Text
V~
pL,
$7;
,
f.!{i-
y.m '
'
6
'
,;
-L
U'.
'
FEB 0171930
l
L
,
>
b
- Docket No. 50-293
w
Bo'ston Edison Company
"
i
ATTN: Mr.: Ralph G.~ Bird
p
P
,
Senior:Vice President - Nuclear
- Pilgrim Nuclear Power Station
",
RFD #1 Rocky Hill: Road
.
Plymouth, Massachusetts 02360
,
,
. Gentl emen :-.
[
Subj ect:-- ~ Inspection' Report No. 50-293/90-02-
This-letter refers to the routine safety _ inspection conducted by Mr. Joseph A. .Golla-
of this office on-January ~8-12, 1990, of' activities related to your Inservice:
Test Program and' Engineering and Technical Support to your facility and to:the
discussions ~ of our findings held by Mr. Golla with Mr. K.. Highfill at the conclusion L
.
s
of the inspection. The activities reviewed during this inspection were1 authorized:
y
>
.by NRC license No. DPR-35.
. Areas _ examined during this inspection are described in the NRCLRegion I
Inspection Report which is enclosed with this letter. Within these areas,
-
the' inspection _ consisted of selective examinations of procedures and
-
representative records,. interviews with personnel, and ob'servations,by
-
I
.
.the~ inspector.
w
Within.the: scope of this inspection, no violations' were observed,
i
1
j,
No-reply t'o this letter is required. -Your cooperation with us in this matter-
ll
-is appreciated.
1
L
,
'
Sincerely,
Ociainel Signed By:
~!
Mcryin V/. Hodges
,
,
Marvin W. Hodges, Director
j
'
Division of Reactor Safety
1
.
i
_
. Enclosure:
NRC Region I Inspection Report No. 50-293/90-02
e
3
!
c
i
IF$-
0FFICIAL RECORD COPY
IR PILGRIM 90-02 - 0001.0.0
f
9002270300 900207
h
02/06/90
PDR- ADOCK 05000293
g
Q'()/ \\ \\
o.
up
+
3
,
..
<:, .
+
4
FEB 0 i 1990
-
Boston Edison Company
2L
i
.
'
cc w/ enc 1:'
'
K. Highfill, Vice' President, Nuclear Operations
R. Anderson, Plant Manager-
'J. Dietrich, Licensing Division Manager
E. Robinson, Nuclear Information Manager
R..Swanson, Nuclear Engineering Department Manager
'
'The Honorable John'F -Kerry
.
The Honorable Edward J. Markey
The Honorable Edward P. Kirby
The-Honorable Peter V. Forman
The Honorable Lawrence R. Alexander
The Honorable Nicholas J. Costello
B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairmhn, Duxbury Board of Selectmen
Plymouth Civil Defense Director
R. Hallisey, Department of Public Health,-Commonwealth of Massachusetts
. R. Adams, Department oi' Labor-and Industries, Commonwealth of Massachusetts
D. Tibbetts, Acting Massachusetts Secretary of Energy Resources
Sarah Woodhouse, Legislative Assistant
A. Nogee, MASSFIRG
Public Document Room-(PDR)
Local Public Dccument Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
. Commonwealth of Massachusetts, SLO Designee
,
bec w/ encl:
Region I Docket Room (with concurrences)
Management: Assistant, DRMA (w/o encl)
W. Russell, RA
J. Dyer, EDO
R..Wessman, NRR
D. Mcdonald, NRR-
J. Joh6 son, DRP
R. Blough, DRP
C. Marshcall, SRI - Pilgrim (with concurrences)
M. Conner, SALP Reports Only
PA0 (21) Salp Reports and All Inspection Reports
,
RI:DRS
R, $RS
6
/
RI:DRS
/
G la rw
E pen
J. De
Hodg
G/h//0'
1/3 /90
d/k0
yg/90
1
0FFICIAL RECORD COPY
IR PILGRIM 90-02 - 0002.0.0
01/31/90
--
.
- . ..
- - .