Forwards IE Insp Repts 50-354/81-07 & 50-355/81-07 on 810504-31.No Noncompliance Noted
ML20009B778
Person / Time
Site: Hope Creek  PSEG icon.png
Issue date: 06/29/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Martin T
Public Service Enterprise Group
Shared Package
ML20009B779 List:
References
NUDOCS 8107170153
Download: ML20009B778 (2)


See also: IR 05000354/1981007

Text

e

-

,

6

J

,, [

o[

4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

y ))

g

REGION 1

g g, O

j

631 PARK AVENUE

r

k.....,o#.

s

KING OF PRUSSIA, PENNSYLVANIA 19/.06

JUN 2s 1981

Docket Nos. 50-354

gp#

N

/

50-355

ps

FH

~

-

T

[q.- JUL 16193; m

Public Service Electric and Gas Company

u,i, -

. )

ATTN:

Mr. T. J. Martin

" " '55ca

Vice President

g

Engineering and Construction

v

80 Park Plaza -17C

y

Newark, New Jersey

07101

m

Gentlemen:

Subject: Combined Inspection 50-354/81-07 and 50-355/81-07

This refers to the routine safety inspection conducted by Mr. W. H. Bateman of

this office on May 4 - 31, 1981 at Nawark, New Jersey and Hope Creek Generating

Station, Units 1 and 2, Hancock's Bridge, New Jersey of activities authorized

by NRC License Nos. CPPR-120 and CPPR-121 and to the discussions of our findings

held by Mr. Bateman with Mr. A. E. Giardino of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2,790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the NRC's

!

Public Document Room.

If this recort contains any information that you (or your

contractors) believe to be exempt' from disclosure under 10 CFR 9.5(a)(4), it is

l

necessary that you (a) notify this office by telephone within ten (10) days from

the date of this letter of your intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter a written application to

this office to withhold such information.

Consistent with section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the owner

!

of the information which ider.tifies the document or part sought to be withheld,

,

and which contains a full statement of the reasons on the basis which it is

g

^

si i

l

!

8107170153 810629

l

PDR ADOCK 05000354

G

PDR

m

.

.

.

.

Public Service Electric and Gas

2

g 2a 1981

Comoany

claimed that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the consider-

ations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall

be incorporated as far as possible into a separate part of the affidavit.

If we

do not hear from you in this regard within the specified periods noted above,

the report will be placed in the Public Document Room. The telephone notification

of your intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor, Files,

Mail and Records, USNRC Region I, at (215) 337-5223.

No reply to this letter is required; however, should you have any questions con-

cerning this inspection, we will be pleased to discuss them with you.

Sincerely,

. .

R.RMimig,

ief

Projects Bra

  1. 2, Division of

Resident and Project Inspection

Enclosure:

Combined Office of Inspection and Enforcement Inspection

Report Numbers 50-354/81-07 and 50-355/81-07

cc w/ encl:

J. Boettger, General Manager, Corporate QA

. .

.

.

- ,