Forwards IE Insp Repts 50-413/81-01 & 50-414/81-01 on 810112-16.No Noncompliance Noted
ML20008E708
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/06/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20008E707 List:
References
NUDOCS 8103090498
Download: ML20008E708 (2)


See also: IR 05000413/1981001

Text

'

i

3

.

.

  • ' pa asegt

UNITED STATES

'

f

o

3

NUCLEAR REGULATORY COMMISSION

,

o

i

REGION 11

2'f

101 MARIETTA sT.. N.W.. SUITE 3100

D,

ATLANTA, G EORGIA 3o303

.....

FEB 0 61981

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

-Subject: Report Nos. 50-413/81-01 and 50-414/81-01

This refers to the routine safety inspection conducted by P. K. VanDoorn of this

office on January 12-16, 1981, of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion

of our findings held with D. G. Beam at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

Three new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.*

,

Sincerely,

,

t

1

,

C. E. Murphy, Chief

Reactor Construction and Engineering

[

Support Branch

Enclosure:

(See Page 2)

!

I

,

l

8103090498

-

.-

-

r

~

.

.

.

Duke Power Company

-2-

ggj

Enclosure:

Inspection Report Nos. 50-413/81-01

and 50-414/81-01

cc w/ encl:

J. W. IIampton, Station Manager

D. G. Beam, Project Manager

.

&. '

l