Text
._
Y OPERATING DATA REPORT DOCKET NO. 50-301 DATE 7-8-81 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2
. NOTES wom:
- 2. REPORTING PERIOD:
MAY 1981 Sj@
- 3. LICENSED THERMAL POWER (MW'?): 1518.
No
- 4. NAMEPLATE RATING (GROSS Mul'.):
523.8 30
- 5. DESIGN ELECTRICAL RATING (kET MUE): 497.
Gy@
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.
03
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 495.
r!$$
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
8lS NOT APPLICABLE
[8 <
- 9. POWER. LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE o a:
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE 63@g THIS MONTH YP TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 3,623 77.424
' Khv56/7-'#~Si
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL Mi 2,725.9 69,275.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0__
0.0 18 6~7
- 14. HOURS GENERATOR ON LINE Cl7.7 2,703.2 68,001.7. 3 f*1'ud M W
- 15. UNIT RESERVE SHUTDOWN HOURS 3.3 6.3 130.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 186,873 3,982,762 92,772,500
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 61,520 1,345,960 31,469,810
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 55 1,53 1,282,937 29,9 %
88.0 -) J[$cirsed ?'-/d-6
- 19. UNIT SERVICE FACTOR 21.2 74.6 87.8 I
- 20. UNIT AVAILABILITY FACTO?
21.6 74.8
- 21. UNIT CAPACITY FACTOR (USl.'G MDC NET) 15.0 71.5 78.8
- 22. UNIT CAPACITY FACTOR (USING JT! NET) 14.9 71.2 77.8
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: >N060085199MN June 1, 1981 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
V WIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 UNIT NAME Point Eeach Unit 2 Y
REPORT MONTH May' 1981 COMPLETED BY C.
W.
Fay TELEPHONE 414/277-2811
~
m c
Wbo 4
.h "c
.'i t Po En o
au o
aae p *c co No.
Date g
gg g
jjg Licensee Event y
g'g Cause and Corrective Action 4
e om o
ox Report No.
m Eo To Prevent Recurrence C3 -
84 emc o
- C 3
0 8
1 810417 S( 515.3 )C 1
N/A ZZ ZZZZZ5 The unit was shutdown for its v'
annual refueling outage.
Unit 2 7M
~
was taken critical on May 21, 1981, at 2106 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.01333e-4 months <br /> and placed on line 0902 hours0.0104 days <br />0.251 hours <br />0.00149 weeks <br />3.43211e-4 months <br /> on May 22, 1981.
0 e
/V
)E 2
810529 S(
70.95 1
N/A ZZ ZZZZZ2 The unit was shutdown for license l7. fog w
exam startups.
Unit 2 was taken critical at 2254 hours0.0261 days <br />0.626 hours <br />0.00373 weeks <br />8.57647e-4 months <br /> on May 31, 1981, and placed on line at 0102 hours0.00118 days <br />0.0283 hours <br />1.686508e-4 weeks <br />3.8811e-5 months <br /> on June 1, 1981.
1 3
F: Forced Reason:
Method:
Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) l-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for LER File D-Regulatory Restriction 4-Other (explain)
E- 0:gerator Training & License Exam F-Admir;istrative 5 Exhibit I-Same AD-28B G-Operat;ional Error (explain)
Source (01-78)
H-Other (explain)
~