Forwards IE Insp Rept 50-395/81-10 on 810511-15.No Noncompliance Noted
ML20009D685
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/17/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20009D686 List:
References
NUDOCS 8107240270
Download: ML20009D685 (2)


See also: IR 05000395/1981010

Text

[*%

UNITED STATES

OFFICIAL COPY

,g

NUCLEAR REGULATORY COMMISSION

g

o g-

,

l )e

g

REGION 11

/

5f

%.m,.Y,pj

101 MARIETTA ST,. N.W., SUITE 3100

9,

A

ATL ANTA, GEORGI A 30303

  • r

....

JUN 171981

j',f(&l&'b

2

I

OL.DLf/[//p

South Carolina Electric and Gas Company

Attn:

T. C. Nichols, Jr. , Vice President

p

a

-

Power Production and System Operations

'l

-

gg ,

P. O. Box 764

e 3ISB N T

Columbia, SC

29218

    • 7 4mp

'S

,(

Gentiemen:

Subject:

50-395/81-10

This refers to the routine safety inspection conducted by Mr. N. Economos

of this office on May 11-15, 1981, of activities authorized by NRC Construction

Permit No. CPPR-94 for the V. C. Summer facility, and to the discussion of our

findings held with Mr. O. S. Bradham, Station Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our' findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is dis-

cussed in the enclosed report.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such infomation.

If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

Section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the -infonnation which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

3h

5

/ I

8107240270 010617

PDR ADOCK 05000

0

-

f~ .

'

s

.

.

South Carolina Electric and

JUN I 71981

Gas Company

-2-

sought to be withheld shall be incorporated as far as possible into e separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

E &.

R. C. L wis, Acting Director

Division of Resident and Reactor

Project Inspection

Enclosure:

Inspection Report No. 50-395/81-10

cc w/ encl:

J. B. Knotts, Jr.

Debevoise and Libennan

A. A. Smith, Site QA

Coordinator

0. S. Bradham, Manager

Nuclear Operations

.

9

I

f

l

!

I

!

L.