f **%r
& WR f7AD t
e
[f 4'o, UNITED STATES o
NUCLEAR REGULATORY COMMISSION 2'
l REGION I 2,, V j
631 PARK AVENUE g
KINO oF PRUSSIA, PENNSYLVANIA 19406 Docket No. 50-320 Metropolitan Edison Company ATTN:
Mr. G. K. Hovey CEC 10 IN Vice President and Director of TMI-2 P. O. Box 480 Middletown, Pennsylvania 17057 Gentlemen:
The enclosed IE Information Notice No. 30-44, " Actuation of ECCS in the Recircu-1ation Mode While in Hot Shutdown," is forwarded to you for information.
No written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, G'??W6 Y lG.m yce H. Grier
~
fwoirector
Enclosures:
1.
IE Information Notice No. 80-44 2.
List of Recently Issued IE Information Notices CONTACT:
F. G. Greenman 4
(215-337-5267) l u
?
cc w/encis:
J. J. Barton, Manager Site Operations,_TMI-2 E. D. Fuller, TMI-2 Licensing Supervisor E. G. Wallace, PWR Licensing Manager J. S. Liberman, Esquire G. F. Trowbridge, Esquire Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment 81031203 z
SS8NS No.:
6835 Accession No.:
8012160001 IN 80-44 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 December 15, 1980 IE INFORMATION NOTICE NO. 80-44; ACTUATION OF ECCS IN THE RECIRCULATION MODE WHILE IN HOT SHUTDOWN PURPOSE:
The intent of this Infonrasion Notice is to alert PWR licensees and holders of construction permits of a potentially generic problem involving inadvertent actuation of the emergency core cooling systen (ECCS) in the " Recirculation Mode".
Such an event occurred at the Davis-Besse Nuclear Power Station (Docket No. 50-346) on December 5, 1980.
The plant was in a hot shutdown mode of opera-tion at the time of the event and was undergoing certain maintenance activities as described below.
DISCUSSION:
Just prior to the inadvertent actuation of the ECCS, the licensee was attempt-ing to isolate electrical shorts and/or grounds in the Safety Features Actua-tion System (SFAS)..Tovards this end, A-C power had been removed from Channel 3 of the SFAS.
Upon reenergizing Channel 3 it was noted that an indicating lamp was out; therefore, an attempt was made to replace the failed lamp with a spare unit. While removing a lamp from a spare output slot in a Channel 3 chassis, an arc was drawn between the lamp and the module chassis.
This arcing was apparent-ly due to a combination of shorts or grounds in the SFAS, which coupled with the " common" connection between Channel 1 and 3 resulted in the loss of a power supply in Channel 1.
Since all the bistable trips in Channel 3 had not been 4
completely reset, and since a power supply to Channel 1 was lost, SFAS Levels 1, 2, 3 and 5 were actuated by the two-out-of four actuation logic.
Since SFAS l
Level 5 indicates that the Borated Water Storage Tank (BWST) is at a low level, the ECCS was placed in a recirculation mode.(i.e., the ECCS suctien was aligned to the emergency containment sump.)
l In order to place the ECCS system in the recirculation mode, the supply valves leading to the Decay Heat Removal (OHR) pumps from the BWST start closing l
after those in the ECCS line and from the containment emergency sump fully open.
l Thus, during this valve transition period, a flow path existed to the reactor l
coolant system (RCS) via the BWST and the ECCS pumping system (i.e., the DHR l
pumps); however, since the RCS pressure was higher than that of the pumping system (2100 vs. 1600 psig) no BWST watg* was pumped into the RCS.
- Rather, during the valve transition time of about 1-1/2 minutes, approximately 15,000 gallons of borated water was drained from the BWST to the containment emergency sump.
m
IN 80-44 Osccmbar 16, 1980 Page 2 of 2 The Davis-Besse Nuclear Power Station has experienced several events during the
. past three and one-half years which have either degraded the OHR system or caused a temporary interruption of DHR operation.
Of these, the one most closely paralleling the event described above occurred on April 19, 1980.
(See IE Infor-mation Notice 80-20, " Loss of Decay Heat Removal Operability at Davis Besse Unit 1 While in A Refueling Mode" dated May 8, 1980 and IE Bulletin No. 80-12,
" Decay Heat Removal System Operability" dated May 9, 1980.) During the Decem-ber 5, 1980 event, the plant was in a hot shutdown mode with RCS pressure at approximately 2100 psig; therefore, the operator was able to promptly trip the DHR pumps, thereby precluding air entrapment in the system or pump damage.
In contrast, the April 19, 1980 event occurred while the plant was in a quasi refueling mode (i.e., the reactor head was in place but detensioned, RCS water level was below the steam generator's bottom plate, the RCS was vented to the atmosobere by an open manhole at the top of the steam generator, and decay heat was being removed by one OHR system).
Since the DHR pump was being used to remove decay heat during the April 19 event, it was left running for approxi-mately two minutes after the pump had been aligned to the recirculation mode of operation, and tripped when water was discharged from a temporary tygon line.
Since the DHR system was the only system available for decay heat removal, the OHR pump was restarted approximately forty minutes later; however, it was tripped shortly thereafter when it was. determined that there was air in the suction line of the system.
In all, the April 19, 1980 event required approx-imately two and one-half hours to vent the DHR system and reestablish DHR flow. As a consequence of the relatively long recovery time, the temperature limit specified in the Technical Specification for the refueling mode of opera-tion was exceeded during the April 19, 1980 event.
The above events illustrate means whereby the integrity of a major ECCS system can be jeopardized by inadvertently or prematurely aligning the ECCS to the I
recirculation mode of operation.
The major concern in such cases is that the OHR pumps could become air bound if their suction lines are aligned to a dry 4
sump. At best, with the pumps air bound, the pump motor would trip automatically or could be tripped manually before any damage occurred, in which case flow could l
be established after the system is vented; at worst, the pumps could be damaged and become inoperable, in which case the active portion of the ECCS would not be avail.able, if needed at that time.
This Information Notice is provided as an early notification of a possibly signi-ficant matter that is still under review by the NRC staff.
Recipients shculd re-view the information for possible applicability to their facilities.
No specific action or response is requested at this time; however, if NRC evaluations so indicate, further licensee actions may be requested or required.
If you have any question regarding this matter, pleare contact the director of the appropriate NRC Regional Office.
l l
l
e IE Information Notice No. 80-44 December 16, 1980 RECENTLY ISSUED IE INFORMATICN NOTICES Information Subject Date Issued to Notice No.
Issued 80-43 Failures of the 12/5/80 All holders of a Continuous Water Level BWR power reactor Monitor for the Scram OL or CP Discharge Volume at Dresden Unit No. 2 80-29 Broken Studs on ferry 11/26/80 All holders of a Supplement Turbine Steam Inlet power reactor No. 1
- fange OL or CP 80-42 Effects of Radiation on 11/24/80 All holders of a Hydraulic Snubber Fluid power reactor OL ar CP 80-41 Failure of Swing Check 11/10/80 All holders of Valve in the Decay Heat a power reactor Removal System at OL or CP Davis-Besse Unit No. 1 80-40 Excessive Nitrogen 11/6/80 All holders of Supply Pressure a power reactor OL Activates Safety-Relief or CP Valve Operation to Cause Reactor Depressurization 4
80-39 Malfunctions of 10/31/80 All holders of a Solenoid Valves power reactor OL or CP Manufactured by Valcor Engineering Corporation 80-38 Cracking in Charging 10/30/80 All holders of l
Pump Casing Cladding a PWR power reactor OL or CP 80-37 Containment Cooler 10/24/80 All holders of a Leaks and Reactor power reactor OL Cavity Flooding at or CP Indian Point Unit 2 80-36 Failure of Steam 10/10/80 All holders of a Generator Support power reactor l
.