VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH January YEAR A (Revised)

APPROVED:

b STATION MANAGER t/

s10M10

OPERATING DATA REPORT DOCKET NO.

50-338 DATE 04-06-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes 1.

Unit Name:

North Anna 1 2.

Reporting Period:

January 1981 (Revised) 3.

Licensed Thermal Power (MWt):

2775 4.

Nameplate Rating (Gross MWe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe):

898 7.

Maximum Dependable Capacity (Net MWe):

850 8.

If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

Change is due to data review of past operating record.

9.

Power Level To Which Restricted, If Any (Net NWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 7 s '.

23,305 12.

Number of Hours Reactor Was Critical 0

0 17,973.1

13. Reactor Reserve Shutdown Hours 0

0 213.1

14. Hours Generator On-Line 0

0 17,648.1

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 0

44,832,142

17. Gross Electrical Energy Generated (MWH)"

0 0

14,316,912

18. Net Electrical Energy Generated (MWH) 0 0

13,485,003

19. Unit Service Factor 0

0 75.7 20.

Unit Availability Factor 0

0 75.7

21. Unit Capacity Factor (Using MDC Net) 0 0

68.1 22.

Unit Capacity Factor (Using DER Net) 0 0

63.8

23. Unit Forced Outage Rate 0

0 5.9

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

March 5, 1981

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

-