ML20006D898
| ML20006D898 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/01/1990 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20006D899 | List: |
| References | |
| TAC-73044, TAC-73045, NUDOCS 9002150225 | |
| Download: ML20006D898 (3) | |
Text
-
February 1,'1990
.s V=
,7 3 LDocketP(os. 50,-336 8150 245 MrL E. J. Mroczka -
_ Senior Vice President Nuclear Engineering and Operations-Connecticut-_ Yankee Atomic Power Company Northeast Nuclear Energy Company P.O. Box 270-Hartford, Connecticut 06141 0270
Dear Mr. Mroczka:
SUBJECT:
CORRECTIONS TO AMENDMENT NOS. 35 AND 144 TO FACILITY LICENSES DPR.21 AND DPR.65 FOR MILLSTONE NUCLEAR POWER STATION, UNITS 1 AND'2'RESPECTIVELY (TAC NOS. 73044 AND 73045)
J Due to~an administrative oversight, several errors were made in Amendment'Nos. 35 and 144 to Facility Operating License Nos. DPR.21 and 1
DPR-65 for Millstone Nuclear Power Station, Units 1 and 2 respectively.
'Specifically, concerning' Millstone Unit No.1, changes issued in Amendment No. 34 to the Technical Specifications (TS) (TS Section 6.15)
J are not reflected in Amendment No. 35. Corrected pages 6-21a and 6-22 toithe Millstone 1 TS are. enclosed.
l,
~Also, concerning Millstone Unit 2. changes issued in Amendment No. 143
>: to the TS are not' reflected in Amendment No.'144 (TS Section 6.10 was V
Lomitted)., Corrected page 6 21 to the Millstone 2 TS is enclosed.
L 1
Sincerely, l
1 l
signed by R. Hernan for John F. Stolz, Director Project Directorate I-4 l
Division of Reactor Projects. I/II.
'{
Office of Nuclear Reactor Regulation
Enclosures:
As stated-I
.cc'w/ enclosures:
See next page OFC :LA:PDI-4
- PM:PD 7.4
- PM:PDI-4
- D:PDI-4 n
.. _ _ _ :...... g,g. :........f..............:............:..........
NAME:SN W.:_...:............,_...' sing
'I
- MBoyle F / :JFStolz:id DATE:1//7/90
- 1/P/90
- 1/M/90 f1/ l /90 :
i i,
0FFICIAL RECORD COPY
' Document Name: Ltr to E.J. MROCZKA I
9002150225 900201 g
P
- PDR ADOCK 05000245 b
P PDu
i c~.,,.
~g=
s is h
F c, g ll.: 11
~
DATED: February 1:,
1990' x
s
. DISTRIBUT::0N-..
- ggpw 1
Ns!.#,
-NRC &' Local!PDR--
)
i Plant File ~
l Bl't,.
-S.Varga(14E4)
- B. Boger (14A2)
J.-Stolz
-bii
,S. Norris-I.::
' G.-Vissing ls-
.. M. ' Boyle 4
!! ) :
' OGC 1
~
P
D.Hagan(MNBB3302)
E.-Jordan (MNBB 3302) l G... Hill (4 (P1-137):
- W.- Jones' P-130A)-
t J. Calvo' 11F23)
ACRS(10)-
GPA/PA
~
ARM /LFHB
,h w
P s
s i
.e.
t
[
5 2 -
F d.
O m
b 6
I e --
Mr. EAward J. Mroczka Millstone Nuclear Power Station Northeast Nbclear Energy Company Unit Nos. 1 & 2 cc:
Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company.
City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Manager of Quality Assurance Northeast Utilities Service Company Northeast. Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator 4
Radiation Control Unit Region I Department of Environmental Protection U. S. Nuclear Regulatory Comission State Office Building 475 Allendale Road j
Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S Chase, Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Station Superintendent W. J. Raymond, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U. S. Nuclear Regulatory Comission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 1
J. P. Stetz, Unit Superintendent Millstone Unit No. 1 Northeast Nuclear Energy Company i
Post Office Box 128 l
Waterford, Connecticut 06385 J. S. Keenan, Unit Superintendent Charles Brinkman, Manager Millstone Unit No. 2 Washington Nuclear Operations Northeast Nuclear Energy Company C-E Power Systems Post Office Box 128 Combustion Engineering, Inc.
L Waterford. Connecticut 06385 12300 Twinbrook Pkwy Suite 330 Rockville, Maryland 20852 l
l
?
2