ML20009D727
| ML20009D727 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 06/03/1981 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20009D717 | List: |
| References | |
| 50-389-81-06, 50-389-81-6, NUDOCS 8107240295 | |
| Download: ML20009D727 (1) | |
Text
r 1
.+
1 APPENDIX A NOTICE OF VIOLATION Florida Power and Light Company Docket No. 50-389 St. Lucie 2 License No. CPPR-144 As a result of the inspection conducted on May 4-7, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified.
10 CFR 50, Appendix B, Criterion V, as implemented by FP&L Topical Quality Assurance Report Number 5.0, requires that activities affecting quality shall be prescribed by documented instructions, procedures or drawings, and shall be accomplished in accordance with these instructions, procedures or drawings.
i.ontrary to the above, there were no documented instructions or procedures for control and disposition of site generated nonconformance reports within the Ebasco Site Support Engineering group (ESSE).
This is a Severity Level VI Violation (Supplement II.F).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within twenty-five days of the date of this Notice, a written state-ment or explanation in reply, including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as' amended, this response shall be submitted under oath or affirmation.
JUN 0 31981 Date:
8107240295 810713 PDR ADOCK 05000389 G
_