r
.-
,,,
M"%o
OFFICIAL COPY
UNITED STATES
8
E
yN
NUCLEAR REGULATORY COMMISSION
4jd
.
$
/t E
REGION 11
Q
101 MARlETTA ST., N.W., SUITE 3100
g
ATt.ANTA, G EORGI A 30303
.....
AN 0 31981
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
Advanced Systems and Technology
P. O. Box 529100
Miami, FL 33152
Gentiemen:
Subject: Report Nos. 50-335/81-10 and 50-389/81-06
This refers to the special safety inspection conducted by Mr. J. J. Lenahan of
this office on May 4-7, 1981, of activities authorized by NRC Operating License
No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie facility. Our
preliminary findings were discussed with Mr. B. J. Escue, Plant Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
-appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of t is
letter and the enclosed report will be placed in the NRC's Public Document com.
If the report contains any ir,Nrmation that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part thereof sought to be with-
held, and a full statement of the reasons on the basis of which it is claimed
that the information should be withheld from public disclosure.
This section
further requires the statement to address with specificity tne considerations
8107240292 810713
PDR ADOCK 05000369
0
-
'
%
JUN O 3198;
4
Florida Power and Light Company
2
listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be
incorporated as far as possible into a separate part of the arfidavit. If we
do not hear from you in this regard within the specified periods noted above,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
$ l.
R. C.
ewis, Acting Director
Division of Resident and
Reactor Project Inspection
En' closures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-335/81-10
-
and 50-389/81-06
cc w/ encl:
C. - M. Wethy, Plant Manager
N. Weems, Assistant GA
Construction Manager
B. J. Escue, Plant Manager
.
luem uamma