/g*%
OFFICIAL COPY
1 *
UNITED STATES
[*g
k'g
'
NUCLEAR REGULATORY COMMISSION
g ( [g' g(.;. p
'
PEGION 11
.
101 MMIETTA ST., N.W., SUITL 3100
0 -
-
ATLANTA, GEORGIA 30303
%."..../
JUN 2 51981
, [
3
Carolina Power and Light Company
r g .~
)
,^
Attn:
J. A. Jones, Senior Executive
U b{C
"
-
"
Vice President and Chief
Operating Officer
i
JUL 2 3198I" IS
-
411 Fayetteville Street
ucutou
-
-
Raleigh, NC
27602
- " 'Y55"
'
'
%,
6
Gentlemen:
(g
,
Subject:
Report Nos. 50-325/dl-10 and 50-324/81M
This refers to the routine safety inspection conducted by Mr. J. Blake of this
office on May 5-8 and 12-15,1981, of activities authorized by NRC Operating
License Nos. DPR-62 and DPR-71 for the Brunswick facility, and to the discussion
of our findings held with Mr. R. Morgan, Plant Operations Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is dis-
cussed in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any infonnation that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such infonnation.
If your receipt of this letter has been delayed such that
less than seven days are available for your review, please notify this ofrice
pmmptly so that a new due date may be established.
Consistent with Section
2.790(b)(1), such application must be accompanied by an affidavit executed by
T6o/
.3
ih
8107240334 810625
PDR ADOCK 05000324
G
-
- -
-
.
JUN 2 51981
'
(
-*
.
D
Carolina Power and Light Company
-2-
the owner of the information which identifies the document or part thereof
sought to be withheld, and a full statement of the reasons on the basis of
which it is claimed that the information should be withheld from public .
disclosu re.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
<
sought to De withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions ~ concerning this letter, we will be glad to discuss
them with you.
-
Sincerely,
.
EL.
R. C.
ewis, Acting Director
-
Division of Resident and Reactor
Project Inspection
Enclosure:
Inspection Report Nos. 50-325/81-10
and 50-324/81-10
cc w/ encl:
C. R. Dietz, Plant Manager
-
-
- . .
- .
,_
-
..
- ._
- .
- _ - .
_
_ _
_