Forwards Insp Repts 50-317/89-27 & 50-318/89-28 on 891113- 1231 & Notice of Violation.Concern Raised Re Protracted Chemistry out-of-spec Condition on Steam Generators
ML20006E287
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/07/1990
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20006E288 List:
References
CAL-89-08, CAL-89-8, CAL-RI-89-8, NUDOCS 9002220522
Download: ML20006E287 (2)


See also: IR 05000317/1989027

Text

,

t

'[

g.

-

I.

  • -

.o

L

FEB 071990

Docket / License Nos.:

50-317/DPR-53

50-318/0PR-69

Baltimore Gas and Electric Company

ATTN: Mr. George C. Creel

Vice President - Nuclear Energy

Calvert Cliffs Nuclear Power Plant

MD Routes 2 and 4

Post Office Box 1535

Lusby, Maryland 20657

Gentlemen:

Subject: Combined NRC Resident Inspection Report Nos. 50-317/89-27 and

50-318/89-28

This report transmits the findings of the routine resident inspection conducted

at the Calvert Cliffs Nuclear Power Plant. At the conclusion of the inspec-

tion, these findings were discussed with Mr. Russell of your staff,

a

Two apparent violations of NRC requirements are cited in Appendix A.

O'ne in-

volved chemistry out of specification in the steam generators.

The second

violation involved failure to adequately separate safety related cable groups.

The pattern of identified deficiencies is indicative of a programmatic weakness

in 'the assurance of adequate separation of safety related electrical cable..

Paragraph seven of the report discusses several exampics of inadequate com-

mitment . followup by your ttaff.

Of particular concern is the protracted

chemistry out of specification condition on your steam generators.

These are-

considered additional examples of the problems identified in Combined In-

spection Report 50-317/89-31 and 50-318/89-32. We note that you have committed

in a' January 25, 1990 letter confirmed by NRC Confirmatory Action Letter 89-08,

Supplement 1, to review your handling of commitments prior to restart of either

unit.

Your written response to this letter should be prepared in accordance with

(

the

instructions provided in Appendix

A.

Your cooperation with us is

appreciated.

Sincerely,

,

)

W! Cy:

i

JamesC.'b$kile, Chief

i

Reactor Projects Branch No. I

j

l

Division of Reactor Projects

hQk

0FFICIAL RECORD COPY

CIR CC 89-27/28 - 0001.0.0

.

.

02/06/90

-

9002220522 900207

.L

,

iIi

' r, -

PDR

ADOCK 05000317

'

.

fI

-

O

PNV

^j

V

.

.

r

'l

!

4

l

Baltimore Gas and Electric Company

2

FEB 071990

Enclosures:

l

1.

Appendix A, Notice of Violation

2.

Combined NRC Region I Inspection Report Nos. 50-317/89-27 and 50-318/S9-28

with Attachment 1 - Steam Generator Chemistry

cc w/encis:

W. Lippold, General Supervisor, Technical Services Engineering

>

T. Magette, Administrator, Nuclear Evaluations

'

J. Lemons, Manager, Nuclear Outage Management

L. Russell, Manager, Calvert Cliffs Nuclear Power Plant

,

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

'

P. Birnie, Maryland Safe Energy Coalition

Public Document Room (PDR).

Local Public Document Room (LPDR)

!

NuclearSafetyInformationCenter(NSIC)

NRC Resident Inspector

State of Maryland (2)

bec w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

J. Linville, DRP

,

C. Cowgill, DRP

D. Limroth, DRP

K. Lathrop, DRP

,

J. Strosnider, DRS

J. Dyer, EDO

!

M. Callahan, OCA

D. Mcdonald, NRR

'

/

/

qp)'

%;$

.

RI:DRP

I:DRP

RI:DRP

JBea11/mjd

CCow ill

JLinville

2/f)/90

2/h)90

2/f/90

'

'

f

0FFICIAL RECORD COPY

CIR CC 89-27/28 - 0002.0.0

02/06/90