ML20009C540
| ML20009C540 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 07/07/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML20009C542 | List: |
| References | |
| NUDOCS 8107210215 | |
| Download: ML20009C540 (2) | |
See also: IR 05000483/1981015
Text
<
'o
UNITED STATES
E
NUCLEAR REGULATORY COMMISSION
o
L
'$
REGION 111
(
e'
799 ROOSEVELT ROAD
g
/
atEN Ettvu. ittisOis soia7
.....
JUL 7
1981Sk
Docket No. 50-483
6l\\
9
.
.
/
\\
Union Electric Company
&,
N
h/
ATTN:
Mr. John K. Bryan
N
Vice President - Nuclear
Post Office Box 149
5h
D
St. Louis, MO 63166
f
%
5
l
Gentlemen:
/
+LTWW{ '
This refers to the routine safety inspection conducted by Mr. W. A. Hansen
of this office on June 1-30, 1981, of activities at the Callaway Plant, Unit 1,
authorized by NRC Construction Permit No. CPPR-139 and to the discussion of
our findings with Mr. Weber and oth rs of the Callaway staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation.
Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withneld, and which contains
a full statement of the reasons on the basis which it is claimed that the
information should be withheld from p"'.lic disclosure. This section further
requires the statement to addrees with specificity the considerations listid
56al
s
!I
8107210215 810707
PDR ADOCK 05000483
0
.
!
k'
Union Electric Company
-2-
JUL 7
he:
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
If
incorporated as far as possible into a separate part of the affidavit.
we do not hear.from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
R. F. Ileishman, Acting Director
Division of Resident and Project
Inspection
Enclosure:
IE Inspection
Report No. 50-483/81-15
cc w/ encl:
W. 11. Weber, Manager
Nuclear Construction
'
DMB/ Document Control Desk (RIDS)
,
Resident Inspector, RIII
Region IV
K. Drey
.
Ronald Fluegge, Utility
l
Division, Missouri Public
l
Service Commission
!
'
!
I
l
i
,
i
i
I7
R11I
RIII
RIII
f]
I'
'
s
ansen/cc
Knop
lluis an
!
j
l
l
L