Forwards Safety Insp Rept 50-293/90-02 on 900108-12.No Violations Noted
ML20006F255
Person / Time
Site: Pilgrim
Issue date: 02/07/1990
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20006F256 List:
References
GL-89-04, GL-89-4, NUDOCS 9002270300
Download: ML20006F255 (2)


See also: IR 05000293/1990002

Text

V~

pL,

$7;

,

f.!{i-

y.m '

'

6

'

,;

-L

U'.

'

FEB 0171930

l

L

,

>

b

Docket No. 50-293

w

Bo'ston Edison Company

"

i

ATTN: Mr.: Ralph G.~ Bird

p

P

,

Senior:Vice President - Nuclear

Pilgrim Nuclear Power Station

",

RFD #1 Rocky Hill: Road

.

Plymouth, Massachusetts 02360

,

,

. Gentl emen :-.

[

Subj ect:-- ~ Inspection' Report No. 50-293/90-02-

This-letter refers to the routine safety _ inspection conducted by Mr. Joseph A. .Golla-

of this office on-January ~8-12, 1990, of' activities related to your Inservice:

Test Program and' Engineering and Technical Support to your facility and to:the

discussions ~ of our findings held by Mr. Golla with Mr. K.. Highfill at the conclusion L

.

s

of the inspection. The activities reviewed during this inspection were1 authorized:

y

>

.by NRC license No. DPR-35.

. Areas _ examined during this inspection are described in the NRCLRegion I

Inspection Report which is enclosed with this letter. Within these areas,

-

the' inspection _ consisted of selective examinations of procedures and

-

representative records,. interviews with personnel, and ob'servations,by

-

I

.

.the~ inspector.

w

Within.the: scope of this inspection, no violations' were observed,

i

1

j,

No-reply t'o this letter is required. -Your cooperation with us in this matter-

ll

-is appreciated.

1

L

,

'

Sincerely,

Ociainel Signed By:

~!

Mcryin V/. Hodges

,

,

Marvin W. Hodges, Director

j

'

Division of Reactor Safety

1

.

i

_

. Enclosure:

NRC Region I Inspection Report No. 50-293/90-02

e

3

!

c

i

IF$-

0FFICIAL RECORD COPY

IR PILGRIM 90-02 - 0001.0.0

f

9002270300 900207

h

02/06/90

PDR- ADOCK 05000293

g

Q'()/ \\ \\

o.

PDC

up

+

3

,

..

<:, .

+

4

FEB 0 i 1990

-

Boston Edison Company

2L

i

.

'

cc w/ enc 1:'

'

K. Highfill, Vice' President, Nuclear Operations

R. Anderson, Plant Manager-

'J. Dietrich, Licensing Division Manager

E. Robinson, Nuclear Information Manager

R..Swanson, Nuclear Engineering Department Manager

'

'The Honorable John'F -Kerry

.

The Honorable Edward J. Markey

The Honorable Edward P. Kirby

The-Honorable Peter V. Forman

The Honorable Lawrence R. Alexander

The Honorable Nicholas J. Costello

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairmhn, Duxbury Board of Selectmen

Plymouth Civil Defense Director

R. Hallisey, Department of Public Health,-Commonwealth of Massachusetts

. R. Adams, Department oi' Labor-and Industries, Commonwealth of Massachusetts

D. Tibbetts, Acting Massachusetts Secretary of Energy Resources

Sarah Woodhouse, Legislative Assistant

A. Nogee, MASSFIRG

Public Document Room-(PDR)

Local Public Dccument Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

. Commonwealth of Massachusetts, SLO Designee

,

bec w/ encl:

Region I Docket Room (with concurrences)

Management: Assistant, DRMA (w/o encl)

W. Russell, RA

J. Dyer, EDO

R..Wessman, NRR

D. Mcdonald, NRR-

J. Joh6 son, DRP

R. Blough, DRP

C. Marshcall, SRI - Pilgrim (with concurrences)

M. Conner, SALP Reports Only

PA0 (21) Salp Reports and All Inspection Reports

,

RI:DRS

R, $RS

6

/

RI:DRS

/

G la rw

E pen

J. De

Hodg

G/h//0'

1/3 /90

d/k0

yg/90

1

0FFICIAL RECORD COPY

IR PILGRIM 90-02 - 0002.0.0

01/31/90

--

.

- . ..

- - .