ML20009A789
| ML20009A789 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 03/23/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20009A790 | List: |
| References | |
| NUDOCS 8107140211 | |
| Download: ML20009A789 (2) | |
See also: IR 05000213/1980026
Text
g-
y
--
NN
/
'
o
UNITED STATES
g
g
NUCLEAR RE.GULATORY COMMISSION
Bg
j
.
REGION 1
0,
c
631 PARK AVENUE
D
O
o
KING OF PRUSSIA, PENNSYLVANIA 19406
MA8
Docket No. 50-213
23 g
Connecticut Yankee Atomic Power Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-213/80-26
This refers to the routine safety inspection conducted by Mr. T. H. Smith of
this office on December 16, 1980 - January 18, 1981 at the Haddam Neck Plant,
Haddam, Connecticut, of activities authorized by NRC License No. OPR-61 and to
the discussions of our findings held by Mr. T. H. Smith with Mr. R. H. Graves of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
(45 FR 66754) dated October 7, 1980.
You are required to respond to this letter
and in preparing your response, you should follow the instructions in Appendix
A.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, documentation of findings of your control
and accounting procedures for safeguarding special nuclear materials and your
facility security measures for physical protection are deemed to be commercial
or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be
subject to disclosure only in accor ance with the provisions of 10 CFR 9.12;
therefore, the pertinent section of the enclosed inspection report and Appendix
A, will not be placed in the Public Document Room and will receive limited
distribution.
,
,
8107140211 810323
PDR ADOCK 05000213
G
r -i : .
1
.
Connecticut Yankee' Atomic. Power
M 2 3 Hgf
Company
2
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
n
\\wAw
'E d n J. Brunner, Chief, Projects
Brdnch #1, Division of Resident
and Project Inspection
,
Enclosures:
-1.
~ Appendix A, Notice of Violation *
~2.
Office of Inspection and Enforcement Inspection
Report Number 50-213/80-26*
cc:
R. Graves, Plant Superintendent (w/encis)
D. G. Diedrick,' Manager of Quality Assurance (w/o Appendix A & Page 7
of Report)*
J. R. Himmelwright, Licensing Safeguards Engineer (w/o Appendix A & Page 7
of Report)*
- Contains 2.790(d) Information