Text
( )
-
o
UNITED STATES
~
!
NUCLEAR REGULATORY COMMISSION
n
N
9E
REGION 11
e
'
e
101 MARIETTA ST,, N.W.. *UIT E 3100
- * " * p
ATLANTA, GEoRG4A %203
SEP 101980
In Reply Refer To:
RII:CRM
50-413/80-22
50-414/80-22
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by C. R. McFarland of this office on
August 19-22, 1980, of activities authorized by NRC Construction Permit Nos.
CPPR-116 and CPPR-ll7 for the Catawba facility, and to the discussion of our
findings held with D. G. Peam at the conclusion of the inspection.
Areas examined during trie inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include e full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so ,
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, tne report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
/
=
C. E. Murphy, Chiet
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
80102Ae 3 y
-
.
.
._ _.
__ ._
_ _ _ __ .
_ _ . . __ _ .._.
.. .
_ ._. . . _ _ _ _.
,'
- .
-
-
.
-
s
' Duke Power Company
-2-
RFp 10
90
i
Enclosure:
!
'
Inspection' Report Nos. 50-413/80-22
and 50-414/80-22
.
>
1
cc w/ encl:
J. W. Hampton, Station Manager
,
D. G. Beam, Project Manager
3
!
'
l. .
.
4
,
u
<
-
t
-
2
$
1
I
4
4
4
i'
,
J
I-
4
,
$-
4
4
,
4
$
-
m
I
-
.)
I
-
U
,
, j
.w.
.$.,,'e-
1
' , -
.-
-
.
r
- - , _ ,
,,_3
_ _ . -
..
.
.,-,o.-
m
_..,-_,.
w,
e
.,