Forwards IE Insp Repts 50-348/80-23 & 50-364/80-30 on 800814-15.No Noncompliance Noted
ML20008E356
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/11/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20008E357 List:
References
NUDOCS 8010240661
Download: ML20008E356 (2)


See also: IR 05000348/1980023

Text

..

_

.

..

___

_ _ _ . _ _ _ _ _ _ _ _ _ _

__

_ -- _

,

?

@

8

'\\ '-

NUCLEAR REGULATORY COMMISSION

. UNITED STATES

'

'

.

-

r

- REGION 11

i.

101 MARIETTA ST

N.W.. SUITE 3100

%-

./

ATta=T4.oEoncia soaos

SEP t i 1980

In Reply Refer To:

.RI -

"

0-348/80-23

50-364L80-

Alabama Power Company

-ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641 -

Birmingham,'AL 35291

~

Gentlemen:

This refers to the inspection conducted by V. L. Brownlee of this office on

August 14-15, 1980, of activit'es authorized by NRC License No. NPF-2 and

Construction Permit No. CPPR-36 for the Farley facility, and to the discussion

of our findings held with J. D. Woodard at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

- selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application withia 20 days

to this office to withhold such information from public-disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and_ should be prepared so

that proprietary information identified in the application- is contained in a

1

separate part of the document. If we do not hear from you in this regard within

'

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

C. E. Murphy, Chief

Reactor Construction and Engineering

,~

~

Support Branch

Enclosure:' (See Page 2)

802on.m 4 6 I

,

-

. . .

-

-

.-

_

_

__ _

.

.

%

SEP 111.30

Alabama-Power Company

-2-

.

Enclosure:

Inspection Report Nos. 50-348/80-23

and 50-364/80-30

cc w/ enc 1:

A. R. Barton, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

O. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

-(Design and Construction)

4

)

,

j

l

l

l

,

.-