ML20008D944

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-412/80-08 on 800811-15.No Noncompliance Noted
ML20008D944
Person / Time
Site: Beaver Valley
Issue date: 09/05/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Woolever E
DUQUESNE LIGHT CO.
Shared Package
ML20008D945 List:
References
NUDOCS 8010230706
Download: ML20008D944 (2)


See also: IR 05000412/1980008

Text

g'. ,

%

+

g#

UNITED STATES

d%

"1

NUCLEAR REGULATORY COMMISSION

k

S

REGION I

Ed *

'

631 PARK AVENUE

cf

KING OF PRUSSI A. PENNSYLV ANI A 1$406

+...*

SI? C 5 L13

' Docket No. 50-412

Nguesne Light Company

ATTN: Mr. E. J. Woolever

Vice President

435 Sixth Avenue

Pittsburgh, PA 15219

Gentlemen:

Subject:

Inspection No. 50-412/80-08

,

,

This refers to the routine inspection conducted by Mr. L. Narrow of this office

on August 11-15, 1980, at the Beaver Valley Power Station, Unit 2, Shippingport,

Pennsylvania of activities authorized by NRC License No. CPPR-105 and to the

discussions of our findings held by Mr. L. Narrow with Mr. Washabaugh and other

,

menbers of your staff at the conclusion of the inspection.

,

i

Areas examined during this inspection are described in the Office of Inspection

l

and Enforcement Inspection Reoort which is enclosed with this letter.

Within

(

these areas, the inspectici c;nsisted of selective examinations of procedures

l

and representative records, interviews with personnel, measurements made by the

'

inspector, and observations by the inspector.

Within the scope of this inspectio'n, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

l

inspection report will be placed in the NRC's Public Document Room.

If this

i

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

,

l

application must be accompanied by an affidavit executed by the owner of the

!

information, which identifies the document or part sought to be withheld, and

'

which contains a statement of reasons which addresses with specificity the items

ol.ich will be considered by the Commission as listed in subparagraph (b) (4) of

Section 2.790. The .information sought to be withheld shall be incorporated as

,

i

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

l

I

I

8010230 7 0 6

.

I

l-

l

Duquesne Light Company

2

!

No reply to this letter is required; however, should you have any questions

,

l

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

A.WD 1

Robert T. Car

Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement

Inspection lleport No. 50-412/80-08

cc w/ encl:

R. J. Washabaugh, Quality Assurance Manager

!

!

!

,

.

- . - - -

-.m

-

_

,

-

, , - -

.---,y

,

,

,