ML20008E978
| ML20008E978 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/22/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20008E979 | List: |
| References | |
| NUDOCS 8103100685 | |
| Download: ML20008E978 (2) | |
See also: IR 05000266/1980022
Text
p errg(
,*
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
r
o
$
a ,E
REGION lli
j
799 ROOSEVELT ROAD
g
g[
GLEN ELLYN, ILLIPeolS 60137
January 22, 1981
Docket No. 50-266
Docket No. 50-101
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 5320.1
Gentlemen:
This refers to the routine inspection conducted by Messrs. W. G. Guldemond and
R. L. Hague of this office on December 1-31, 1980, of activities at Point Beach
Nuclear Plant, Units 1 and 2 authorized by NRC Operating Licenses No. DPR-24
and No. DPR-27 and to the discussion of our findings with Mr. G. A. Reed at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
The inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence. Consequently, no reply to this
noncompliance is required and we have no further-questions regarding this
matter at this time.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room, except
as follows. If this report contains information that you or your contractors
believe to be proprietary, you must apply in writing to this office, within
twenty-five days of the date of this letter, to withhold such information
from public disclosure. The application must include a full statement of
the reasons for which the information is. considered proprietary, and should
be prepared so that proprietary information identified in the application is
- contained in an enclosure to the application.
c
%3'
'
m
4
e
d
..
,-
-
b
8103100695
.
.
.
_
.
__ _
- _
_
. ___ __
-
__
_
.
Wisconsin Electric Power
-2-
January 22, 1981
Company
i
We will gladly ~ discuss any questions you have concerning this
,
inspection.
Sincerely,
!
O
1
. F. Ileishman, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
i
No. 50-266/80-22
and No. 50-301/80-22
cc'w/encls:
G. A. Reed, Manager
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
f
Local PDR.
John J. Duffy, Chief'
Boiler Inspector
' Peter Anderson, Wisconsin's
!
Environmental-Decade
l
(-
i
!
,
!
J
>
.
i
s
(
, . . .-