Forwards Insp Repts 50-445/90-01 & 50-446/90-01 on 900108- 17.No Violations or Deviations Noted.Util Preoperational Audit Considered Shallow & Ineffective in Uncovering Security Program Weaknesses
ML20006F586
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/16/1990
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20006F587 List:
References
NUDOCS 9002280207
Download: ML20006F586 (3)


See also: IR 05000445/1990001

Text

7

,,,-

yf

Vu

g

.

y

in Repfy Refer To:-

FE8 I 6 l e

Dockets: '50-445/90-01

50-446/90-01

TU Electric-

'

ATTN:

W. J. Cahill, Jr. , Executive

'

.

Vice President, Nuclear

Skyway Tower-

r

400 North Olive, L.B. 81

-Dallas, Texas 7520)-

Gentlemen:

This refers to the inspection conducted by Messrs. R. A, Caldwell and

A, B. Earnest of this office during the period January 8-17,'1990, of

'

activities authorized.by NRC Construction Permits CPPR 126 and CPPR 127 (Units 1

and 2) for the Comanche Peak Steam Electric Station, and to the discussion of

our findings with members of your staff at the conclusion of the inspection.

The inspection reviewed certain areas of your physical security program. Within

these areas, the inspection consisted of selective examination of procedures

- and representative records, interviews with personnel, and observations by the

inspectors. :The areas inspected and the inspection findings are documented in

the enclosed inspection report.

'Within.the scope of the inspection, no violations or deviations were

identified.

It should be noted that although a formal audit ~ of the security

j

-

program.is not required prior to licensing, the pre-operational audit

performed by the TV Electric quality assurance department and discussed in

paragraph 5 of this, report was considered shallow-and ineffective in

uncovering- security program weaknesses.

We have also examined actions you have taken with regard to pre'viously

identified inspection findings.. The status of these items is.' identified in-

'5

'

paragraph 2 of the enclosed report.

'

,.

The material enclosed herewith does not contain'. Safeguards Information as

defined.by-10 CFR Part 73.21 and its disclosure to unauthorized individuals is

not prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

Tiierefore,-the material will be placed in the Public Document Room.

.

L

RIV:SEPS

SEPS

C:SEPS

D:DRS

AD:CPPD:NRR

RCaldwell:nh

AEarnest

DPowers

ABeac

RWarnick $d

A /0/90 p

R/ 6/90h' A/l3 /90

g/g/90

2./l&/90

l

9002280207 900216

jDR

ADOCK0500g5

g

t

q

'

f, M ,. ..:

. . .

- TV Electric-

-2-

y

1

s

Should'you have any questions concerning this inspection, we will be pleased to

r

discuss them with you.

Sincerely,

R. F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

+

Office of Nuclear Reactor Regulation

+

Enclosure.

Appendix - NRC Inspection Report

50-445/90-01

50-446/90-01

- cc w/ enclosure:

-

TU Electric

~

ATTN:

Roger D. Walker, Manager

.

Nuclear Licensing

Skyway Tower

>

400 North Olive Street, L.B. 81

,

Dallas, TX 75201

-,

- Juanita Ellis-

President - CASE-

1426 South Polk Street

.

Dallas, TX 75224

'

c

GDS Associates, Inc.

Suite 720

1850 Parkway Place

,

Marietta', GA-' 30067-8237

Billie Pirner Garde, Esq.

Robinson, Robinson, et al.

. 103 East College Avenue

'

Appleton, WI 54911

-TU Electric

(

Bethesda Licensing

>

)

3 Metro Center, Suite 610

Bethesda, MD 20814-

<

Heron, Burchette, Ruckert, & Rothwell

u

ATTN: William A. Burchette, Esq.

Counsel =for Tex-La Electric

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

Washington, DC 20007

a

.

.

.

.

{, N ,

.

=+

, ,

E

r

Til Elec'tric-

-3-

E. F. Ottney

E-

'P.O. Box 1777:

Glen. Rose, TX =76043

w

Newman & Holtzinger, P.C.

ATTN: Jack R. Newman, Esq.

1615 L. Street, N.W..

Suite 1000

Washington, DC 20036

' Texas Department of Labor & Standards

ATTN:

G.-R. Bynog, Program Manager

F

Chief Inspector

. Boiler Division

P.O. Box 12157 Capitol Station

Austin, TX' 78711-

Honorable George Crump

-County Judge-

i

Glen-Rose, TX 76043

!

Texas Radiation Control Program. Director

1100 West 49th Street

Austin, Texasi 78756

.

1

bec>to DMB (IE04)

'

~

E

bec dist, by RIV:

CPPD Reading (MS:

7-H-17).

,

l

  • RIV Files-

Local PDR.

ADSP Reading (MS:

7-D-24)

  • Site Reading File

-

  • MIS System, RIV

NRC-PDR

  • RSTS Operator
  • DRP

,.

'

  • L.

Shea,- ARM /LFMB

J. . Lyons,. CPPD, NRR

RPB RIV-

C. Vandenburgh

LJ. Wilson, CPPD, NRR

M. Malloy, CPPD, NRR

.

-J. Moore, OGC-WF

J. Gilliland

!

M. Fields; CPPD, NRR~

E. Jordan

l

B.: Grimes, NRR-WF

B. Hayes

-i

  • DRSS-FRPS

D. Crutchfield, ADSP, NRR

  • R.'Warnick, CP
  • J. Wiebe, CP

1

).

1*H; Livermore, CP

CPPD-LA

i

C. Grimes, CPPD, NRR

T. Quay, NRR

J. Partlow, NRR

  • R. Martin

.

- w/766-

!

I

- - - - - - - - - - - - - - -

- - . - - - - . - - - - - -

. - --- - -

-