Forwards IE Insp Rept 50-341/81-07 on 810616-19 & Notice of Violation
ML20009A930
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/30/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML20009A931 List:
References
NUDOCS 8107140507
Download: ML20009A930 (2)


See also: IR 05000341/1981007

Text

!('

o

UNITED STATES

g

NUCLEAR REGULATORY COMMISSION

o

h

,E

REGION lli

. .;.

\\p 3 { g'

p

7M ROOSEVELT ROAD

,

% * ..*

'

GLEN ELLYN. lLLINOIS 60137

\\

Y

D, p n ,

,

ll[

"

a.

JUN 3 0 A1

-

"L l 3193; %

.

3

uu,%,,,gWott

g

ccwy

$

Docket No. 50-341

The Detroit Edison Company

c)

W

AITN:

Mr. Donald A. Wells

Manager, Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward

of this office on June 16-19, 1981, of activities at Enrico Fermi Atomic

Power Plant, Unit 2, authorized by NRC Construction Permit No. CPPR-87

and to the discussion of our findings with Mr. T. Alessi at the cenclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as specified in enclosed Appendix A.

A written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room.

If the enclosures contain any

information that you or your contractors believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

office by telephone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information.

Section 2.790(b)(1) requires

that any such application must be accompanied by an affidavit executed by

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons on the

i o

elo714o507 810630

PDR ADOCK 05000341

G

PDR

-

.

.

Detroit Edison Company

-2-

JUN 3 01981

.

basis which it is claimed that the information should be withheld from

public disclosure. This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter,

the enclosures, and yeir response to this letter will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

/

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-341/81-01

cc w/encls:

DMB/Docueent Control Desk (RIDS)

,

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Eugene B. Thomas, Jr.,

Attorney

l

'

l

!

l

RIII

RIII

RI I

RIII

RIII

I

MV

'1.

-

,

i

Warc /jp

Danielson

Konklin

p,

d

gd

6/.2f 17

(el

p g

' 6/,2(i/f/

6/25/81

i

!