VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH January YEAR A (Revised)

APPROVED:

b STATION MANAGER t/

s10M10

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 04-06-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS

. Notes '

1. Unit Name: North Anna 1
2. Reporting Period: January 1981 (Revised)
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 898
7. Maximum Dependable Capacity (Net MWe): 850
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

Change is due to data review of past operating record.

9. Power Level To Which Restricted, If Any (Net NWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744 7 s '. 23,305
12. Number of Hours Reactor Was Critical 0 0 17,973.1
13. Reactor Reserve Shutdown Hours 0 0 213.1
14. Hours Generator On-Line 0 0 17,648.1
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) ..

0 0 __

44,832,142

17. Gross Electrical Energy Generated (MWH)" 0 0 14,316,912
18. Net Electrical Energy Generated (MWH) 0 0 13,485,003
19. Unit Service Factor 0 0 75.7
20. Unit Availability Factor 0 0 75.7
21. Unit Capacity Factor (Using MDC Net) 0 0 68.1
22. Unit Capacity Factor (Using DER Net) 0 0 63.8
23. Unit Forced Outage Rate 0 0 5.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: March 5, 1981
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

. _ _ _ . _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ ._ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _