ML20009A597
| ML20009A597 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 06/02/1981 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Aswell D LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20009A598 | List: |
| References | |
| NUDOCS 8107130358 | |
| Download: ML20009A597 (2) | |
See also: IR 05000382/1981013
Text
-___ ______ _ __
_ _ _ _ .
_
e nem
UNITED STATES
g.
-
NUCLEAR REGULATORY COMMISSION
g jSq
g
r, ( (
.: j
REGION IV
611 RYAN PLAZA DRIVE, SUITE 1000
3 1__% _ @g
% . .V
ARLINGTON, TEXAS 76011
,
...
June 2, 1981
g so,
$g[ 4
In Reply Refer To:
y
"
i
Docket:
50-382/81-13
h%
p
b
_-
Jul j
Q "%o
h
Louisiana Power and Light Company
ATTN:
D. L. Aswell, Vice President
4 N
Power Production
.f
9
\\\\/
142 Delaronde Street
E,,M
New Orleans, Louisiana 70174
Gentlemen:
This refers to the inspection conducted under the Resident Inspection Program
by Mr. G. L. Constable of our staff during the period April 16, 1981 - May 15,
1981, of activities authorized by NRC Construction Pennit CPPR-103 for Waterford
Steam Electric Station, Unit 3, and to the discussions of the findings with
Mr. D. B. Lester at various times during the inspection.
Principal areas examined during the inspection and our findings are discussed
in the enclosed inspection report. Within these areas, the inspection consisted
of selective examination of representative records, interviews with personnel
and observations by the inspector.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Roo:n.
U this report contains any information that you
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify.this office by telephone within 10 days from the date of
this letter of your intention to file a request for withholding; and (b) sub-
mit within 25 days from the date of this letter a written application to this
office to withhold such information.
If your receipt of this letter has been
delayed such that less than seven days are available for your review, please
notify this office promptly so that a new dus date may be established.
Consistent with Section 2.790(b)(1), any sucn application must be accompanied
by an affidavit executed by the owner of the information which identifies the
document or part sought to be withheld, and which contains a full statement
of the reasons on the basis which it is claimed that the infonnation should be
withheld from public disclosure. This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
f we do not hear from you in this
regard within the specified periods noted above, the report will be placed in
the Public Document Room.
.
d
8107130358 810602
PDR ADOCK 05000382
G
g7
.
.
. .
- - _ _ _
_ _ - - _ _ _ _ _ _
. _ _ _ - _ _ _ _ _ _ _ _
_ __
_
_}
.
.
.
--
. _ . _ - -.
-
1
r
.
.
.
.
Louisiana Power and Light Company
2
June 2, 1981
i
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
77 Old- k
G. L. Madsen, Chief
Reactor Projects Branch
Enclosure:
IE Inspection Report 50-382/81-13
.
J