ML20009C473

From kanterella
Jump to navigation Jump to search
Revised Tech Specs 6.5.1.7,6.5.2.2,6.5.2.3,6.5.2.4,6.5.2.5, 6.5.2.6 & Page 6-7 for Administrative Controls
ML20009C473
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/16/1981
From:
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20009C465 List:
References
NUDOCS 8107210122
Download: ML20009C473 (2)


Text

. -

O ADMINISTRATIVE CONTROLS c.

Review of all proposed changes to Appendix "A" Technical Specifications.

d.

Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety.

e.

Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evaluation and recommendations to prevent recurrence to the Vice President Nuclear and to the Chainnan of the Nuclear Operations Boara.

f.

Review of those REPORTABLE OCCURRENCES requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission.

g.

Review of facility operations to detect potentici safety hazards.

h.

Performance of special reviews, investigations or analyses and reports thercr.n as requested by the Chairman of the Nuclear Operations Board.

i. Review of the Plant Security Plan and implementing procedures.

l

j. Review of the Emergency Plan and implementing procedures.

l AUTil0RITY 6.5.1.7 The Plant Review Board shall:

l a.

Recommend to the General Manager written approval or disapproval of items considered under 6.5.1.6(a) through (d) above.

l b.

Render determinations in writing with regard to whether or not each item considered under 6.5.1.6ta) through (e) above cor.stitutes an unreviewed safety question.

l.

c.

Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Vice Presi-ident Nuclear and the Nuclear Operations Board c disagreement between the PRB and the General Manager; however, the General Manager shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.

l i

j TROJAN-UNIT 1 6-7

^

8107210122 810716 l

DR ADOCK 05000

ADMINISTRATIVE CONTROLS COMPOSITION

! 6.5.2.2 The NOB shalI be composed of the:

Chairman:

General Manager Technical Functions l

Member:

. Designated Mechanical Engineer Memben Designated Electrical Engineer Member:

Designated Nuclear Engineer Member:

Designated Quality Assurance Engineer Member:

Designated Physical Scientist Member:

Designated Health Physicist l

Designated members shall be appointed in writing by the Vice President Nuclear. Designated members (and alternates) shall have an academic degree in an engineering or science field and in addition shall have a minimum of 5 years technical experience of which a minimum of 3 years shall be in one or more areas given above.

2 ALiERNATES 6.5.2.3 All alternate members shall be appointed in writing by the Vice President Nuclear to serve or a temporary basis; however, no more than two alternates shall participate as voting members in NOB activities at any one time.

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NOB Chairman to provide expert advice to the N08.

MEETING FREQUENCY 6.5.2.5 The N0B shall meet at least once per calendar quarter during the initial year of facility operation following fuel loading and at least once per six months thereafter.

_UORUM Q

6.5.2.6 A quorum of NOB shall consist of the Chairman or his designated alternate and at least three members including alternal;s. No more than a minority of the quorum shall have line responsibility for operation cf the facility.

l TROJAN-UNIT 1 6-9