VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH January YEAR A (Revised)
APPROVED:
b STATION MANAGER t/
s10M10
OPERATING DATA REPORT DOCKET NO.
50-338 DATE 04-06-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes 1.
Unit Name:
North Anna 1 2.
Reporting Period:
January 1981 (Revised) 3.
Licensed Thermal Power (MWt):
2775 4.
Nameplate Rating (Gross MWe):
947 5.
Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable Capacity (Gross MWe):
898 7.
Maximum Dependable Capacity (Net MWe):
850 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
Change is due to data review of past operating record.
9.
Power Level To Which Restricted, If Any (Net NWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 7 s '.
23,305 12.
Number of Hours Reactor Was Critical 0
0 17,973.1
- 13. Reactor Reserve Shutdown Hours 0
0 213.1
- 14. Hours Generator On-Line 0
0 17,648.1
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
44,832,142
- 17. Gross Electrical Energy Generated (MWH)"
0 0
14,316,912
- 18. Net Electrical Energy Generated (MWH) 0 0
13,485,003
- 19. Unit Service Factor 0
0 75.7 20.
Unit Availability Factor 0
0 75.7
- 21. Unit Capacity Factor (Using MDC Net) 0 0
68.1 22.
Unit Capacity Factor (Using DER Net) 0 0
63.8
- 23. Unit Forced Outage Rate 0
0 5.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
March 5, 1981
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
-