Forwards IE Insp Rept 50-461/81-16 on 810624-26.No Noncompliance Noted
ML20009C663
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/09/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20009C664 List:
References
NUDOCS 8107210332
Download: ML20009C663 (2)


See also: IR 05000461/1981016

Text

.-,

/*

R CICg

  • [g k

'q

UNITED STATES

r

[ '

) y,

g

NUCLEAR REGULATORY COMMISSION

,s

REGION 111

o,

[

799 ROOSEVELT ROAD

    • .../

' GLEN ELLYN,ILLINolS 60137

'

'JUL

9 1981

e

co

e

t-

s

',

f

.

. )

Docket No. 50-461

-

61 J .,

,

J

?

9-

Illinois Power Company

2

JUL P.01981

~

ATTN:

Mr. W. C. Gerstner

-

,,,, ,ain n a m "

Executive Vice President

co*'55 o"

N' - }%..

500 South 27th Street

Decatur, IL 62525

\\ V. gis

,s

Gentlemen:

This refers to the routine safety' inspection conducted by Messrs.

R. B. Landsman and J. F. Norton of this office on June 24-26, 1981,

of activities at the Clinton Power Station, Unit 1, authorized by NRC

Construction Permit No. CPPR-137 and to the discussion of our findings

with Mr. G. M. Brashear and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you or.your contractors believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by

telephone within seven (7) days from the date of this letter of your

intention to file a request for withholding; and (b) submit within

7

twenty-five (25) days from the date of this letter a written applica-

l

tion to this office to withhold such information.

Section 2.790(b)(1)

l

requires that any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document

or part sought to be withheld, and which contains a full statement of

the reasons on the basis wLich it is claimed that the information should

be withheld from public disclosure.

This section further requires the

i

r

s

/ /

0107210332 810709

PDR ADOCK 05000461

Q

PDR

- - -.

.-.

.-

.-

..-_-_,

-

- .

.

,--

..

JUL

9 1981

.

Illinois Power Company

-2-

statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods

noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-461/81-16

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

Gary N. Wright, Deputy Director

Randall L. Plant, Prairie

Alliance

.

RJI -

RIII

RIII

RIII

RIII

sp

y

my

.

ndsman/db

Norton

Williams

$pedsard

'hf fius

e

7/7/81

q [gl2 s

.

-

w

w

e

--me

m

-