Text
FOR DCS PROCESSING ,
.
ducg
Original document not abailable
4
UNITED STATES
to NRC
(M[b ,
8
7
NUCLEAR REGULATORY COMMISSION Certified by.
'
$
e ,$
l
REGION V
1990 N. CALIFORNIA BOULEVARD
/
SUITE 202, WALNUT CREEK PLAZA
- m*
WALNUT CREEK, CALIFORNIA 94596
June 25, 1981
Docket No. 50-361
ed
& g'(
F
1
s
t
!.
.
,
1-
Southern California Edison Company
W
i-
6-i JUL 13198
,3
. 3 ,,,,, , ,,,,1 **
7
P. O. Box 800
2244 Walnut Grove Avenue
,, ?
Rosemead, California 91770
%
aw m
%.
[q
Attention:
Dr. L. T. Papay, Vice President
Advanced Engineering
p) *g h 4'
Gentlemen:
Subject: NRC Inspection of San Onofre Unit No. 2
This refers to the inspection conducted by Messrs. H. Canter and R. Pate of
this office on April 17 to May 15,1981, of activities authorized by NRC
Construction Permit No. CPPR-97, and to the discussion of our findings held
by Mr. Pate with Mr. Nunn and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspectors.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is
necessary that you (a) notify this office by telephone within ten (10) days
from the date of this letter of your intention to file a request for with-
holding; and (b) submit within 25 days from the date of this letter a
written application to this office to withhold such information.
If your
receipt of this letter has been delayed such that less than seven (7) days
are available for your review, please notify this office promptly so that
a new due date may be established. Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the
owner of the information which identifies the document or part sought to
(
s
8107140473 810625
PDR ADOCK 05000361
G-
$
_
.
.
.
..
,
,
Southern California Edison Company
-2-
June 25,-1981
be withheld, and which contains a full statement of the reasons on the
basis which it is claimed that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you
in this regard within the specified periods noted above, the report will
be place in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
)E
i
s; Chief
actor Operations Projects Branch
Enclosure:
1.
IE Inspection Report
No. 50-361/81-11
!
cc w/o enclosure:
Mr. R. Dietch, Vice President
Nuclear Engineering & Operations
l
l
r
!
l
l
'
l