ML20009D983

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/81-05 & 50-414/81-05 on 810317-20 & Notice of Violation
ML20009D983
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/10/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20009D966 List:
References
NUDOCS 8107240554
Download: ML20009D983 (2)


See also: IR 05000413/1981005

Text

..

OFFICIAL COPY,, g _

h*

\\

UNITED CTATES

c

8

1,

NUCLEAR REGULATORY COMMISSION

hM

3

E

REGIOP: 11

k

101 MARIETTA ST

N.W.. SUITE 3100

4

AT LANTA, GEORGIA 30303

        • '

APR 101981

Duke Power Corrpany

ATTN: W. O. Parker, Jr.

i

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

Subject: Report Nos. 50-413/81-05 and 50-414/81-05

This refers to the routine inspection conducted by W. P. Kleinsorge of this

office on March 17-20, 1981, of activities authorized by NRC Construction Permit

Nos. CPPR-116 and CPPR-117 for the Catawba facility. Our preliminary findings

were discussed with T. D. Mills at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

sppear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspectiors.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC Public Document Room.

If this report

.

cor tains any information that you believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

in % rmation from public disclosure. Any such application must include the basis

for claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

8107240554 910701

PDR ADOCK 05000413

.G

PDR

-

_ _ _ _

_.

_ _ _ _ _ _ . _

__

. . _ _ _ _ _ _ . _ _ _ ,

APR 101981

-

.

-

.

,

,

cv.

.

Duke Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

. C. Lewi s

ing Dir

r

Division of

sident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

-2.

Inspection Report Nos. 50-413/81-05

and 50-414/81-05

cc w/ enc 1:

J. W. Hampton, Station Manager

D. G. Beam, Project Manager

.

m

l

l.

!

!

!

I

l

l

'

-

. , ,

. - , -

,

. - - .

.

..

- - _ . , ,

. , . _ - _ . _ . , , ,_ _ .. - _,.. _ --., ,..- - - _. ---. ,. . ,,--.