Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
{{#Wiki_filter:-
O l
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION
, MONTHLY OPERATING REPORT MONTH March YEAR _g]_
APPROVED:
/
Mdi<L STATION MANAGER /
gacA2" N
--wsy yw-. .---w.- -,->. ww.- - ,----%.y-,,.--.y,- y ----%;_.--g--, g..,.m- . _ ,_----,w.,- mm -w.- --- m -__.y-., --. y- -
.----- - --9 6 7 ---- ----,--- v
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 04-06-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes
- 1. Unit Name: North Anna 1
- 2. Reporting Period: March 1981
- 3. Licensed Thermal Power (MWt): 2775
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net HWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 898
- 7. Maximum Dependable Capacity (Net MWe): 850
- 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 2,160 24,721
- 12. Number of Hours Reactor Was Critical 0 0 17,973.1
- 13. Reactor Reserve Shutdown Hours 0 0 213.1
- 14. Hours Generator On-Line 0 0 17,648.1
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0 44,832,142
- 17. Gross Electrical Ener3y Generated (MWH) 0 0 14,316,912
- 18. Net Electrical Energy Generated (MWH) 0 0 13,485,003
- 19. Unit Service Factor 0 0 71.4
- 20. Unit Availability Factor 0 0 71.4
- 21. Unit Capacity Factor (Using MDC Net) 0 0 64.2
- 22. Unit Capacity Factor (Using DER Net) 0 0 60.1
- 23. Unit Forced Outage Rate 0 0 5.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: April 7, 1981
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338-UNIT NA-1 DATE 04-06-81 COMPLETED BY L.L. Rogers TELEPHONE 703-894-5151X2510 MONTH March 4
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY- P0hTR LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 4 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-338 UNIT NAME North Anna.1 DATE 04-06-81 REPORT MONTH HARCH COMPLETED BY L. L. RODGERS TELEPHONE (703) 894-5151 X2510 l 2 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting 3 Event Code 4
Code 5
ACli " '
Down Reactor Report # Prevent Recurrence Shutdown 80-28 Continues through March. Duration 744 hours.
i J
i 1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain) (NUREG-0161)
E-Operator Training & License Examination F-Administrative _
5 G-Operational Error (Explain)
H-Other (Explain) Exhibit 1 - Same Source
OPERATING DATA REPORT DOCKET NO. 50-339 DATE 04-06-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes
- 1. Unit Name: North Anna 2
- 2. Reporting Period: March 1981
- 3. Licensed Thermal Power (MWt): 2775
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity-(Gross M7e): 917
- 7. Maximum Dependable Capacity (Net MWe): 870
- 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 2,160 2,592
- 12. Number of Hours Reactor Was. Critical 732.4 2,136 2,564.9
- 13. Reactor Reserve Shutdown Hours 11.6 34 314
- 14. Hours Generator On-Line 729.7 2,088.4 2,501.1
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1,938,261 5,520,448 6,642,961
- 17. Gross Electrical Energy Generated (MWH) 628,350 1,801,901 2,170,332
- 18. Net Electrical Energy Generated (MWH) 593,299 1,701,900 2,051,544
- 19. Unit Service Factor 98.1 96.7 96.5
- 20. Unit Availability Factor 98.1 96.7 96.5
- 21. Unit Capacity Factor (Using MDC Net) 91.7 90.6 91.
- 22. Unit Capacity Factor (Using DER Net) 87.9 86.9 87.3
- 23. Unit Forced Outage Rate 1.9 3.3 3.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Maintenance Outage May 1, through May 11, 1981
- 25. If Shut Down At End Of Report Period Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA-2 DATE 04-06-81 COMPLETED BY L.L. Rogers TELEPHONE 703-894-5151X2510 MONTH March DAY AVERAGE DAILY POWER LEVEL DAi AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 859 17 857 2 805 18 860 3 852 19 854 4 851 20 855 5 853 21 849 6 95 22 852 7 509 23 852 8 848 24 856 9 851 25 852 10 847 26 853 11 846 27 852 I
12 854 28 395 13 862 29 788 14 855 30 795 15 853 31 __
847 16 862 INSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-339 UNIT NAME North Anna 2 DATE 04-06-81 REPORT MONTH MARCH COMPLETED BY L. L. RODGERS TELEPHONE (703) 894-5151 X2510 No. Date l Type Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting vent Code Code Action to 3 4 5
- l. Down Reactor Report # Prevent Recurrence i
81-07 810306 F 11.3 A 3 N/A N/A N/A Turbine Trip / Reactor Trip caused by voltage regulator malfunction.
81-08 810328 F 3 A 3 N/A N/A N/A Turbine Trip / Reactor Trip caused by voltage regulator malfunction.
81-09 810329 F 7.1 B 1 N/A N/A N/A Reduced load to 30% to backseat 2-RC-69.
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain) (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 H-Other (Explain) Exhibit 1 - Same Source
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-339 REPORT MONTH MARCH UNIT NAME NA-2 YEAR 1981 DATE 04-06-81 COMPLETED BY L. L. ROGERS 81-07 (A) Turbine trip / reactor trip due to generator lock out relay trip while adjusting the voltage regulator base adjuster manually.
81-08 (A) Turbine trip / reactor trip due to generator loss of field while adjusting the voltage regulator base adjuster manually.
81-09 (B) Reduced load to 30% power to enter loop room to backseat 2-RC-69. Repairs were made and power increased to 100%.
i L
Page 1 of 3 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO. 2 MONTH March INPUT DATA " BASE LOAD PLANT PERFORMANCE REPORT" FOR NORTH CAROLINA UTILITIES COMMISSION March 1, 1981 This report began with the unit at 100%.
March 2, 1981 0900 Reduced power to 850 Mw. Attempting to restore condenser vacuum. Loss of vacv.tm due to leak in "A" waterbox.
1030 Condenser vacuum restored, increased power to 100%.
1320 Placed "A" Waterbox in service, losing vacuum, reducing load.
1440 Unit stable at 88% power.
2243 Increasing power to 100%.
2350 Unit at 100% power.
March 6 0003 Turbine trip, reactor trip. Loss of field trip partially unexplained. Operator adjusted regulator with base adjust by mistake. Investigation continuing.
1010 Reactor critical.
1122 Generator on the line.
1200 Holding 30% power for Chemistry.
March 7 1115 S/G Cation Conductivity in spec. Commence increasing power.
- wu w ,- ,--w . - - - , -
Page 2 of 3 1900 Unit at 100% power.
March 14 0040 Commenced reducing load for 2-PT-34.3 0130 Completed PT and returned to 100% power.
March 21 0100 Reduced power to 880 Mw to run 2-PT-34.3.
0130 Completed test, increasing power to 100%.
0140 Unit at 100% power.
March 28 0135 Commenced ramp down for 2-PT-34.3.
3 0300 Completed 2-PT-34.3 and Unit at 100%
power.
0400 Reactor trip from turbine trip (Gen loss of field trip). Appears minimum excitation trip may be set incorrectly or instrumentation is incorrect. New Admin. limit set until outage allows for investigation.
0420 Commenced reactor startup.
0454 Reactor critical.
0700 Generator on the line.
0808 30% Chemistry hold.
p 1753 Increasing power.
( 2112 Unit at 100 % power.
i March 29 2100 Start load reduction to 30% to enter loop room to backseat 2-RC-69.
2112 Stop load reduction; backseat 2-RC-69 and tignten packing on spray valve at this power level ~ 88%.
I i
i l
i l
._ _ _ . _ . . .._.. - --. . .- _ .. _ _ _ _ . _. _.m.- , _ _ _ _ .
4 Page 3 of 3 March 29 (cont.) -2124 Commence lead reduction to 30% for loop room entry.
, 2240 Reactor power at 30%.
4 March 30 0050 Commensed power increase after backseating valve.
1 0405 Unit at 100% power. "
i i
t d
4 I
i
-{
J i
f i
I.
e t-i t
t l.
h I
l a
i i
i e
8 I
i .
I
-n, ,..nn,,w,------e. ,,,-.a-.,m,-,an,,,, ,,,-,,,n,,-wre,r-,,,,,,,m-w--wee,*'*er-',-wwwwe-*-~~~rv~~ww- ~ tv ~ w -~ ~ w n e e -, -v '" wen- , w v v-' '** ' w w ~ 'v 4 - v ' -}}