JAN 2 4 M Docket No. 50-443 Public Service Company.of New Hampshire
. ATTN: Mr. Edward A. Brown, President and Chief' Executive Officer New Hampshire Yankee Division Post Office Box 300 Seabrook, New Hampshire 03874 Generic' Letter 89-17 (PLANNED ADMINISTRATIVE CHANGES TO THE NRC OPERATOR [
t
' LICENSING WRITTEN EXAMINATION PROCESS) dated September 6, 1989, discussed the implementation of the Generic Fundamentals Examination Section (GFES) of the written operator licensing examination. The generic letter indicated that a-S forthcoming change to the.0perator Licensing Examiner Standards (NUREG-1021) would further define the registration and examination process.
In response to L
feedback from pilot test participants, facility training personnel, NUMARC representatives, and NRC management the administration of the GFES will L
conform to the following registration and examination process guidelines which
- will be included in the next revision of NUREG-1021, "NRC Operator Licensing _
Examiner Standards".
To register for the GFES an authorized facility licensee representative
+
.must submit a letter to the appropriate regional administrator listing the names of the candidates who wish to take either the PWR or BWR examination, their date of birth and any previous 55 docket number. The letter must also certify that the candidates have completed their.
l-fundamentals training and are enrolled in a facility licensee training program leading to NRC operator or senior operator licensing.
L The letter should be submitted approximately 30 days prior to the examination date to allow each NRC regional office to acquire an E
examination room of sufficient. size. A sample registration letter is enclosed.
The GFES will consist of 100 multiple choice questions, the time to complete the examination will be set at 2 - 1/2 hours and the passing score will be 80%.
To register for the Site-Specific Examination Section (SSES) of the written L
operator licensing examination, facility licensees should follow the procedures outlined in 10 CFR 55.31 (Applications).
The application (NRC-398 Form) must give the date that the applicant passed either a GFES or an NRC administered operator licensing written examination administered on or after
' February 1,1982, which resulted in the applicant receiving a license.
1
/
1 O
(
OFFICIAL RECORD COPY GENERIC LTR 1/3/90 - 0059.0.0
! !9 9002140097 900124 PDR ADOCK 05000443 V
PDC 3
w
k
}
l 4, i':
y,;
,;;.- J bec w/o enc 1:
l l
Region I Docket Room (with concurrences)
.ManagementAssistant,DRMA'(w/oenc1)
N LE McCabe, DRP:
J.-Johnson, DRP
~
G
'SGI - Seabrook-(w/ concurrences)
V.-Nerses, NRR lK._~ Abraham,.PA0 (20)-SALP Reports and'All_ Inspection-Reports OL Facility File I
.f,.
I t
-a
-l c
- RI:DRS Curley/mlb-a llo 1
01/ /90 0
0 0FFICIAL RECORD COPY GENERIC LTR 1/3/90 - 0061.0.0 i
01/17/90-
~
2 l
ThewrittenSSESwillconsistofquestionsrelatedtothecategories[of required coverage] for knowledge and abilities outlined in the Examiners' Handbook for Developing Operator Licensing Examinations (NUREG/BR-0122) not tested by the GFES. Attached for your information is the sampling plan NRC examinersuseindevelopingBWRandPWRwrittenexaminations,(fortesting knowledgeandabilitiesofR0andSROcandidates.] A revision to NUREG/BR-0122 p':---"
'-- 2::::.i.
10^;, will reflect these changes. The SSES will consist of a minimum of 75% objective questions and a maximum of 25%-
short answer /short essay type questions per the guidance described in-Revision 5 to the Examiner Standards (NUREG-1021). The written SSES will be constructed and graded as a single examination, requiring a passing grade of 80%. Because the written SSES will no longer have specific sections, the requirement to obtain a minimum of 70% in each section has been deleted.
Sincerely, Robert M. Gallo, Chief Operations Branch Division of Reactor Safety
Enclosures:
1.
Sample Plan-BWR R0 and SRO Reactor Operator 2.
Sample Plan - PWR R0 and SR0 Reactor Operator 3.
GFES Registration Form cc w/o enc 1:
J. C. Duffett, President and Chief Executive Officer, PSNH T. C. Feigenbaum, Senior Vice President and Chief Operating Officer, NHY J. M. Peschel, Operational Programs-Manager, NHY D. E. Moody, Station Manager, NHY T. Harpster, Director of Licensing Services R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts S. Woodhouse, Legislative Assistant P. Richardson, Training Manager Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of'New Hampshire, SLO Commonwealth of Massachusetts, SLO Designee Seabrook Hearing Service List i
0FFICIAL RECORD COPY GENERIC LTR 1/3/90 - 0060.0.0 01/17/90
SAMPLE PLAN BWR - REACTOR' OPERATOR sf y K2 K3 A1 A2 so--
,,r,at 0
A l
- ge
(#
3s%
E/A PE'S A
l.
l
/
4 0
4
'f *p#
igK1,K2 K,3 K4 Ks,K6)1 AJ A3,A4)G c
.+j l
s1%
PLANT SY8ia:nAS o*,
l
/
~
l l
l l
l l
13 /*
PLANT-WIDE GENERICS
u-SAMPLE PLAN o
BWR - SENIOR REACTOR OPERATOR A
K1 K2 K3 A1 A2 SG e
S
/ god
/
/
/
L glA g
L 43 %
E/A PE'S e0 j.
/
/
f
!//
,K2 K,3 KJ K5,K6 A1 Aj! A3,A4)G K1 i
j 40 %
PLANT SYST=."S
'l.
l 1
/
l 17%
PLANT-WIDE GENERICS
.- u l-
-o SAMPLE PLAN PWR - REACTOR OPERATOR-o g
l::
0 f
py K1' K2 K3 A1 A2 SG 00T H
[
/
/
/
GS A
(sf 0
gA
. l-36%
EPE'S A
0og 4
l l-
/
~
S jf/ / / / / /
/ / /K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 SG L
ot g, n
l s1%
I PLAN" SYSTEMS 0
f a
l.
I I
l l
l l
i L
~13%
PLANT-WIDE GENERICS e
,e
~*
+
4 P
]
SAMPLE PLAN-PWR SENIOR REACTOR. OPERATOR
- 'i t
d'
.K1 K2 K3 A1 A2 SG goj.i.s 1
O oS gA l
~
L 43 %
EPE'S 8
l 6* g l
L 7-I l
- (+
9
,xp2y3 xj xs,xe,A1 A) A3, A4)G 9
40 %
PLANY SYSTEMS
/
L i
i z
l l
l l
l
.\\
n 17%
PLANT-WIDE GENERICS j
L
~
v l-; 3 )(sh Mfv&-
- f/
.f i. *.
L.
UNITED STATES 1
,q NUCLEAR REGULATORY COMMISSION
[*
REGION 1
[
478 ALLENDALE ROAD
~ )
I' * * * ' -
KING OF PRUS$1A. PENNSYLVANIA 1MOS -
Mr. William Russell Regional? Administrator U.S. Nuclear Regulatory Commission 475~Allendale Road-King of'_ Prussia, PA' 19406
... o Dear Mr. (Name)
-(Facility'Name). requests 1to have-the (number) candidates listed below take the
- Generic l Fundamentals Examination Section of the operator licensing examination to be administered [ Dated (October, February or June) (year)]., All candidates
- are enrolled in the-(Facility Name)-[ operator training program (i.e.. hot license class)] and will have-completed the Generic Fundamentals portion of the-program by the examination administration date.
-(Candidate 1-Name) (BWR or PWR)
Date of birth Any prev,1,ous 55-Docket (Candidate 2 Name)
-(Candidate 3:Name)L l(Candidate 4 Name)--
(Candidate 5 Name) t
-(Candidate 6 Name):
=(Candidate:..:Name)
(Candidate... Name)
Sincerely,
- \\
4 t-i
't J
i;l r
._,