OFFICIAL COPY
e vo
-
w% ,
.
^ g'
UNITED STATES
.
3 .;% ,- , y)e $4M i
/
!'
NUCLEAR REGULATORY COMMISSION
REGION ll
g Nk / ,;5
101 MARtETTA ST., N.W., SUITE 3100
4g
ATLANTA, GEORGIA 20:03
JUN 2 6 tcat
hk
c}
Duke Power Company
of pFT
%
N
A
-
.
ATTN: Mr. W. O. Parker, Jr.
l
- UJ h
~
- S JUL 2 319815 %
Vice President, Steam Production
P. O. Box 2178
C
u.s. mm uouuron
2
Charlotte, NC 28242
g
c=55m
/'c6,/ w p., N
Gentlemen:
f
Suoject: Report No. 50-369/81-18
'
This refers to the routine safety inspection conducted by Mr. G. L. Troup of
this office on June 1-5, 1981, of activities authori: ed by NRC License No. NPF-9
for the McGuire facility and to the discussion of our findings held with
Mr. M. D. McIntosh, Station Manager, at the conclusion of the inspection.
Areas examined during the insoection and our findings ars discussed in the
enclosed inspection report. Witnin these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of En s inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this-
letter.and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the cate of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent witn section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimea that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the consicerations listed in
10 CFR 2.790(b)(4). The information sougnt to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
,
you in this regard within the specified perious noted above, the report will be
placed in the Public Document Room.
IW
5
-
Iff
8107240365 810620
PDR ADOCK 05000369
0
.
, , - , .
,n
-.
--
n-
, , - , - , , , - , . , , . , , - - ,
- - - -
-
JUN 2 6 581
-
-
.
.
.
Duke Power Company
2
Should you have ar.y questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Le./is, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosure: I.ispection Report
No. 50-369/81-18
cc w/ encl:
M. D. McIntosh, Plant Manager
J. C. Rogers, Project Manager
J