Forwards IE Insp Repts 50-335/81-10 & 50-389/81-06 on 810504-07 & Notice of Violation
ML20009D724
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/03/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20009D717 List:
References
NUDOCS 8107240292
Download: ML20009D724 (2)


See also: IR 05000335/1981010

Text

r

.-

,,,

M"%o

OFFICIAL COPY

UNITED STATES

8

E

yN

NUCLEAR REGULATORY COMMISSION

4jd

.

$

/t E

REGION 11

Q

101 MARlETTA ST., N.W., SUITE 3100

g

ATt.ANTA, G EORGI A 30303

.....

AN 0 31981

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentiemen:

Subject: Report Nos. 50-335/81-10 and 50-389/81-06

This refers to the special safety inspection conducted by Mr. J. J. Lenahan of

this office on May 4-7, 1981, of activities authorized by NRC Operating License

No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie facility. Our

preliminary findings were discussed with Mr. B. J. Escue, Plant Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

-appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of t is

letter and the enclosed report will be placed in the NRC's Public Document com.

If the report contains any ir,Nrmation that you believe to be exempt from disclo-

sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part thereof sought to be with-

held, and a full statement of the reasons on the basis of which it is claimed

that the information should be withheld from public disclosure.

This section

further requires the statement to address with specificity tne considerations

8107240292 810713

PDR ADOCK 05000369

0

PDR

-

'

%

JUN O 3198;

4

Florida Power and Light Company

2

listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be

incorporated as far as possible into a separate part of the arfidavit. If we

do not hear from you in this regard within the specified periods noted above,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

$ l.

R. C.

ewis, Acting Director

Division of Resident and

Reactor Project Inspection

En' closures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-335/81-10

-

and 50-389/81-06

cc w/ encl:

C. - M. Wethy, Plant Manager

N. Weems, Assistant GA

Construction Manager

B. J. Escue, Plant Manager

.

luem uamma