ML20009D685
| ML20009D685 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 06/17/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20009D686 | List: |
| References | |
| NUDOCS 8107240270 | |
| Download: ML20009D685 (2) | |
See also: IR 05000395/1981010
Text
[*%
UNITED STATES
OFFICIAL COPY
,g
NUCLEAR REGULATORY COMMISSION
g
o g-
,
- l )e
g
REGION 11
/
5f
%.m,.Y,pj
101 MARIETTA ST,. N.W., SUITE 3100
9,
A
ATL ANTA, GEORGI A 30303
- r
....
JUN 171981
j',f(&l&'b
2
I
OL.DLf/[//p
South Carolina Electric and Gas Company
Attn:
T. C. Nichols, Jr. , Vice President
p
a
-
Power Production and System Operations
'l
-
gg ,
P. O. Box 764
e 3ISB N T
Columbia, SC
29218
- 7 4mp
'S
,(
Gentiemen:
Subject:
50-395/81-10
This refers to the routine safety inspection conducted by Mr. N. Economos
of this office on May 11-15, 1981, of activities authorized by NRC Construction
Permit No. CPPR-94 for the V. C. Summer facility, and to the discussion of our
findings held with Mr. O. S. Bradham, Station Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our' findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is dis-
cussed in the enclosed report.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such infomation.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
Section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the -infonnation which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
3h
5
/ I
8107240270 010617
PDR ADOCK 05000
0
-
f~ .
'
s
.
.
South Carolina Electric and
JUN I 71981
Gas Company
-2-
sought to be withheld shall be incorporated as far as possible into e separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
E &.
R. C. L wis, Acting Director
Division of Resident and Reactor
Project Inspection
Enclosure:
Inspection Report No. 50-395/81-10
cc w/ encl:
J. B. Knotts, Jr.
Debevoise and Libennan
A. A. Smith, Site QA
Coordinator
0. S. Bradham, Manager
Nuclear Operations
.
9
I
f
l
!
I
!
L.