment shall be verified to be within the limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER
> 15% of RATED THERMAL POWER and at least once per 7 days thereafter.
l I
'For the period commencing at 2245 on June 12, 1981, a one-time only exemption is allowed to operate BSEP-2 in Condition 1 with contain-ment oxygen concentration exceeding 4% by volume for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
l i
r l
BRUNSWICK - UNIT 2 3/4 6-29 Amendment No. 59
... - - -..... -