ML20006E958

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-461/89-38 on 891219-900202 & Notice of Violation
ML20006E958
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/16/1990
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20006E959 List:
References
NUDOCS 9002270003
Download: ML20006E958 (2)


See also: IR 05000461/1989038

Text

,

_

.

, , .

'

,, .,;

' '

'

Q VD .

,

3;;

.

FEB 161990

Docket No..'50-461'

Illinois Power Company

ATTN:

J. S. Perry _

<

Vice President

Clinton Power Station

-Mail Code V-275

'

Post Office Box 678

-Clinton, IL 61727

-

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. P. G. Brochman,

S. P. Ray, and P. R. Pelke of this office from December 19, 1989, through

'

<

February 2, .1990, of. activities at Clinton Power Station, authorized by NRC

,

Operating License No. NPF-62, and to the discussion of our findings with you

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection re) ort identifies areas e*xamined during

)

the inspection. Within these areas, tie inspection consisted of a selective

examination of procedures and representative records, observations, and

,

interviews with personnel.

"

.

During this inspection, certain of your activities appeared to be in violation-

,

of NRC requirements, as specified in the enclosed Notice. A written response

!

is required.

In accordance with 10 CFR 2.790 of the Connission's regulations, a copy of

this letter. the enclosures, and your response to this letter will be placed

.in the NRC Public Document Room;

1The responses directed by this letter and the accompanying Notice are not

>

' subject to the clearance procedures of ~ the Office of Management and Budget

>

as required-by the Paperwork Reduction ~Act of 1980, PL 96-511.

'

We will gladly discuss' any questions you have concerning this-inspection..

'

Sincerely,

' (~ d

y

R. C.

nop, Chief

Reactor Projects Branch 3

Enclosures:

[-

1.

Notice'of Violation

.

is

2.

Inspection Report

No.50-461/89038(DRP)

4

See Attached Distribution

GfGS

/

M

M

A'ligh0 Knop"Sk

%

Brochman/ims

Pelke

Ri g

9002270003.900216

2W.

'

reew

,

. - .

M3

.+s

n

..

,

'

sl;

.-
.

Illinois Power Company

2-

FEB 161990

j

'

Distribution

cc w/ enclosures:.

J. Cook, Manager, Clinton Power Station

F.-Spangenberg, III, Manager:-

Licensing and Safety-

.DCD/DCB(RIDS)

Licensing Fee Management Branch

<

" Resident Inspector, RIII

J'. Hickman,-NRR, PM

J. McCaffrey, Chief, Public

Utilities Division

H. Taylor, Quality Assurance

Division, Sargent'& Lundy-

-

Engineers

, Patricia-O'Brien, Governor's

Office of Consumer Services

<

'

(S. Zabel, Esquire, Schiff, Hardin,

& Waite

.-

.

L.-'Larson, Project Manager,

General Electric Company

. Chairman, DeWitt County Board

&

Illinois Department ofL

'

t

- Nuclear. Safety

!

,

.- }

ih

Y

l

,-

4

1

i

I

t

k

o

l

's

.

.

.

.

-