ML20008F222
| ML20008F222 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 01/08/1981 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20008F219 | List: |
| References | |
| 50-338-80-35, 50-339-80-33, NUDOCS 8103120565 | |
| Download: ML20008F222 (1) | |
Text
.
O APPENDIX A NOTICE OF VIOLATION Virginia Electric and Power Company Docket No. 50-339 North Anna 2 License No. NPF-7 As a result of the inspection conducted on October 1-31, 1980, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following siolation was identified.
10 CFR 50 Appendix B Criterion V as implemented by VEPCO's Nuclear Power Station Quality Assurance Manual Section.5 requires that activities affecting quality shall be prescribed by documented instructions or procedures. These instructions and procedures shall include appropriate quantitative or quali-tative acceptance criteria for determining that important activities have been satisfactorily accomplished.
Contrary to the above, procedures had not been developed on October 24, 1980, which contained adequate acceptance criteria to enable a determination be made that the fire doors were functional as required by Technical Specifi-cation 3.7.15.
This is a Severity Level V Violation (Supplement I.E.).
Pursuant to the provisions of 10 CFR 2.201, Virginia Electric and Powcr Company is hereby required to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the data when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
JAN 0 81981 Date:
l l
l l
210s12 o %5 l