ML20009C197

From kanterella
Jump to navigation Jump to search
Forwards LER 81-088/03L-0
Date released: 01/23/2020 Download: ML20009C197


LER 81-088/03L-0:on 810521,during Calibr of Catalytic Hydrogen Recombiner,While in Mode 5 Initial Fuel Loading, Gaseous Waste Was Released to Environ.Caused When Exhaust Isolation Valve on Hydrogen Inlet Analyzer Was Left Open
ML20009C203
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/20/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C203 (3)
Forwards LER 81-088/03L-0
ML20009C196
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/18/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C196 (1)