Forwards IE Insp Repts 50-413/80-22 & 50-414/80-22 on 800819-22.No Noncompliance Noted
ML20008E189
Person / Time
Site: Catawba  
Issue date: 09/10/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20008E186 List:
References
NUDOCS 8010240339
Download: ML20008E189 (2)


See also: IR 05000413/1980022

Text

( )

-

o

UNITED STATES

~

!

NUCLEAR REGULATORY COMMISSION

n

N

9E

REGION 11

e

'

e

101 MARIETTA ST,, N.W.. *UIT E 3100

  • * " * p

ATLANTA, GEoRG4A %203

SEP 101980

In Reply Refer To:

RII:CRM

50-413/80-22

50-414/80-22

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by C. R. McFarland of this office on

August 19-22, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-ll7 for the Catawba facility, and to the discussion of our

findings held with D. G. Peam at the conclusion of the inspection.

Areas examined during trie inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include e full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so ,

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, tne report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

/

=

C. E. Murphy, Chiet

Reactor Construction and Engineering

Support Branch

Enclosure:

(See Page 2)

80102Ae 3 y

-

.

.

._ _.

__ ._

_ _ _ __ .

_ _ . . __ _ .._.

.. .

_ ._. . . _ _ _ _.

,'

.

-

-

.

-

s

' Duke Power Company

-2-

RFp 10

90

i

Enclosure:

!

'

Inspection' Report Nos. 50-413/80-22

and 50-414/80-22

.

>

1

cc w/ encl:

J. W. Hampton, Station Manager

,

D. G. Beam, Project Manager

3

!

'

l. .

.

4

,

u

<

-

t

-

2

$

1

I

4

4

4

i'

,

J

I-

4

,

$-

4

4

,

4

$

-

m

I

-

.)

I

-

U

,

, j

.w.

.$.,,'e-

1

' , -

.-

-

.

r

- - , _ ,

,,_3

_ _ . -

..

.

.,-,o.-

m

_..,-_,.

w,

e

.,