Text
- _ _ _ _ _ _ -
FOR DCS PROCESSING A
-
+
Original document not available
/"maak
to NRC
UNITED STATES
Certifiedbyh.Bf///7246th,
F'
[E
NUCLEAR REGULATORY COMMISSION
-
REGION V
//'
0
Y
1990 N. CALIFORNIA BOULEVARD
SulTE 202. WALNUT CREEK PLAZA
epge
WALNUT CR EEK, CALIFORNIA 94596
June 24, 1981
Docket No. 50-206
9
N
Southern California Edison Company
?.
I
P.O. Box 800
$
2244 Walnut Grove Avenue
M L 1 3JSB N
__
7
Rosemead, California 91770
8% Neue
Advanced Engineering
M
, hs)
Attention: Dr. L. T. Papay, Vice President
%A
Ji::p \\ %#
Gentlemen:
Subject: NRC Inspection - San Onofre Unit 1
This refers to the inspection conducted by Mssrs. L. Miller and H. Canter of this
office on May 4 - 29, 1981 of activities authorized by NRC license No. DPR-13, and
to the discussions of his findings held by Mr. Miller with Mr. Curran and other
representatives of the Southern California Edison Company at the conclusion of the
inspection.
Araas examined during this inspection are described in the enclosed inspection
report. Within these area.;, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and observations
by the inspector.
No items of noncompliance with NRC requirements were identified within the scope
of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe to be
exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)
notify this office by telephone within ten (10) days from the date of this letter
of your intention to file a request for withholding; and (b) submit within 25 days
from the date of this letter a written application to this office to withhold
such information.
If your receipt of this letter has been delayed such that less
than seven (7) days are available for your review, please notify this office
promptly so that a new due date may be established. Consistent with section
2.790(b)(1), any such application must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought to be
withheld, and which contains a full statement of the reasons on the basis which
it is claimed that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the considerations
0107140499 010624
/
PDR ADOCK 05000206
7l I
s
-
g
.
.
.
.
-
.
,
Southern California Edison Company
-2-
June 24, 1981
'
listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
. incorporated as far as possible into a separate part of the affidavit.
If we
do not hear from you in this regard within the specified per.iods noted above, the
report will be placed in the Public Document Room.
4
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
.
/ 7
p
J/ L.
eds, Chief
gbactorOperationsProjectsBranch
'
Enclosures:
l:
IE Inspection Report
No. 50-206/81-18
cc w/o enclosure 1:
Mr. R. Dietch, Vice President
Nuclear Engineering & Operations, SCE
Mr. J.-M. Curran, SCE