Forwards IE Insp Repts 50-266/80-22 & 50-301/80-22 on 801201-31 & Notice of Violation
ML20008E978
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/22/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20008E979 List:
References
NUDOCS 8103100685
Download: ML20008E978 (2)


See also: IR 05000266/1980022

Text

p errg(

,*

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

r

o

$

a ,E

REGION lli

j

799 ROOSEVELT ROAD

g

g[

GLEN ELLYN, ILLIPeolS 60137

January 22, 1981

Docket No. 50-266

Docket No. 50-101

Wisconsin Electric Power Company

ATTN:

Mr. Sol Burstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI 5320.1

Gentlemen:

This refers to the routine inspection conducted by Messrs. W. G. Guldemond and

R. L. Hague of this office on December 1-31, 1980, of activities at Point Beach

Nuclear Plant, Units 1 and 2 authorized by NRC Operating Licenses No. DPR-24

and No. DPR-27 and to the discussion of our findings with Mr. G. A. Reed at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

The inspection showed that action had been taken to correct the identified

noncompliance and to prevent recurrence. Consequently, no reply to this

noncompliance is required and we have no further-questions regarding this

matter at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room, except

as follows. If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this office, within

twenty-five days of the date of this letter, to withhold such information

from public disclosure. The application must include a full statement of

the reasons for which the information is. considered proprietary, and should

be prepared so that proprietary information identified in the application is

- contained in an enclosure to the application.

c

%3'

'

m

4

e

d

..

,-

-

b

8103100695

.

.

.

_

.

__ _

- _

_

. ___ __

-

__

_

.

Wisconsin Electric Power

-2-

January 22, 1981

Company

i

We will gladly ~ discuss any questions you have concerning this

,

inspection.

Sincerely,

!

O

1

. F. Ileishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

i

No. 50-266/80-22

and No. 50-301/80-22

cc'w/encls:

G. A. Reed, Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

f

PDR

Local PDR.

NSIC

TIC

John J. Duffy, Chief'

Boiler Inspector

' Peter Anderson, Wisconsin's

!

Environmental-Decade

l

(-

i

!

,

!

J

>

.

i

s

(

, . . .-