Forwards Errata to Final SALP Repts 50-424/89-26 & 50-425/89-30 for Oct 1988 - Sept 1989,per 891214 Public Meeting & Util 900108 Response to Repts
ML20006E655
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/30/1990
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20006E656 List:
References
NUDOCS 9002260187
Download: ML20006E655 (31)


See also: IR 05000424/1989026

Text

_

_

q

,

'

4.

. '

o.

,

0FFICIAL FILE COPY

j

'

o

/

p'#: ,

'JAN !01990

'

.

l

' Docket Nos.- 50-424, 50-425

License Nos..NPF-68, NPF-81

'

Georgia Power Company

' ATTN:

Mr.'W. G. Hairston, Ill

Senior Vice President -

'

'

. Nuclear Operations

i

- P. O. Box 1295

. Birmingham, AL 35201

Gentlemen:

SUBJECT: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE - FINAL REPORT

(NRC INSPECTION REPORT NOS. 50-424/89-26 AND 50-425/89-30)

-

Thank you for your January 8, 1990, response to our December 6, 1989, Initial

Systematic Assessment of Licensee Performance (SALP) Report.

This report

contained a periodic evaluation of your Vogtle facility for the period of -

October 1,1988, through September 30, 1989.

The results of this report were

discussed with you at a public meeting held at your Vogtle facility on

. December 14, 1989.

Your response Lstated that you did not agree with the evaluation that the

overall . level of . performance of Plant Vogtle' during this SALP period was

comparable to that of the last SALP period. Your response also requested that

,

a revision to the SALP Report be made to note that the overall performance had-

improved since the last evaluation period.

While'the wording.of the initial report and transmittal letter was not intended

' to minimize the improvements noted in certain areas, it is recognized that the

wording's connotation could allow for misinterpretation. We have reviewed the

SALP Report and cover letter and believe that the areas' of performance

'

improvement and decline are adequately described without reliance upon the

sentence in question.

Bearing this in mind, the SALP report and transmittal

letter have been modified by deleting the sentence in question.

No reply to this letter is required; however, should you have any questions

concerning these matters, I will be pleased to discuss them with you,

i.

Sincerely,

Original Signed by

James L. Milhoan/for

Stewart D. Ebneter

Regional Administrator

Enclosures: -(See page 2)

90022601b7.90 BOO 424 h

PDR

ADO K 05

i

\\ \\

130

\\

1

-4 '

r

g.

PDC

6,7

(:VQ

+

w

,

i

I

>

'

,

fr .

-

s - */

.c;

..n

<.

>

.

<

(9

,;c : g

.

5

-

f.

.

.

,e

. Georgi a-' Powe'r' Companyf

2-

,

,

R

$>k

'

l

Enclosures:

.

.

.

'

'

'

,

6m-

1.

SALP Presentation Meeting Summary

i

-

.

2.- SALP Presentation Meeting Slides

- '

.

3.; Lice'nsee Response dated

L.

' '.

E

4-.

January 8,,1990

.

.J, ;

1,

1

Errata; Package

-

.

,'ccw/ enc 15:

-

,

R.' P. Mcdonald

'

p.'

. Executive Vice' President-Nuclear

N

LOperations

'

E

Georgia Power Company

, P. 0,' Box.1295

Birmingham, AL 35201-

p

'C.:K. McCoy.

.

p

Vice President-Nuclear

b

iGeorgia Power Company

I

P. O. 1295

l-

. Birmingham,'AL 35201

m

^

G. Bockhold..Jr.

'

General-Manager, Nuclear Operations

> >

Georgia Power Company?

" P ..- 0. ' 1600

i;

.Way'nssboro~, GA: 130830

LJ. A. Sailey

'

Manager-LicensingL

.

Georgia' Power: Company

'

.P. O." Box 1295

.

Birmingham,JAL 35201-

L-

Bb.W. Churchill,= Esquire

.

.Shaw, Pittman, Potts, and Trowbridge

2300 N' Street, NW

Washington, D.

C'.

20037-

!J. E.J oiner, Esquire

J

Troutman, Sanders, Lockerman, and

.Ashmore'

'

1400 Candler Building

C

127 Peachtree Street, NE

N

. Atlanta, GA= 30303.

,

1

D. Kirkland, III, Counsel

<

.0ffice of the Consumer's

I

Utility ~ Council

Suite 225,.32 Peachtree Street, NE

.~ Atlanta, GA 30302

(cc w/e'ncis. cont'd - see page 3).

.

[..[

t

p-

1

..

.

. *

.. .

, J ' 'a

'

g g $110:

.,

Georgia Power Company

3

l

_

.cc w/encis:

Office of. Planning and Budget.

Room 615B

270 Washington Street, SW

Atlanta, GA '30334

Office of the County Commissioner

Burke County Commission

Waynesboro, GA 30830

J.t Leonard Ledbetter Director

Environmental P.rotection Division

Department ofl Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

Attorney General

Law Department'. .

132 Judicial. Building

Atlanta, GA 30334

State'of Georgia

bec w/encis:

K. M. Carr, Chairman

.T. M. Roberts, Commissioner

K

F. J. Remick, Commissioner

K. C. Rogers, Commissioner

~

J. R. Curtiss, Commissioner

J. M. Taylor, EDO

H.. L. Thompson, Jr. , EDO

R. W. Borchardt, Regional

Coordinator, EDO

T. E. Murley, NRR

S. Varga, NRR

.

E.;Reis, NRR

J. Hopkins, NRR

R. Nease, SALP Coordinator, NRR

Regional Administrators, RI, RIII

RIV,1and RV

K-Clark, RII, PA0

.

A. Herdt, DRP, RII

K. Brockman, DRP, RII

L; Trocine, DRP, RII

K. Landis, Chief, TSS

g

NRC Resident Inspector

DRS and DRSS Branch Chiefs,

-

H:}lb

and Section Chiefs

I:DR

RII:DRP

RIT

RP RI .

E RIlj RP qHQ:Ng

R

INPO

IMPELL

/

kh

Ahl

_

'L'

N\\ N e T,dem

er

k

ne

CHehl

Hopkins DMahthes

. Document Control Desk))Jf e

KB cKman

1pa,dt 1/y90

1hb/90

1/ W/90

1/g/90

0

1

0

/90

RI D

R

ORA

4 AGi

n

JMilhoan

i 1^

90

1/ j/90

i

.

V

&

'

F

..

'

iy ,

i3-

.;

.

a

a

-

.

..

, . .

,

ENCLOSURE 1

MEETING SUMMARY

'A.

Summary

At 10:00 a.m., on December 14, 1989, a management meeting was conducted at

the Vogtle facility near Waynesboro, Georgia. This meeting was held at

our request to- discuss the results of our Systematic Assessment of

Licensee Performance (SALP) evaluation of your Vogtle facility for- the

appraisal period October 1, 1989, through September 30, 1989. The report

documenting this assessment was sent to you on December 6, 1989.

B.

Licensee Attendees

R. P. Mcdonald, Executive Vice President - Nuclear Operations

W. G. Hairston, III, Senior Vice President - Nuclear Operations

C.- K.-McCoy, Jr., Vice President - Plant Vogtle

G. Bockhold, Jr., General Manager - Nuclear Plant

W. B. Shipman, General Manager - Nuclear Support, SONOPCO

A. L. Mosbaugh, Assistant General Manager . Plant Support

W. F. Kitchens, Assistant General Manager - Plant Operations

J. A. Bailey, Manager - Licensing

This list of licensee attendees above does not include a large number of

Georgia Power Company employees that were present at the SALP presen-

tation.

The additional attendees included managers, supervisors, and

various plant staff members. Representatives from the Oglethorpe Electric

Membership Cooperative and the Georgia Public Service Commission were also

present. This large turnout was beneficial to the SALP process and is

highly recommended for future presentations. The free exchange of views

during this meeting was also beneficial.

c

l~

.

C.

NRC Attendees

l

L

S. D. Ebneter, Regional Administrator, Region II (RII)

'

A. F. Gibson, Director, Division of Reactor Safety, RII

r

C. W. Hehl., Deputy Director, Division of Reactor Projects (DRP), RII

'

l

A. R. Herdt, Branch Chief, Reactor Projects Branch No. 3 DRP, RII

W. E. Cline, Branch Chief, Nuclear Materials Safety and Safeguards

!

Branch, Division of Radiation Safety and Safeguards, RII

D. B. Matthews, Director, Project Directorate II-3 (PDII-3), Office of

l

Nuclear Reactor Regulation (NRR)

'

J. F. Rogge, Senior Resident Inspector, Plant Vogtle, Reactor Projects

Section 3B (RP3B), DRP, RII

R. F. Aiello, Resident Inspector, Plant Vogtle, RP3B, DRP, RII

R. D. Starkey, Resident Inspector, Plant Vogtle, RP3B, DRP, RII

j

J. B. Hopkins, Project Manager, PDII-3, NRR

L. Trocine, Project Engineer, RP3B, DRP, RII

D.

SALP Presentation Slides

Refer to Enclosure 2.

,

l

"

~' '

' '

'

L

1

w-

u n

".

.

.

.

8

.

!? '

f

.

gg%

e

,

. Georgia Power _ Company

3

. ,

-

l8

' 'cc w/encis:

Office of Planning and Budget.

Room 615B

270 Washington Street, SW

- Atlanta, GA 30334

' Office of the. County Commissioner

Burke County Commission

.Waynesboro, GA 30830

J. Leonard Ledbetter, Director

Environmental Protection Division

Department of Natural Resources

205 Butler Street,'SE, Suite-1252

[

Atlanta, GA 30334

Attorney General

Law Department

132 Judicial Building

Atlanta, GA 30334

State of Georgia

bec w/ enc 15:

K. M. Carr, Chairman

T. M. Roberts, Commissioner.

F. J. Remick, Commissioner .

K. C. Rogers, Commissioner

J. R. Curtiss, Commissioner

J. M. Taylor, EDO

H, L. Thompson, Jr.,'EDO

R; W. Borchardt, Regional

Coordinator, EDO

T. E. Murley, NRR

S. Varga', NRR

E. Reis NRR

J.' Hopkins, NRR

R. Nease, SALP Coordinator, NRR

Regional Administrators, RI, RIII

RIV, and RV

K. Clark, RII, PA0

A. Herdt, DRP, RII

K. Brockman, DRP, RII

L. Trocine, DRP, RII

K. Landis, Chief, TSS

"g, -

NRC Resident Inspector

DRS and DRSS Branch Chiefs,

',

,

and Section Chiefs

(i

, I:DR

RII:DRP

RJ

RP RI

E RII NqHQ:NgR,

RP

INPD

IMPELL

"

D

/

M\\

vn tam

h(

e

Document Control Desk J

e

K

kman

erat

ne

CHehl

JHopkins D4ayh

t

e)

/

0

1

0

1pa /90 1/g90

1hb/90

1/li790

1/g/9 0

RI D

R

ORA

i AGi

n

JMil/1oan

1

/90

1/ -/90

%

.

_a

O.

.

..*

'

o

-

s

,

,

, ,

~ ;{ ,

O

.

a

w

,

ENCLOSURE 1

'

IL

MEETING SUMMARY

'

A.

Summary.

I=

'At 10:00 a.m., on December 14, 1989, a management meeting was conducted at

the Vogtle f acility near Waynesboro, Georgia.

This meeting was held at

-

our request to discuss the results of our Systematic Assessment of

r

Licensee Performance (SALP) evaluation of your Vogtle facility for the

t

appraisal period October 1, 1989, through September 30, 1989. The report

,

[

documenting this assessment was sent to you on December 6, 1989.

.

-

B.

Licensee Attendees

'

R. P. Mcdonald, Executive Vice President - Nuclear Operations

W. G. Hairston, III, Senior Vice President - Nuclear Operations

C. K. McCoy, Jr., Vice President - Plant Vogtle

G. Bockhold, Jr., General Manager - Nuclear Plant

)

W. B. Shipman, General Manager - Nuclear Support, SON 0PC0

F

A. L. Mosbaugh, Assistant General Manager - Plant Support

W. F. Kitchens, Assistant General Manager - Plant Operations

J. A. Bailey, Manager - Licensing

This list of licensee attendees above does not include a large number of

,

Georgia Power Company employees that were present at the SALP presen-

tation.

The additional attendees included managers, supervisors, and

various plant staff members. Representatives from the Oglethorpe Electric

Membership Cooperative and the Georgia Public Service Commission were also

i

present. This large turnout was beneficial to the SALP process and is

>

highly recommended for future presentations.

The free exchange of views

,

during this meeting was also beneficial.

C.

NRC Attendees

S. D. Ebneter, Regional Administrator, Region II (RII)

A. F. Gibson, Director, Division of Reactor Safety, RII

C. W. Hehl, Deputy Director, Division of Reactor Projects (DRP), RII

A. R. Herdt, Branch Chief, Reactor Projects Branch No. 3, DRP, RII

,

W. E. Cline, Branch Chief, Nuclear Materials Safety and Safeguards

Branch, Division of Radiation Safety and Safeguards, RII

D. B. Matthews, Director, Project Directorate II-3 (PDII-3), Office of

(

Nuclear Reactor Regulation (NRR)

-

J. F. Rogge, Senior Resident Inspector, Plant Vogtle, Reactor Projects

Section 3B (RP3B), DRP, RII

R. F. Aiello, Resident Inspector, Plant Vogtle, RP3B, DRP, RII

R. D. Starkey, Resident Inspector, Plant Vogtle, RP3B, DRP, RII

J. B. Hopkins, Project Manager, PDII-3, NRR

L. Trocine, Project Engineer, RP3B, DRP, RII

j

D.

SALP Presentetion Slides

i

Refer to Enclosure 2.

i

L :s.f..

EXITE5~5'TATES

KCLEAR REGELATORY

4

COMMISSION

.

1

SYSTEMATIC ASSESSMENT

l.

L

0F

,

I

.

LICENSEE PERFORMANCE

I

.

(SALP}

(-

.

i

.

..

.

.

-

.

- . -

- . . - . -

.

. . . . . . . . . . -

. . - . . .

.

-

__

.

l ' ' * '

_ ., : '

'

';

l,

c ', . '

l

'

,,.

.!-

.

-,

GEORGIA POWER

.

COMPANY

e

i

'

!

L

/'

'

OCTOBER 1,1988 through SEPTEMBER 30, 1989

V0GTLE UNITS .1 AND 2

9

1

,

DECEMBER

'4,

1989

WAYNESBOR0 , GEORG A

(

l.

..=

.;.-. . . - .

. - . .

.

- - .

_ _

- - -

- - _ _

.

-

.

,

.

_

. . . . . . .

..

-

i

!

SALP PROGRAM OBJECTIVES

-

i

r

1. IDENTIFY TRENDS IN UCENSEE PERFORWANCE

.

h

'

,

!

2. PROVIDE A BASIS FOR ALLOCATION

.

OF NRC RESOURCES

.

3. IMPROVE NRC REGUl.ATORY PROGRAW

-

.

.

.

'

,

, . _ .

. . .

. . . - - -

_ - - . _ _ - - . . . _ - . _ _ - . _ _ _ _ , _ _ . . _ . _ . . _ _ _ _ _ _ _ _ _

-

- - -

.

. _._ __ . . . _

,

.

.

.

..

i

-

+ -

.

. -

.,

.

-

..

,,

-

REGION H ORGANIZATION

,

4

.

i

l

L-

asara ermaammu

l

g, gggg

i

,,

,

.

.

.

ODUN & ENMI

.

.

I

I

i

!

IM

STAR AIS GOrt.

gyguseras

REIC MARS

comEL

STM

mesusun

.

-

EM,,,,,,

Geumunalsur

ut

a esos

(

an.

x.cu m

om,a a nessa

.

,

t ecome

,

-

l

.

P

SWWIN N

usuus e

INWW W

INRuiW MSOIAE

54C19B F385015

muutspett

BASEIBRSWEN

IMMMER AIS

.

'

.

AB SAFBOOABB

A.pi.s. I.Bm.m.s. .

,

,,

g,,,

IpWV

C. ISS,

NEN

Oft, 4, SMHt

OR,

It, IRAY

(-
  • T

--

g-g

ser-**

W--

-v

->e

sv

--c-'=w++

e +rc e

y-

y-

w-

,-me_.m.-

-

-

-

.

.

. * *

,, ? 4 .'

j

' -

NRR 6RGHIZ4 TION

\\

um w

1

uucu m u m a

"

PROAW Miammt.

peuer sesman,

-

en maas r. m

, ,g,,, ,,,

nomy ass M. sem

_

_._

j

r

i

ASSOC. DIRECTOR FOR

ASSOC. DIRECTOR FOR

)

ASSOC * DIRECTOR FOR

PROJECTS

INSPECTION &

c

SPECIAL PROJECTS

J. PARTLOW

TECHNICAL ASSESSMENT

I

('

]

DIV. W Dl W E W S

me sma

-

N

RDeen

1/t

s. wenn, unma

DMSION OF

n. unas, en o.a

my, y

-

-

' " " " ' " " "

opetmou.cens

TVA. PROJECTS

-

m

ASESWDR

DIV. W HEACTOR

MSPECTION AND

-

,

DMSION 0F

man a

sytoumDs

COMANCHE PEAK

umman w

-

-

)

IN. W nABWWI

ra m enIn a s

-

MRIDICV PENERIES

W. E M

PERWmE

n

-

l

SMUN MUNION

.1

.

. . .

.

. . . - . .

. - . _ . . - _ . . _ _ . _ _ . . - . . _ _ _ . _ . _ _ . . . . . . _ . . _ . _ , . . , . _ - - . - . . . - _ _ _ . . . . _ . . . . . _ _ . . . _ .

E. .

_ __

_ - - _

_ _ __----_ _ __-__

_ _ _ _ __ __ - _ _ _ _ _

_

,

, .

,

f1

-

....

PERFORMANCE ANALYSIS AREAS

FOR OPERATING REACTORS

o

l

A. PLANT OPERAfl0NS

,

l

.

B. RAD 10lAGICAL CONTROLS

l

i

1

i

.

C. MAINTENANCE / SURVEILLANCE

.

D. EMERGENCY PREPAREDNESS

E. SECURITY

.

}

F. ENGINEERING / TECHNICAL SUPPORT

G. SAFETY ASSESSMENT / QUALITY VERIFICATION

.

'

.

,

m

m

.

m

-.

e

. -.-_ _, --- . - - =rw-er

-=.- -

- . - . - - , - --, - - -- --- -,- .-

ev-----we-e,wr,- - - ,

w--v,-,

,

-

.

-

. . .

,

, ; ' ;. .

-

,

AREA PERFORMANCE

I

.

,

1

l

C47EGORY 1

j

UCENSEE MANAGEMENT ATTENTION AND INVOLVEMENT

ARE READILY EVIDENT AND PLACE EMPHASIS ON SUPE

.

PERFORMANCE OF NUCLEAR SAFETY OR SAFEGUARDS

ACTMIES, WITH THE RESULTING PERFORMANCE SUS-

STANTIALLY EXCEEDING REGULATORY REQUIREMENTS.

UCENSEE

RESOURCES ARE AMPLE AND EFFECTNELY USED S0 THA

A HIGH LEVEL OF PLANT AND PERSONNEL PERFORMANC

BEING ACHENED. REDUCED NRC ATTENTION MAY BE

F

!4

APPROPRIATE.

L:

l:

1

. .

. . - . . .

-

- . .

- . - - .

.

. -

.

-

. - -

..

.

.

- . -

-

-

-

-

-

,

c

.

.

>

-

.. .

.-(

>

.

AREA PERFORMANCE

'

,

}

.

CMGORY2

}

.

s

!

i

l

I

UCENSEE MANAGEMENT ATTENil0N AND INVOLVEMENT

N THE PERFORMANCE OF NUCLEAR SAFETY OR SAFEGUARDS

1

ACTMTIES ARE GOOD. THE UCENSEE HAS ATTAINED A

.

LEVEL OF PERFORMANCE ABOVE THAT NEEDED TO MEET

r

,

REGULATORY REQUIREMENTS. UCENSEE RESOURCES ARE

,

ADEQUATE AND REASONABLY ALLOCATED SO THAT GOOD PLANT

AND PERSONNEL PERFORMANCE IS BONG ACHENED. NRC

1

ATTENTION MAY BE MAINTAINED AT NORMAL LEVELS.

.

, , , ,

, .

+-w

y+,~

---~,n,g.-r-,

,e

--.-.. - - , , - - , , , - - ,,-

%.--

v.--.w.e-

--

- w

-

.

,

.

3

.

..

,

.

.

.

.

.

s.

-

.

.

AREA PERFORMANCE

<

!

!

!

!

.

CMEGQPY 3

i

!

l

i

l

UCENSEE MANAGEMENT ATENil0N AND INVOLVEMENT

.

l

N THE PERFORMANCE OF NUCLEAR SAFETY OR SAFEGUARDS

'

l

ACTMTIES ARE NOT SUFFICIENT.THE UCENSEE'S

.

PERFORMANCE DOES NOT SIGNIFICANTLY EXCEED THAT NEEDED

.

TO MEET WINIMAL REGULATORY REQUIREMENTS.

UCENSEE

,

RESOURCES APPEAR TO BE STRAINED OR NOT EFFECTIVEl.Y

1

5

s

i

USED.

NRC ATTENil0N SHOULD BE INCREASED ABOVE

.

NORMAL LIVELS.

.

,

y

..e,-,e

,

-v-

,...-w---

,,.,.,+---%-+.

- . -

---c,++-.

- . - , - - - - . . . - - - - .

,-__ -- _ - _ _-_ _ _ _ _ - .

- - - - - - - - - -

-

8

-

. . .

l

.

.

.

-.

.,

.

EVALEATION CRITERIA

'

I

J

1. WANAGEMENT INVOLVEMENT IN ASSURING QUAUTY

..

j

!

f

2. APPROACH TO THE IDENTIFICATION AND RESOLUTION'0F

'

TECHNICAL' ISSUES FROM A SAFETY STANDPOINT >

.

i

i

,

3. RE!P0lGBESS TO NRC NRATNES

'

,

.

4.. ENFORCEMENT HISTORY

.

..

,

,

!

.

.

l

.

.

N

5. RPORTING AND ANALYSIS OF REPORTABLE EVENTS

, , ,

l

l

.

,

6,. STAFFING (INCLUDING MANAGEMENT)

.

'

-

.

.

.

7.1RAINHG EFFECTNENESS AND QUALIFICATION

l

7

f

. -

-

.

.

--..-

.--.-. --... :

- --

- . . - -

-- - - _

_ .

.

'.

. . .

1

t ,.1

'

l'

e

,3 . . .

.

.

'

i

a

l:

L

VIOLATION SUMMARY

'

OCTOBDt 01,1988 through SEPTDiBER 30,1989

l

I

ll

lil

IV

V

l

(

1

.

.

'

V0GTLE 1

0

0

0

23

1

'V0GRE 2

0

0

0

11

0

-

!

REGION ll AVE.

0

0

2

15

4

'

a

PER UNIT

4

P

.k

.

,m,,,_,...---,...,..-e.,

, ir

..+,.e%..,,.,..-~.,,.,w._

. - . , , - . .

....,-,-._w._---

- - - _ , . . _ _

- - - - - - - - - - - - - - - - - -

..

-

. . .

,

.

,

-

-

.:...

1

1

LERs

3 E R is

-

OCTOBER 1,1988 through SEPTEMBER 30, 1989

,

L

1.EGEND

j

""

1

.

E

MIL kE

.

. g.

,

!

l

M

l

i.

..

1

'

'

'

,

I

,

'

L,

m"

24

8

l ,,.

.

n

,.

7

-

Zst

"

le "

i

l'

-

e-

(

'

V0Gilf

E NATL AVE. WE

BW

E

3 p"- y3 {

-

-

- . .

-

- . . . . . -

. . . - . . - . . . . . - . . - .

- . -

';;;

.

.

.

-

.. .

.

-

i

.

!

_ERS

3ER Ls~

~

OCTOBER 1,1987 through SEPTEMBER 30, 1988

.

uome

//d urun

.

.

,

}mutl

. .

mg

-

e -

p

.

L

3

,,

.

-

L

..

21

.

2

-

,

E

[

j.

g

1

unia

amaa

a

P ANT "tSE'

~

.

'

. -

. .

. . - . - . . - . .

- . - - - .

- . . - . .

- - -

.

-

.

. -

- .

.

L-

- - _ - _ - _ _

-

-

.-

.

t

.-

. *

l

l

...

.-

.

-

- =

l

L

,-

L

V0GTLE LERs

-

.

,

I

l

OCTOBER 1,1988 THROUGH SEPTEWKR 30, 1989

.

""

LEGEND

,.

,

,

69

PERSONNEL (TOM.) = 40

.

e

w -

,.

b PERSONNEL (OPERAT

,

PERSONNEL (MAINTENANCE) = 4

" "

-

l-

~

PERSONNEL (TEST /CAUB) = 12

.

. m-

-

a

hl

PERSONEL (OTHER) = 8

'

.,

u.

,

l

0 ..

'

DESIGN / CONST. = 10

.

u

aW

j

EEE COMPONENT FAILURE = 16

,

s

<

  1. N,A OTHER = 3

Z 30- -

W

?

e

>

' " ii

.

" """"

"

":"l

"

":":

"

y

[

0-

-

,.

: :::

'

. . ...

--

-

0

-

. _ _ _ .

l

-

.

PLANT

PERSONNEL

>

--.

-

- - . . - . .

. - .

s

i

-

.

'

j

..

. . .

. . - .

.

.

.

.

V

GTLE LERs

.

OCTOBEP.1,1987 thnmgh SEPfDER 30, $5

)

1I00 0

44

55iPGS000m,(egur)a4

e -

,

Pommes. (i.d/.si) = is-

,

,

J

PBS010E (molnlenense) e S

'

s

'

i

e

-

POWWOR (opereAng) a 4

E omm

L

l'

2s

'

m

.

_ _

. _

'

EE E EE

COMP 0NDIT FAEAN e 4

l

s.

-


l

W

,

L

[7

DESWI/CW5f.=it

l

i

.

D

'

+cePasom a m . m

L

r

E

E

E

E

E

-*

-

.

3

b

p

--

-

-

.

5"

t

t

1

PLANT

PBSmeE

4

,

,

_

m

, . , - . - . . . . -

-.,,.-,_,-,,..mo-.-_,_,,m

.,_,..--.,-.,.,m.-.

-.-,,%.,

.-., . . , , - - _

y

.

m

-m--

--=-=-----i

--

m

8

O

.l

l

, ' '

,$.

.

'

~'

. ' ,

-

. , , ,

V0GTLE LERs

1

'P m T)

1

OCTOBER 1,1988 through SEPTEMBER 30, 1989

!

)

,

'

,

,

4

!

PERSONNEL

58%

i

L

i

.. =

---

l

L

i:

L

OTHER 4.3%

g

'l

I

14.5%

23.2%

DESIGN /CONST.

.. .

COMP. FAILURE

<

.

. . . . . . . .

.

__

. .-

. . .

.

.

.

. .

.

. .

. .

.

. . . .

.

.

. . . .

. . . . . .

. . . .

. . . -

-

-

-

,

. . .

.

V0GTLE LERs

(PLANT)

.

OCTOBER 1.1987 through SEPfDdOER 30.1988

.

PERSONNEL

.

4

-

,

~

OTHER 4.85

1

COMP. FMLURE 9.15

1

.

DESSN/CONST.

1

r

i

,

J

l.

l

I

1

f:

)

(

1

,.

.

1

,

-

&

--

c-.

-

.__,-m__

, . , , _ _ _ _ , _ , , . , , _,_,_

_

_

.

.

.

.

.

.

'o

-

. . .

V0GTLE LERs

(DERSO N h EL}

OCTOBER 1,1988 through SEPTEMBER 30,1989

TEST /CAUB.

30%

MAINTENANCE

f

19%

/MMEf

- OTHER

15%

OPERATIONS

-

,

._-

,

455

PERSONNEL

!

. _ - .

-

-

.

.

.

6

.

a

,

V0GTLE LERs

-

(PERSONNEL)

ociosta 1,1987 through sEPTodesa m 1988

0

9

e

. 8

9 -

e

'

TEST /CAUB.

,

53.6%

'

cans

.

1

l

14.35

OPERAfl0NS

l

l

---m -

m .

.

_ _ _ . _ .

'

c;: _

j ...,

-.,

4

'.:

)

,

1

I

5 .g * -

,s '

,

, . g

' 'e .

.*

<

'

,

t

' OPERATIONS-CATEGORY 2

l

.

-

.

STRONG MANAGEMENT SUPPORT FOR OPERATIONS

PROFESSIONAL CONTROL ROOM ACTIVITIES

-i

,

"

,

~ PERSONNEL ERRORS CAUSE OPERATIONAL EVENTS

' '

L

EFFECTIVE FIRE PROTECTION PROGRAM

I

i,:

,

e

t

.

+

.

1,

t

i

l:

e

L

l-

l

Ie

,

. .

l

t

,

.-

i

)

i

e

-

, _ - -

.

-

,

..

..

.

.-

-

..

.-

".

.v'.

.y-,-

,,,

. ll7 ;' >

i.

.

,

. , : .. ..

.

RADIOLOGICAL CONTROLS-CATEGORY 2(1)

'

!

i

STRONG MANAGEMENT SUPPORT

l

i

' -

IMPROVED REGULATORY COMPLIANCE

.

,

t

EFFECTIVE PRIMARY AND SECONDARY CHEMISTRY PROGRAMS

,

l

' -

RADIATION EXPOSURES MAINTAINED LOW

F

  • -

ADEQUATE CONTROL OF RADI0 ACTIVE EFFLUENTS

.-

'c

.l

ADEQUATE RADIOLOGICAL CONTROL AUDITS

/

7

i

I

F

_A^,

'

i. - *-

t

__ 3

,

u

.- .

-*; .

p,,

,

.

1

..

.

.

- MAINTENANCE / SURVEILLANCE-CATEGORY 1

t

'

'

- *-

-

WELL QUALIFIED MAINTENANCE STAFF

+

1

-

STRONG MAINTENANCE PLANNING

,;

!

't

.

' '

EFFECTIVE PROBLEM IDENTIFICATION AND CORRECTION

.

1

r

i

'

IMPROVED SURVEILLANCE PROGRAM

a

h

'

o

'

7

't

.i

.

i

1

A

k

1-.

- ,

.

-

.

-

-_

. . _ . -

--

...

. . . .

,

,

.t

". . ;,1 ) .

~

s,'

..:

,

.

., g " *n:

  • -

L

I ,"

,

EMERGENCY PREPAREDNESS-CATEGORY 2

1

,

' .

ADEQUATE STAFFING.

l.,

EFFECTIVE TRAINING

, :'

.q

-

<

ADEQUATE FACILITIES AND EQUIPMENT

-

1

t.':

EFFECTIVE AUDITS

.l

L

i

.

J

i

' DEMONSTRATED' ABILITY TO IMPLEMENT PLAN

l

-

'

'

>

,

r

,

i

I-

['.

-

l

li

..

4

( i.

..

~

.

.

_ _-_

- .

.

.

,2-

. t.1 - .

.

,

k--

,.r'...
-- .

.

,:

j ..;

q

-

~!

SECURITY-CATEGORY 2 (D)

,

i

'

' ADEQUATE STAFFING

-

.,

' '

GOOD PROCEDURES

ADEQUATE TRAINING

.;

IMPLEMENTATION PROBLEMS

!

-

,

~

,

. f

'

r

>

>

l

,

'

.

,

9

I

b

9

'

i j'

t. ,

!

7

'

.

i

1

.

f

f

.i

,

..

.

-

-

- .

.

- - -

-

- - -

--

-

A'

x.

'

.

.

,.

,. j f

' h1. . * .'

-

1

'

I

,

y w!:fc .: ,

.

.:

hi;

  • e.

-i

'*'

.

,,

s

hs

ENGINEERING / TECHNICAL SUPPORT-CATEGORY 2

,

4

EFFECTIVE CORPORATE.AND ONSITE ENGINEERING SUPPORT.

,

-SATISFACTORY DESIGN' CHANGE ACTIVITIES

,-

'

OPERATOR EXAM RESULTS INDICATE EFFECTIVE TRAINING

>

"

r

.

POOR QUALITY OF DRAWINGS IN CONTROL ROOM

"

.

'

-t

c

,.

>

4

9

'

-.

.i

I

'

.

1'.

1

'

l

1

,

<

'

1

l'

1:

, . ! i .}

n

-

( "l

llD':

. .

. ;':

-

^

.

lt r -i

- ,

i

j/7.Q'; . '4

W

,

,

-SAFETY ASSESSMENT / QUALITY VERIFICATION-CATEGORY 2-

-

'

't

>

=i

AUDITS'WERE EFFECTIVE

.

' '

CORRECTIVE ACTIONS NOT ALWAYS EFFECTIVE

'

?

MOST' EVENTS PROPERLY REPORTED,

,

' LICENSING SUBMITTALS WERE ADEQUATE

.

,.

EFFECTIVE QUALITY CONCERNS PROGRAM

..

1

'

i

+

f

1

i

t

I

'g_

.

+

-

,-,

_

.

...

. .

.

.

'4u;.. . .

d,S I'$-:'.1 's .

'

1

_ .

1

UNIT 2 PREOPERATIONAL TESTING-CATEGORY 1

"

. 1

  • -

.

TEST-PROCEDURES WERE ADEQUATE

'

TEST DEFICIENCIES WERE PROPERLY RESOLVED

-

l

TESTING WAS' COMPLETED ON SCHEDULE

'

'

]

1

?

UNIT 2 STARTUP TESTING-CATEGORY 1

TEST PROCEDURES WERE ADEQUATE

i

,

k'

' ' -

TESTS WERE PROPERLY CONDUCTED

1

- !

!

EQUIPMENT FAILURES WERE THOROUGHLY EVALUATED

,

r

i

.

OPERATOR PERFORMANCE WAS WEAK

'

1

l

~7y--

wr

-

m--

-

- - -

m

er

M

-

-

-

..-

.

--

,

.,

_

'

'

t* i -4 Georg a Poaet cor'wi ;

,

,,

-

'

333 Pcd nont A.t'nd

!"

"EN' CLOSURE 3.-

J

t * ' - +-

.-

0;, m:.' A F' 6.f;. 3 Aunta Georg-a sem;

'

,

e;

- '

1eiephone 404 5?0 3195 =

.j

r

>

em

' *I-

W

Ma4ng Address. . . . .

H

.

40 inve' ness Cente' Pa4 *ay ~

'

Post OHce Bos 1295 .

,

J

Birminghaan. Alabarne 3520t

-

30 JAN 12- P Uhur cwiem

w onone20s m ese'

'

January 8, 1990-

,

une sour

w, s. Hemen, m

ELV-01211

Senior Vee Pres' dent -

<

. Nuclear Operatons

01911

1

, .

-Docket Nos. 50-424

50-425

"

i

'

U. S. Nuclear Regulatory Commission

' ATTN:1 Document Control Desk

-

Washington, D. C.

20555

q

1

Gentlemen:

,

u

V0GTLE ELECTRIC GENERATING PLANT

RESPONSE.TO SYSTEMATIC ASSESSMENT OF

LICENSEE PERFORMANCE

q

}

v

,

PI

Georgia Power Company-(GPC) has reviewed the information presented in the

Systematic' Assessment of Licensee Performance (SALP) Report transmitted.by your

letter dated December 6,1989, and at_ the meeting held between GPC and the NRC

'

3

'

>

at'the Vogtle Electric Generating Plant site on December.14,1989.

~i

- We! appreciate the constructive comments made in the SALP evaluation, as well as~

j

'your recognition of GPC's efforts and successes in improving our performance.

1

GPC~is fully. committed to the safe and efficient operation;of its' nuclear'2

plants. .We:take the SALP Bostrd recommendations seriously and will use this

information1 in' the continuirig process ofimproving our performance.

However,-GPC1does not agree with the NRC's evaluation as stated in the SALP~

'

Report and the. transmittal letter, .that the overall level of performance during-

"

this.SALP period is comparable to that of the last SALP period.

Some.of the

'

reasons for this disagreement are:

<

the number of unplanned reactor trips during this period was

1

0

i

significantly lower when compared to.the.last period,

1

o

the number andi severity level of violations has been significantly-

'

reduced,

>

o

the Plant P.evhw Board membership has been upgraded to include

'

department mantgers, which provides a higher level of review of safety:

issues brought be' fore this board,

2

during this period the reliability and availability of the units.was

o

greater than during the last evaluation period which can be attributed

-;

to a more experienced and disciplined operating staff.

1

,

.

>J a l4

p. n

.

= hot +wng

DRP OFFICIAL COPV

- - - --

-

-

- - -

- - - -

--

- - - -

._

_

_

.

_.

,

j$.

'

!

fddIglaPoiterA

4K#

.

.

2

1

k

U. S. Nuclear Regulatory Commission

ELV-01211

e

' Pace Two

l

It-should also be noted that during this evaluation period, Unit I successfully

completed it's first: refueling outage and Unit 2 successfully completed

construction, loaded fuel, completed power ascension and was placed into

~

operation. This is as opposed to one unit in operation for the previous-

evaluation period. GPC requests these comments be taken into consideration and

a revision of the SALP Report be made to note that the overall performance has

improved since the last evaluation period.

Should you have any questions- please inquire.

,

Sincerely,

,

(

(Pw p

W. G. Hairston, III

WGH,III/ JAB /gm

q

.

xc: Georaia Power Company-

Mr. C. K. McCoy

- '

.

Mr. G. Rockhold, Jr.

'

Mr. P. D. Rushton

Mr.:R. M. Odom

NORMS

[

U. S. Nuclear Reaulatory Commission

.y

-

l:-

Mr. S. D.. Ebneter, Regional Administrator

i

1

Mr. J. B. Hopkins, Licensing Project Manager, NRR

.

,

L

Mr. J. F. Rogge, Senior Resident Inspector, Vogtie

,

-j

l

.

.-

L

!

-

.- .-~~ L-

- - -

- - ----- -- -

-- --- . - - - - - .

- - - -

- -

-

-- -

-