ML20009C663
| ML20009C663 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 07/09/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20009C664 | List: |
| References | |
| NUDOCS 8107210332 | |
| Download: ML20009C663 (2) | |
See also: IR 05000461/1981016
Text
.-,
/*
R CICg
- [g k
'q
UNITED STATES
r
[ '
) y,
g
NUCLEAR REGULATORY COMMISSION
,s
REGION 111
o,
[
799 ROOSEVELT ROAD
- .../
' GLEN ELLYN,ILLINolS 60137
'
'JUL
9 1981
e
co
e
t-
s
',
f
.
. )
Docket No. 50-461
-
61 J .,
,
J
?
9-
Illinois Power Company
2
JUL P.01981
~
ATTN:
Mr. W. C. Gerstner
-
,,,, ,ain n a m "
Executive Vice President
co*'55 o"
N' - }%..
500 South 27th Street
Decatur, IL 62525
\\ V. gis
,s
Gentlemen:
This refers to the routine safety' inspection conducted by Messrs.
R. B. Landsman and J. F. Norton of this office on June 24-26, 1981,
of activities at the Clinton Power Station, Unit 1, authorized by NRC
Construction Permit No. CPPR-137 and to the discussion of our findings
with Mr. G. M. Brashear and others of your staff at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection.
Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you or.your contractors believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by
telephone within seven (7) days from the date of this letter of your
intention to file a request for withholding; and (b) submit within
7
twenty-five (25) days from the date of this letter a written applica-
l
tion to this office to withhold such information.
Section 2.790(b)(1)
l
requires that any such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document
- or part sought to be withheld, and which contains a full statement of
the reasons on the basis wLich it is claimed that the information should
be withheld from public disclosure.
This section further requires the
i
r
s
/ /
0107210332 810709
PDR ADOCK 05000461
Q
- - -.
.-.
.-
.-
..-_-_,
-
- .
.
,--
..
JUL
9 1981
.
Illinois Power Company
-2-
statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods
noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosure:
IE Inspection
Report No. 50-461/81-16
cc w/ encl:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Gary N. Wright, Deputy Director
Randall L. Plant, Prairie
Alliance
.
RJI -
RIII
RIII
RIII
RIII
sp
y
my
.
ndsman/db
Norton
Williams
$pedsard
'hf fius
e
7/7/81
q [gl2 s
.
-
w
w
e
--me
m
-