Advises That NRC Completed Review of Revision 4 Changes to Modified Amended Security Plan Transmitted by . Changes Are Consistent w/10CFR50.54
ML20009B622
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/02/1981
From: Clark R
Office of Nuclear Reactor Regulation
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
References
TAC-30207, NUDOCS 8107160454
Download: ML20009B622 (3)


Text

' '.

.m_ _

i JUL 0 21981 Q\\v@M - Ok Docket Nos. 50-245

'O and 50-336

/$f kJ JUL 0 819g;u h Mr. W. G. Counsil, Vice President Nuclear Engineering & Operations u.,n w, %

Northeast Nuclear Energy Company Nmos P. O. Box 270 g-d.~

Hartford, Connecticut 06101 g

Dear Mr. Counsil:

We have completed our review of th Revision 4 changes to the Millstone Nuclear Power Station Modified Ame, id Security Plan transmitted by your letter dated April 9,1981.

We have reviewed the changes and agree that the changes, as contained in the enclosure to your above referenced letter and your submittal of January 1981 plan are consistent with the provisions of 10 CFR Part 50.54(p).

The enclosu:e to your letter of April 9,1981 and your plan submitted January 1981 contain information of a type specified in 10 CFR 2.790(d) and will, therefore, be withheld from public disclosure.

Sincerely.

Original signed by Robert A. Clark Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing cc: See next page I.!STRIBUTION:

~

q oMet Fili)

M. Conner PM Kreutzer L PDR' ACRS-10 NSIC J. Heltemes TERA Gray Files ORB #3 Rdg D. Eisenhut 0 ELD Ol&E-3 RA Clark 0107160454 810702 PDR ADOCK 05000245 F

PDR omer >

ORB #3:DL OR #S:DL ORB 83:DL ORB #5:DL OR.

.. J Bf3; M.khhEek. hi.Uh...

h.

hN....MmShea

.D C......e,,d, R.. a r..~..

= ~^-')

mi) 7/ k/.81 7/g./81 7/2/81 7/7e/

7/k/81 7/z. _/81 1

y: crow m o m s cu* m OFFICIAL RECORD COPY

""*3'"3'

d J.

6 y ~.,\\,

UNITED STATES NUCLEAR REGULATORY COMMISSION a

k-WASHINGTON, D. C. 20006 5

k *.... /'

JUL 021981 Docket Nos. 50-245 and 50-336

. Mr. W. G. Counsil, Vice President Nuclear Engineering & Operations Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06101

Dear Mr. Counsil:

We have completed our review of the Revision 4 changes to the Millstone Nuclear Power Station Modified Amended Security Plan transmitted by your letter dated April 9,1981.

We have reviewed the changes and agree that the changes, as contained in the enclosure to your above referenced letter and your submittal of January 1981 plan are consistent with the provisions of 10 CFR Part 50.54(p).

The enclosure to your letter of April 9,1981 and your plan submitted January 1981 contcin information of a type specified in 10 CFR 2.790(d) and will, therefore, be withheld from public disclosure.

^

I:

Sincerely,

~) o.u.)

h-A Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing cc: See next page i

L

~*

Northeast Nuclear Energy. Company cc:

William H. Cuddy, Esquire Mr. John Shedlosky Day, Berry & Howard Resident Inspector / Millstone

' Counselors at Law

.c/o U.S.N.R.C.

One Constitution Plaza P. O. Drawer KK Hartford, Connecticut 06103 Niantic,. CT 06357 Mr. Charles Brinkman Natural Resources Defense Council Manager - Washington Nuclear 917 15th Street, N.W.

Operations Washington, D. C.

20005 C-E Power Systems Combustion Engineering, Inc.

Mr. Lawrence Bettencourt, First Selectman 4853 Cordell Aven., Suite A-1 Town of Waterford Bethesda, MD 20014 Hall of Records - 200 Boston Post Road Waterford, Connecticut 06385 Northeast Nuclear Energy Company ATTNt Superintendent Millstone Plant Connecticut Energy Agency Post Office Box 128 ATTN: Assistant Director, Rese.srch Waterford, Connecticut 06385 and Policy Development Department of Planning and Energy Waterford Public Library Policy Rope Ferry Road, Route 156 20 Grand Street Waterford, Connecticut 06385 Hartford, CT 06106

~U. S. Environmental Protection Agnecy Region I Office ATTN: EIS COORDINATOR Jo'in F. Kennedy Federal Building Boston, Massachusetts 02203 Northeast Utilities Service Company ATTN: Mr. James R. Himmelwright Nuclear Engineering and Operations P. O. Box 270 t

1 Hartford, Connecticut,06101 I

l j

i

_