05000316/LER-1981-019-01, Plug Found Missing from Tee in Sensing Line to Upper Containment Pressure Transmitters PPA-310 & 311.Caused by Personnel Neglect in Replacing Plug Following Removal During Testing

From kanterella
(Redirected from ML20009D711)
Jump to navigation Jump to search
Plug Found Missing from Tee in Sensing Line to Upper Containment Pressure Transmitters PPA-310 & 311.Caused by Personnel Neglect in Replacing Plug Following Removal During Testing
ML20009D711
Person / Time
Site: Cook 
Issue date: 07/15/1981
From: Rischling J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20009D704 List:
References
LER-81-019-01X, LER-81-19-1X, NUDOCS 8107240287
Download: ML20009D711 (2)


LER-1981-019, Plug Found Missing from Tee in Sensing Line to Upper Containment Pressure Transmitters PPA-310 & 311.Caused by Personnel Neglect in Replacing Plug Following Removal During Testing
Event date:
Report date:
3161981019R01 - NRC Website

text

!

UPDATE REPORT - PREVIOUS REPORT DATE 06-10-81 l

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l lh (P L E A

" sNT OR TYPE ALL REQUIRED INFORMATION) lo j il l M l I l D lC lC l2 l@l 01010 l 0 l 0 l 0 l010 l 06 0l 01@l 4 l 1 !1 Il 11 l@l l

l@

't.

8 9 LICENSEE CODE 14

'S UCENSE NUMdER 25 26 LCENSE TYPE JO SiCAT58 CON'T lolil 3M l L l@i 01 5101010 ! 311 l 6 l@l 0 l5 11 12l8l1l@l017Il!518l1 l@

7 8

60 61 COCKET NLMSER 68 63 EVENT DATE 74

S RE8CRT CATE

$0 EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES O'o I o i 21 l AFTER ENTERING MODE 3 FOLLOWING A REFUELING OUTAGE, IT WAS DISCOVERED THAT A PLUG WAS l

io i3i (MISSING FROM A TEE IN THE SENSING LINE TO THE UPPER CONTAINMENT PRESSURE TR u1SMITTERS, I

io ;4; l PPA-310 AND PPA-311. THIS IS NON-CONSERVATIVE IN RESPECT TO T.S. 3.6.1.1.

I lo Isl I I

10161l lo l7l l l

101811 I

E CODE SUSC E COMPONENT CODE SL8CCDE SU E

10191 l Il B l@ l A l@ l Fl@ lZ lZ lZ lZ lZ lZ l@ l Z l@ U @

RO EVENT Y AR REPORT O CODE N.

h *LER:yuggl21811l l-l 101119l l/l 10 l 11 lXl l-l l1i E

22 23 24 26 27 23 29 30 31 32

  1. C N AC ON ON PLANT -

ME HOURS 22 SS I FOR 8

SUPPLIE

% FACTURER l A l@[y@

l Z l@

l Zl@

l0l0l010l [Y l@

l Y l@

lZl@

lZl9l919l@

33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 Ioi1 NVESTIGATION REVEALED THAT THE PLUG FROM A TEE IN THE SENSING LINE TO PPA-310 WAS l

I lt i, ii i l REMOVED DURING THE TYPE A INTEGRATED LEAKRATE TEST. DURING THE INSTRUMENT SETUP FOR I

i,,,,lTHIS TEST, A ROTAMETER WAS INADVERTANTLY INSTALLED AT THE TEE. THIS ROTAMETER WAS I

l;TTlI LATER MOVED TO THE CORRECT TEST F0 INT. WHEN THE ROTAMETER WAS REMOVED, PERSONNEL I

ii i4; ; NEGLECTED TO REPLACE THE PLUG IN THE TEE. THIS WAS NOT NOTICED (SEE ATTACHED SUPPLEMENT)

SA

% POWER OTHER STATUS 015 RY DISCOVERY DESCRIPTION

I115 l lC l@ l 0 l 010 l@l NA l-l A l@l INSTRUMENTATinN rHrrK l

A TIVlW CO TENT i s t l Z l @D OF RELEASE [,g_j@l NA l

l NA I

CELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE

.It PERSONNEL EXPOS ES cESCRiPTON@

NuveER TYPE l t 171101010 l@l Zl@l NA l

i '

' PERSONNe't INJV IES NureeR oESCRiPTiON lt tall010._[Q_j@l NA l

7 f 1 11 12 80 T E DESCR PT ON

l 19l lZ l@l NA l

8

  • PustETv 8107240287 810715 8

DESCR PTION @

PDR ADOCK 05000316 NRC USE CNLY ISSU E l: I o l l N f@l NA S

PDR l

llll t;ill;;i lj

'7 8.9 to 58 69 80 %

NAME O PREPARER PHONE:

~

I ATTACHMENT TO LER # 81-019/01X-1 SUPPLEMENT TO CAUSE DESCRIPTION DURING THE Tf 3T SINCE AN ISOLATION VALVE UPSTREAM 0F THE TEE WAS SHUT.

TO PREVENT REOCCURRENCE OF THIS TYPE OF INCIDENT, THE FOLLONING CORRECTIVE ACTIGJS HAVE BEEN TAKEN.

ALL INTEGRATED LEAK RATE PRESSURE POINTS HAVE BEEN IDENTIFIED WITH METAL TAGS AND THE PROCEDURE MODIFIED INSURING THAT PERSONNEL INSTALL THE TEST INSTRUMENTATION ONLY AT THE DESIGNATED TEST POINTS.

IN ADDITION, THE PROCEDURE RESTORATION STEP HAS BEEN MODIFIED TO INSURE THAT THESE TEST POINTS HAVE BEEN ISOLATED AND THE TEST CONNECTIONS CAPPED.

IN ADDITION TO THE AB0VE CORRECTIVE ACTIONS TAKEN, THE FOLLOWING WILL BE IMPLEMENTED BY JULY 31, 1981.

PROCEDURES WILL BE PREPARED TO CHECK ALL INSTRUMENT AND SAMPLING LINES TO INSURE THAT VALVES AFFECTING CONTAINMENT ISOLATION ARE POSITIONED CORRECTLY PRIOR TO PLANT STARTUP FROM COLD SHUTDOWN. THIS VALVING CHECK WAS COMPLETED FOR UNIT 2 ON JULY 9, 1981, PRIOR TO ENTERING MODE 4.

A PriOCEDURE WILL BE PREPARED FOR THE DOUBLE VERIFICATION OF ALL SAFETY-RELATED INSTRU-fiENTATION VALVING TO INSURE CORRECT INSTRUMENT VALVE POSITIONS UPON THE COMPLETION OF INSTRUMENT REPAIRS AND CALIBRATION.

IN ADDITION, THIS DOUBLE VERIFICATION FOR VALVE POSITION WILL BE INCORPORATED IN ALL APPLICABLE SURVEILLANCE AND INSTRUMENT MAINTENANCE PROCEDURES.