05000334/LER-1981-059-03, /03L-0:on 810615,battery Charger Supply to 125-volt Dc Bus 1-2 Lost When Battery Charger 2 Output Breaker Tripped Open.Caused by Excessive Heat in Emergency Switchgear Area.Fan Placed by Charger

From kanterella
(Redirected from ML20009D775)
Jump to navigation Jump to search
/03L-0:on 810615,battery Charger Supply to 125-volt Dc Bus 1-2 Lost When Battery Charger 2 Output Breaker Tripped Open.Caused by Excessive Heat in Emergency Switchgear Area.Fan Placed by Charger
ML20009D775
Person / Time
Site: Beaver Valley
Issue date: 07/13/1981
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20009D772 List:
References
LER-81-059-03L, LER-81-59-3L, NUDOCS 8107240335
Download: ML20009D775 (2)


LER-1981-059, /03L-0:on 810615,battery Charger Supply to 125-volt Dc Bus 1-2 Lost When Battery Charger 2 Output Breaker Tripped Open.Caused by Excessive Heat in Emergency Switchgear Area.Fan Placed by Charger
Event date:
Report date:
3341981059R03 - NRC Website

text

W LICENSEE EVENT REPORT y, -

CORTROL BLOCK: l l

l l

l l

(PLEASE PRIRT OR TYPE ALL REQUIRED INF0FsMATIOM 1

6 jo lil lP l A l B lV lS l 1 l@l 0 l0 l-l 0 l0 l 0 l0 l 0 l-l0 l 0 l@l4 l1 l1 l1 l1 l@l l

l@

7 8 9 LICENSEE CODE I4

  • 5 LICENSE NuMBEH 25 26 LICENSE TYPE a

$7 GAT $4 COR'T lolil 3o,"c l L ]@l 0 l 5 l 0 l 010 l 313 l 4 @l 0161 Il 5l 81 1 @l 01 71 11 31 81 1l@

"'" 7 7

8 60 61 DOCKET NUMB ER 64 69 EVENT DATE 74 75 RE* ORT DATE 80 EVENT DESCR.PTION AND PRCBABLE CONSEQUENCES h tol2l l On 6/15/81 at 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br /> with reactor nower at 95"z. the batterv charger supolv to l

125 VDC bus No. 1-2 was. lost when the No. 2 battery charger output breaker tripped j

,3,.j j o ;4; j open. The. charger was declared inoperable while power operat. ion continued within [

the limitations of Technical Specification 3.8.2.3.

The health and safety of the l

[o isI i Io is l l 'public was not jeopardiz;.d as the No. 2 battery remained operational.

I I

l o 171 I l

j0ldl l 7

in 9 E

COCE SLBC E COMPONENT COCE SL8CbCE S

E lo19]

I E l C lh l X lh l Z lh lZ lZ l Z l Z l ? l Z lh l Z l@ i7, I h 7

8 9

to 11 12 13 18 19 20 SEGUENTIAL OCCURRENCE RE* ORT REVISION (g g. pg EVENT V E A R REPORT NO.

COCE TYPE No.

h RE kRT l 8l 1l l-l 10l519l l/l 10 l 3 l l Ll l-l l0l gg 21 22 23 24 26 27 23 29 D

31 32 T K N C O CN PLANT t,, H HOURS SB IT D FOR B.

SL PP LI E VArUFACT RER l XI@l Fl@

l Z ]@

[Z_j@

l0l0l0l0l l Y l@

lNl@

lZl@

l Z l 9 l 919l@

33 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS li t o l l Excessive heat in the emergency switchgear area caused the breaker to trip on l

li li i l thermal overload. A portable fan was placed in the vicinity of the batterv charnert to cool the breaker. ~At 1120 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.2616e-4 months <br /> the charger was returned to service. Future

[

i i l 21 I l i 13 l 'l actions will be to investigate improvements to the ventilation system on the l

I I1 141 l battery charger.

80 7

3 9

[$

%'CWER OTHER STATS IS O RY DISCOVERY DESCR pT!QN ST l1 15 l lE l@ l 0l 9l 5l@l N/A l

l A l@l Control Room Alarm l

ACTIVf TY CO TENT RELIASED CF RELEASE AMOUNT OF ACTivlTY LCCATION CF RELEASE lt l6 l l Z l @ l Zl@l N/A l

l N/A l

7

.4 9

to 11 44 45 D

PERSONNEL EXPCSURES NUMBER TYPE DESCRtPTICN l i 17 l 1010101@l Z l@l N/A l

,ERSOnN E'L iN;uh$

OESCRiPTicNh NuveER li t a l 1010101@l N/A l

30 7

8 9 11 12 LOSS OF OR CAVAGE TO FACILITY Q TveE CESCRIPTION

%/

Ii 191 I Z l@l N/A l

6 7

  • 9 io 8107240335 810713

,C','*SCRieTiONO PDR ADOCK 05000334 NRC USE ONLY S

PDR N/A l

; ;;;;;i;i ; ; l{

[2j,gJlNf@l 56 69 30 1 F

g 9

?O acey P"ON E-NAVE OF PREPARER

ko Attachment to LER 81-59/03L Beaver Valley Power Statida-Duquesne Light Company Docket No. 50-334 No further information is available or needed to satisfy the reporting requirement.

9 e