ML20009C226

From kanterella
Jump to navigation Jump to search
Forwards LER 81-046/01T-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009C226


LER 81-046/01T-0:on 810423,insp/leak Detection Measures Assumed for Postulated Breaks in Loop B 10-inch Accumulator Injection Line in Lieu of Structural Restraints to Prevent Unacceptable Interactions.Design Will Be Revised
ML20009C231
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/07/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C231 (1)
Forwards LER 81-046/01T-0.Detailed Event Analysis Encl
ML20009C225
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/07/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C225 (3)