ML20008E890

From kanterella
Jump to navigation Jump to search
Forwards LER 81-005/03L-0
Date released: 01/22/2020 Download: ML20008E890


LER 81-005/03L-0:on 810202,power Supply to Both Excore Range Monitors Was Interrupted.Caused by Maint Personnel Cutting Off Power to Investigate Steam Generator Status Lights & lo-lo Level Alarms.Personnel Instructed
ML20008E907
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 03/04/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20008E907 (2)
Forwards LER 81-005/03L-0
ML20008E889
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 03/02/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20008E889 (1)