Forwards IE Insp Repts 50-440/81-06 & 50-441/81-06 on 810301-31.No Noncompliance Noted
ML20008F844
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/14/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20008F845 List:
References
NUDOCS 8105120151
Download: ML20008F844 (2)


See also: IR 05000440/1981006

Text

%

p tsa

s%

UNITED STAT ES

/

[\\ 3 .,~, ( (' ,g

NUCLEAR REGULATORY COMMISSION

,

TIC

/

-* /

c

REGION lli

g h'we [o#

799 noostvtLT noAo

cLEN ELLYN,lLLINOIS 60137

g*...*,

April 14,1981

.?/

/

8

D

db?'id

e

s

a

z'

.

'

Docket No. 50-440

A1AY 0 $ 19815 r

Docket No. 50-441

o

p.s. muasaa samaJessa

1

The Cleveland Electric Illuminating

  • y

Company

g

p

ATTN: Dalwyn R. Davidson

.

  1. I

Vice President - System

Engineering and Construction

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by Mr. J. Hughes cf this office

on March 1-31, 1981, of activities at the Perry Nuclear Plant Project,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148 and

No. CPPR-149 and to tha discussion of our findings with Messrs.

M. R. Edelman and G. W. Groscup and others of your staff at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within tnese areas, the intpection consisted of

a selectiv. examination of procedures and representative records, obser-

vations, and in' erviews with personnel.

No items of noncompliance with NRC requirementa were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of !.his letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains infomation that you

or your contractors believe to be proprietary, yru must apply in writing

to this office, within twenty-five days of the dace of this letter, to

withhold such information from public disclosure.

The application must

include a full stacement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

inf ormation identified in the application is contained in an enclosure

to the application.

810s n o /S( .

9

-

-- -

- -

.

-

- -

s

The Cleveland Electric

-2-

April 14, 1981

a

Illuminating Company

We will gladly discuss any questions you have concerning this

inspection.

,

Gi.:t eerely ,

Y'

f

.w

R. F. Heishman, Act ng Director

Division of Resid'ent and Project

Inspection

Enclosures:

1.

IE Insp(rtion Reports

No. 50-440/81-06

No. 50-441/81-06

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Mr. Daniel D. Wilt, Attorney

Helen W.

Ev ans, State of Ohio