ML20008E802
| ML20008E802 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/03/1981 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20008E803 | List: |
| References | |
| NUDOCS 8103090747 | |
| Download: ML20008E802 (2) | |
See also: IR 05000348/1980036
Text
--
,
f
cfe ver*%o
STED STATES
8
g
8'
NUCLEAR REGULATORY COMMISSION
,
g
-
r
REGION 11
"
k
101 MARIETTA sT., N.W.. SUITE 3100
g
o[
ATLANTA, GEORGIA 30303
.....
FEB - 31981
m
og!
In Reply Refer To:
g
"
RII:
4
s
N
y
,g
-348/80
0-364/80-4
Alabama Power Company
{%
0/Sg7A '
-
ATTN:
R. P. Mcdonald
%8
Vice President-Nuclear Generation
P. O. Box 2641
9
Birmingham, AL 35291
\\'
g
Gentlemen:
This refers to the inspection conducted by D. L. Andrews of this office on
November 17-21, 1980, of arctvities authorized by NRC License Nos. NPF-2 and
NPF-8 for the Farley facility, and to the discussion of our findings held with
you and members of your staff at the conclusion of the inspection.
Areas examined during the inspection
nd our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2,
Title 10, Code of Federal Regulations, a copy of this let.:er
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information
from public disclosure.
Any such application must
-
include a full statement of the reasons on the basis of which in is
claimed that the information is proprietary,
and should be prepared
so
that
proprietary
information
identified
in the
application is
contained in a separate part of the document.
If we do not hear
from you in
this
regard within the specified period,
the report
l
will be placed in the Public Document Room.
l
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
l </].
,
..
.
. Philip
ohr, Chief
Fuel Facility and Materials
S.103090 y7
Q
Safety Branch
<
'
Enclosure: Inspection Report
Nos. 50-348/80-36 and 50-364/80-48
L _
..
_
--.
- - . _ -.
t
.
.4
.
Alabama Power Company
-2-
pgg .3 1981
.
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr., Senior Vice President
,
H. O. Thrash, Manager-Nuclear Generation
l
0. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Operations
Quality Assurance
,
W. G. Hairston, III, Plant Manager
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
R. E. Hollands, Jr., QA Supervisor
l
.
J
f
I
!~
?
.
{
r
.
i
1:
t
l
l
t
L'