ML20008E802

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-348/80-36 & 50-364/80-48 on 801117-21.No Noncompliance Noted
ML20008E802
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/03/1981
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20008E803 List:
References
NUDOCS 8103090747
Download: ML20008E802 (2)


See also: IR 05000348/1980036

Text

--

,

f

cfe ver*%o

STED STATES

8

g

8'

NUCLEAR REGULATORY COMMISSION

,

g

-

r

REGION 11

"

k

101 MARIETTA sT., N.W.. SUITE 3100

g

o[

ATLANTA, GEORGIA 30303

.....

FEB - 31981

m

og!

In Reply Refer To:

g

"

RII:

4

s

N

y

,g

-348/80

0-364/80-4

Alabama Power Company

{%

0/Sg7A '

-

ATTN:

R. P. Mcdonald

%8

Vice President-Nuclear Generation

P. O. Box 2641

9

Birmingham, AL 35291

\\'

g

Gentlemen:

This refers to the inspection conducted by D. L. Andrews of this office on

November 17-21, 1980, of arctvities authorized by NRC License Nos. NPF-2 and

NPF-8 for the Farley facility, and to the discussion of our findings held with

you and members of your staff at the conclusion of the inspection.

Areas examined during the inspection

nd our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2,

Title 10, Code of Federal Regulations, a copy of this let.:er

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information

from public disclosure.

Any such application must

-

include a full statement of the reasons on the basis of which in is

claimed that the information is proprietary,

and should be prepared

so

that

proprietary

information

identified

in the

application is

contained in a separate part of the document.

If we do not hear

from you in

this

regard within the specified period,

the report

l

will be placed in the Public Document Room.

l

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

l </].

,

..

.

. Philip

ohr, Chief

Fuel Facility and Materials

S.103090 y7

Q

Safety Branch

<

'

Enclosure: Inspection Report

Nos. 50-348/80-36 and 50-364/80-48

L _

..

_

--.

- - . _ -.

t

.

.4

.

Alabama Power Company

-2-

pgg .3 1981

.

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

,

H. O. Thrash, Manager-Nuclear Generation

l

0. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

,

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

R. E. Hollands, Jr., QA Supervisor

l

.

J

f

I

!~

?

.

{

r

.

i

1:

t

l

l

t

L'