Y OPERATING DATA REPORT DOCKET NO. 50-301 DATE 7-8-81 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES . wom:
2. REPORTING PERIOD: MAY 1981 . . Sj@
3. LICENSED THERMAL POWER (MW'?): 1518. . . No
4. NAMEPLATE RATING (GROSS Mul'.): 523.8 . . 30
5. DESIGN ELECTRICAL RATING (kET MUE): 497. . . Gy@
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519. . . 03
7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 495. ........................ r!$$
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: 8lS NOT APPLICABLE [8 <
9. POWER. LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE o a:
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE 63@g THIS MONTH YP TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 3,623 77.424 -.
12. NUMBER OF HOURS REACTOR WAS CRITICAL Mi 2,725.9 69,275.9 ' Khv56/7-'#~Si
13. REACTOR RESERVE SHUTDOWN HOURS 0.0__ 0.0 18 6~7
14. HOURS GENERATOR ON LINE Cl7.7 2,703.2 68,001.7. 3 f*1'ud M W
15. UNIT RESERVE SHUTDOWN HOURS 3.3 6.3 130.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 186,873 3,982,762 92,772,500
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 61,520 1,345,960 31,469,810
18. NET ELECTRICAL ENERGY GENERATED (MWH) 55 1,53 1,282,937 29,9 %
19. UNIT SERVICE FACTOR 21.2 74.6 87.8 I
20. UNIT AVAILABILITY FACTO? 21.6 74.8 88.0 -) J[$cirsed ?'-/d-
21. UNIT CAPACITY FACTOR (USl.'G MDC NET) 15.0 71.5 78.8
22. UNIT CAPACITY FACTOR (USING JT! NET) 14.9 71.2 77.8
23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: >N060085199MN June 1, 1981 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

V WIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 UNIT NAME Point Eeach Unit 2 Y '

REPORT MONTH May' 1981 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811

~

m c Wbo 4 o

.h au "co .'i t aae Po p *c En co

No. Date g gg g jjg Licensee Event y g'g Cause and Corrective Action 4

e om o ox Report No. m Eo To Prevent Recurrence C3 - 84 emc o

C 3 0 8

1 810417 S( 515.3 )C

~ -

1 N/A ZZ ZZZZZ5 The unit was shutdown for its v' annual refueling outage. Unit 2 7M

' , was taken critical on May 21, 1981, at 2106 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.01333e-4 months <br /> and placed on line 0902 hours0.0104 days <br />0.251 hours <br />0.00149 weeks <br />3.43211e-4 months <br /> on May 22, 1981.

! e 0 2 810529 70.95 )E 1 N/A

/V S( w ZZ ZZZZZ2 The unit was shutdown for license l7. fog exam startups. Unit 2 was taken critical at 2254 hours0.0261 days <br />0.626 hours <br />0.00373 weeks <br />8.57647e-4 months <br /> on May 31, 1981, and placed on line at 0102 hours0.00118 days <br />0.0283 hours <br />1.686508e-4 weeks <br />3.8811e-5 months <br /> on June 1, 1981.

1 3 F: Forced Reason: Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER File D- Regulatory Restriction 4- Other (explain) (NUREG-0161)

. E- 0:gerator Training & License Exam F- Admir;istrative 5 AD-28B Exhibit I- Same G- Operat;ional Error (explain) Source (01-78) H- Other (explain)

- _ _ _ - _ - . _ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - - _ _ _ - _ _ _ _ _ - _ ~