ML20008E708
| ML20008E708 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 02/06/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20008E707 | List: |
| References | |
| NUDOCS 8103090498 | |
| Download: ML20008E708 (2) | |
See also: IR 05000413/1981001
Text
'
i
3
.
.
- ' pa asegt
UNITED STATES
'
f
o
3
NUCLEAR REGULATORY COMMISSION
,
o
i
REGION 11
2'f
101 MARIETTA sT.. N.W.. SUITE 3100
D,
ATLANTA, G EORGIA 3o303
.....
FEB 0 61981
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
-Subject: Report Nos. 50-413/81-01 and 50-414/81-01
This refers to the routine safety inspection conducted by P. K. VanDoorn of this
office on January 12-16, 1981, of activities authorized by NRC Construction
Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion
of our findings held with D. G. Beam at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
Three new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
.*
,
Sincerely,
,
t
1
,
C. E. Murphy, Chief
Reactor Construction and Engineering
[
Support Branch
Enclosure:
(See Page 2)
!
I
,
l
8103090498
-
.-
-
r
~
.
.
.
Duke Power Company
-2-
ggj
Enclosure:
Inspection Report Nos. 50-413/81-01
and 50-414/81-01
cc w/ encl:
J. W. IIampton, Station Manager
D. G. Beam, Project Manager
.
&. '
l
t