ML20009D166

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Five Categories of Info Re Facility & B&W.Forwards Documents Listed in App.W/O Encls
ML20009D166
Person / Time
Site: Crystal River 
Issue date: 07/17/1981
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Michael Brown
CARLTON, FIELDS, WARD, EMMANUEL, SMITH & CUTLER
References
FOIA-81-236 NUDOCS 8107230243
Download: ML20009D166 (4)


Text

P bR

(

p ct UNITED STATES

~

0,h 8

NUCLEAR REGULATORY COMMISSION g

D p

WASHINGTON, D. C. 20555 Y

July 17,1981 h

7 y

JUL 17 ES1* ; 3' Mark A. Brown, Esquire

\\

v.s. g g = s Carlton, Fields, Ward, Emmanuel, B

Smith and Cutler, P.A.

.The Exchange Bank Building N

P. O. Box 3239 IN RESPONSE EfE Tampa, FL 33601 TO F01A-81-236

Dear Mr. Brown:

This is in partial response to your letter dated June 15, 1981 in which you rcquested, pursuant to the Freedom of Infonnation Act, five categories of information regarding the Crystal River Plant and Babcoc!: & Hilcox Company.

The documents listed on the aprendix are enclosed.

During a July 8, telephone conversation with Mr. Stephen Isaacs'of nty staff, you were informed that the documents would not be identified individually with the specific items of your raquest.

The charge for reproducing recoros not located in the NRC Public Document n

Room is five cents ($0.05) per page, as specified in 10 CFR 9.14(b).

Accordingly, the cost of reproducing the enclosed 461 pages is $23.05.

Please send a check made payable to the U.S. Nuclear Regulatory Commission in the amount of $23.05, along with a copy of this letter to the Director, Division of Rules and Records, Room MNBB-4210 U.S. Nuclear Regulatory Commission Washington, DC 20S55.

The NRC has not completed its review of the remaining documents subject to your request. We will respond as soon as the review is completed.

Sincerely, p,, b $ J

^*"

J. M. Felton, Director Division of Rules and Records Office Lf Administration

Enclosures:

As stated a

e 8107230243 810717 Nwh!236 P DR..

R2:

F0!A-81-236 3

APPENDIX 1.

June 8, 1978 Memo to R. W. Reid from P. S. Check, Loose Part Detection Programs at B&W Plants

2. ' May 1,1978 Memo to R. Reid from Acting Chief Environmental Evaluation Branch, Crystal River Unit 3 - Steam Generator Repair (TAC 7469) 3 May 24, 1978 Memo to R. Reid from Acting Chief, Environmental Evaluation Branch, Crystal River Steam Generator Repair (TAC 7469) 4.

April 7,1978 Memo to V. Stello from K. V. Seyfrit, Movement of Burnable Poison Rod Assemtlies from Crystal River Unit 3 Core 5.

March 7, 1978 Preliminary Notification - PNO-78-41 6.

June 6. 1978 Determination of Proposed Licensing Amendment 7.

September 15, 1978 Letter to P. S. Check from J. H. Taylor 8.

Undated Requesting Remarks TAC #7469 9.

April 14, 1978 Reactor Vessels and Internals, Crystal River Unit 3.

10. Undated Public Information Statement - St. Peterkberg, Florida 11.- June 30,1978 Note to S. Weiss from C. Nelson, Crystal River
12. Arp11 3, 1978 Memo to R. W. Reid from C. Nelson Forthcoming Meeting with Florida Power Corporation
13. April 6, 1978 Meeting Notice FPC and B&W
14.. April 5, 1978 CR-3 Planned Repair Schedule Assumptions
15. Undated Engineering Information
16. Undated Fuel Related Discussion
17. April 3, 1978 Topical Report T.S.-78-4-1 i
18. March 27, 1978 Crystal River 3 - Burnable Poison Rod Assembly Failure
19. August 30, 1978 Memo to R. W. Reid from P. S. Check, Continued

-2 Operation of Crystal River 3 (TACS 7469 and 7758)

Re: F01A-81-236

(

~

APPENDIX S

20.

September 22, 1978 Memo to B. Grimes from G. Knighton, Occupational Exposures from Steam Generator Repair at Crystal River Unit 3.

21.. August 25. 1978 Memo to R. W. Reid from U. S. Noonan.

Evaluation of CR 3 Steam Generator Damage Resulting from Burnable Poison Rot Assembly Break-Up 22._ Undated Regulatory Guide 1.133

23. June 25.1981[

Letter to L. Phillips from R. C. Kryter

24. June 16, 1981 Pacific Gas and Electric - Evaluation of Safety Consequences, lost TV Camera Lens Housing of Salem Unit One
25. Undated-More Information Regarding an Inspection

' 26. June 25, 1981.

Notes of a telephone conversation with Bob Kryter

27. August 28, 1980 Memo to T. Novak from L. S. Rubenstein, Turkey Point Unit 3 - Shattered Metal Fragments Found in Steam Generator

' 28.

September _9,1980 -

Memo to W.'Johnstc' from S. A. Varga, same as above

29. October 6,1980 Memo to T. Novak from L. S. Rubenstein, same as #27
30. August 3, 1977 Memo to R. E. Uhrig from G. Lear, copy of the Order for Modification of License
31. June 5, 1980 Memo to D. G. Eisenhut from S. S. Pawlicki, Turkey Point Unit 3 - Shattered Metal Fragments Found in Steam Generator
32. December 31, 1979 Reportable Occurrence 250-79-39 33.

September 21, 1978 Memo to S. A. Varga from P. S. Check, Implementation Evaluation of Proposed Regulatory Guide 1.133.

34.

February 1972 B&W Topical Report (BAW-10037)

35. September 1972 B&W Topical Report Rev. 1

-36.

November 1972 B&W Topical Report Rev. 2 t

c

\\

e a.

-r F

t-e---1 hy

'-'e(

y

'v g-M

  • m-gm.r y-p m-'

,w-1--

i.---geu-..

,--.r,,y-m e ww,- w wA---a,gu>g,

-yqmyyee w-y-y-

--wa,,g' y t-

-.r3

Re: F0!A-81-236

+

APPENDIX

+

f

- 37.

September 1972 B&WTopicalReport(BAW-10038) 38.

Novenber 1972 B&W Topical. Report Rev. 1 i

39. '_ August 1976 Topical Report i

li t

c l

L

.. ~g

?

l2l s

';+.,-- -

,,A,-,

.n--

en r - w a.

e

.,~+,,ev.

..e

-,, -.- ~, e c

,--,w