ML20008G191

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Deficient Coil Spools on GE-type Hfa Relays, Initially Reported 810513.Mfg Has Changed Spool Matl & Will Supply Replacements.Addl Info by 810916
ML20008G191
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 06/12/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-81-462-000 10CFR-050.55E, 10CFR-50.55E, 81-462, PT21-81-462, PT21-81-462-000, NUDOCS 8107020420
Download: ML20008G191 (2)


Text

'i

~a 400 Chestnut Street Tower II g[

. J _ (3 0 June 12, 1981 g

BLRD-50439/8140 m

d 9

j

~s Mr. James P. O'Reilly, Director rr.

Office of InspootiJn and Enforcement S-01,'

M1 d'b U.S. Nuclear Regulatory Commission

~

Region II - Suite 3100 up.

Y 101 Marietta Street 9

Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFCBITE NUCLEAR PLANT UNITS 1 AND 2 - GB RELAY DEFICIENCY -

BLED-50438/81-37, BLRD-50-439/81 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on May 13, 1981, in accordanoe with 10 CFR 50 55(e) as NCR BLN EEB 8101., Enclosed is our first interim report. We expect to submit our next nsport by September 16, 1981. We consider 10 CFR Part 21 applicable to this deficiency.

If you have any questions concerning this matter, please get in touch with D. L. Laanbert at FTS 857-2581.

Very truly yours, TENNESSEE YALLEY AUTHORITT L. M. Mills, Manager Nucles.r Regulation and Safety Enclosure Mr. Victor Stello, Jr., Directer (Encionare) /

oot Offion of Inspectios and Enforcement U.S. Nuclear Regulatory (M -4maion Waahington, DC 20555 81070 2 o y.20 s

1P1

<,/t, f g g.c,

, n r..o v.

.e.

u

~.-

f ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 GE RELAY DEFICIENCY BLRD-50-438/81-37, BLRD-50-439/81-40 10 CFR 50.55(e)

FIRST INTERIM REPORT Description of Deficiency By General Electric service advice letter, TVA tras notified of the potential for coil failure of GE type HFA relays manufactured between 1974 and 1979 The Lexan coil spools of these relays are susceptible to stress cracks and embrittlement caused by thermal aging and improper mixing of the Lexan. This nonconformance is significant in that a cracked coil spool could result in improper relay function upon energization or deenergization of the relay.

Interim Progress General Electric has changed the spool material to Tefzel on all HFA relays manufc.ctured since January 1979 to correct this deficiency.

Approximately 64 HFA relays manufactured between 1974 and 1979 were-supplied on Class IE 6.9 kV and 13.8 kV switchgear by Brown Boveri Electric, Incorporated, for Bellefonte Nuclear Plant. The vendor has been requested by TVA to furnish replacements for these relays to correct the problem. TVA will supply additional information on this nonconformance regarding't,he exact replLeement relay type in the final report.