ML20009C209

From kanterella
Jump to navigation Jump to search
Forwards LER 81-006/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009C209


LER 81-006/03L-0:on 810409,valve 2PR-8 Failed to Open During on-line Insp.Caused by Faulty Valve Operator Diaphragm.Valve Repaired & Verified Operable
ML20009C213
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/08/1981
From: Jackie Jones
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C213 (1)
Forwards LER 81-006/03L-0.Detailed Event Analysis Encl
ML20009C208
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/08/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C208 (2)