Forwards IE Insp Rept 50-369/81-18 on 810601-15.No Noncompliance Noted
ML20009D804
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/26/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20009D805 List:
References
NUDOCS 8107240365
Download: ML20009D804 (2)


See also: IR 05000369/1981018

Text

-_

OFFICIAL COPY

e vo

-

w% ,

.

^ g'

UNITED STATES

.

3 .;% ,- , y)e $4M i

/

!'

NUCLEAR REGULATORY COMMISSION

REGION ll

g Nk / ,;5

101 MARtETTA ST., N.W., SUITE 3100

4g

ATLANTA, GEORGIA 20:03

JUN 2 6 tcat

hk

c}

Duke Power Company

of pFT

%

N

A

-

.

ATTN: Mr. W. O. Parker, Jr.

l

UJ h

~

S JUL 2 319815 %

Vice President, Steam Production

P. O. Box 2178

C

u.s. mm uouuron

2

Charlotte, NC 28242

g

c=55m

/'c6,/ w p., N

Gentlemen:

f

Suoject: Report No. 50-369/81-18

'

This refers to the routine safety inspection conducted by Mr. G. L. Troup of

this office on June 1-5, 1981, of activities authori: ed by NRC License No. NPF-9

for the McGuire facility and to the discussion of our findings held with

Mr. M. D. McIntosh, Station Manager, at the conclusion of the inspection.

Areas examined during the insoection and our findings ars discussed in the

enclosed inspection report. Witnin these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of En s inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this-

letter.and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the cate of this letter of your inten-

tion to file a request for withholding; and (b) submit within twenty-five days

from the date of this letter a written application to this office to withhold

such information. If your receipt of this letter has been delayed such that less

than seven days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent witn section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimea that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the consicerations listed in

10 CFR 2.790(b)(4). The information sougnt to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

,

you in this regard within the specified perious noted above, the report will be

placed in the Public Document Room.

IW

5

-

Iff

8107240365 810620

PDR ADOCK 05000369

0

PDR

.

, , - , .

,n

-.

--

n-

, , - , - , , , - , . , , . , , - - ,

- - - -

-

JUN 2 6 581

-

-

.

.

.

Duke Power Company

2

Should you have ar.y questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. Le./is, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure: I.ispection Report

No. 50-369/81-18

cc w/ encl:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager