ML20006D467
| ML20006D467 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/01/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20006D469 | List: |
| References | |
| NUDOCS 9002130284 | |
| Download: ML20006D467 (3) | |
See also: IR 05000313/1989045
Text
,
m
-
3
i
gw.
,t
[j$.-
f. .
.
,
-
b
~ FEBI
IWL
l
-
-In. Reply Refer To::
Dockets:
50-313/89-45
o
-50-368/89-45
_j
1
~ Arkansas Power & Light Company
i
- E
ATTN: Mr. Gene Campbellt . .
,
Vice President, Nuclear
j
Operations
.
- i
-
f
P.O. Box.551
4
-Little Rock, Arkansas 72203
Gentlemen:-
[*
This refers to the inspection conducted by Messrs. C. C. Warren and R. C. Haag,
.
of this office, and C. C. Harbuck of the Office of Nuclear Reactor Regulation,
,
-during the period November 16. through December 31, 1989, of activities-
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
i.
Units 1 and 2, and to'the discussion of our findings with Mr. N. S. Carns and
other members of your staff'at the conclusion of the inspection.
l
. Areas examined during the. inspection included followup of events, operational-
'
safety verification,.a temporary instruction, maintenance, surveillance, Unit 1
o
outage activities and personnel errors. Within these areas, the inspection:
L
consisted of selective examination of procedures and representative records,
interviews with personnel, and' observations by the inspectors. The findings
are' documented in the enclosed-inspection . report.
Within these areas, the inspection consisted'of selective examination of.
L
procedures-_and representative records, interviews with personnel, and
E
observations by.the inspectors. The findings are_ documented in the- enclosed
inspection report.
1
During this inspection, .it-was found that certain of your activities were :in
violation of NRC requirements. The first violation is of concern because of
L
the potential safety significance of failing to' maintain' equipment in:aL
,
L
qualified-configuration. The second violation is of concern because of the
L
potential:for improperly connected electrical leads causing'either inoperable
equipment or-plant transients. Consequently, you- are: required to respond to-
these violations ,in writing.. in accordance with the provisions.of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title-10, Code of_ Federal: Regulations.
~ Your response should be based on the specifics contained in the Notice of
L
Violation (Notice) enclosed with this letter.
-The-response directed-by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
>
required by the Paperwork Reduction Act of 1980, PL 96-511.
E
b
&5
t
t
\\
'RI :S
C:DRP/A
- D
s
h(
Q
CWarren
DDChamberlain
S
111ns
1/30 /90'
1/30/90
y
- t
9002100284 900201
%
(
ADOCK 05000313 [i
M
G
,
.
-
.
-
- - -
-
F
x.
a,
k k
' ~ ' '
'
k M.f, ;N ' '
"
.g .
..
--
.
7
.
Arkansas Power & I.ight Company.-
-2-
y.
n
s'
Should you have any questions concerning this inspection, we will be pleased to
discuss _them with you.
<
-
,
Sincerely,
,
'
OriginalSigned By:'
Samuel J. Cohn' -
,
"
Samuel J. Collins, Director
,
DivisionofReactorProjects
-i
!
c'
- Enclosurss:
'l.
Appendix A
- 2 .~ . -Appendix 8 - NRC Inspection Report
,50-313/89-45
'
l
50-368/89-45'
,
- cc w/ enclosures:
Arkansas Nuclear O'ne-
. ATTN: ! Early Ewing, General Manager
'
. Technical Support and Assessment
.
P.O. Box 608
..
j.
Russellville, Arkan'sas 72801
Arkansas ~ Nuclear One
ATTN:
Neil Carns,'-Directo:-
Nuclear: Operations
j
LP.O. Box 608
~.~
Russellville,. Arkansas 72801
j
,
i
Combustion Engineering,.Inc.
'
ATTN:
Charles .B. Brinkman,- Manager
' Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
j
,
>
Rockville,. Maryland 120852
<!
.1
HonorableiJoe W..Phillips-
]
County Judge of Pope County.
'
'
Pope County Courthouse
.Russellville', Arkansas 72801
Bi' shop,l Cook, Purcell & Reynolds
- ATTN: ' Nicholas S.'Reynolds, Esq.
1400.L~ Street, N.W.
' Washington, D.C.
20005-3502
t
!
.
I
,
.,
.
. -
. -
.
-
_ _-
.
.
Y
,b
i
_
'
3 ' ,7, -
^
.
(
,
yo
e
,
,
!'
,
'
'
Arkansas Power & Light' Company,
-3-
'
m
a
a
"
>
= ATTN:':Ms.' Greta Dicus, Director
.-
"
Division of Environmental Health
,
Protection
'
.-4815 West Markam Street
. _
j
,
Little Rock, Arkansas 72201
i
Babcock.& Wilcox:
.
-
'
Nuclear Power Generation Division'
q
-ATTN:. Mr. Robert.B..Borsum
l
1700 Rockville Pike,,. Suite 525
Rockville, Maryland 120852
.-.
-: ,
,
.U.S. -Nuclear Regulatory Commission
<
,
ATTN: Senior Resident Inspector'
~1-Nucleer Plant Road.
.
Russellville, Arkansas 1 72801
l
' U.S.; Nuclear. Regulatory Comission
-l
,
ATTN:,: Regional Administrator, Region IV
.
611 Ryan Plaza Drive, Suite 1000-
-
'
,
Arlington,. Texas, 76011
q
_
becto=DMB(IE01)
bec'distrib. byzRIV:
. Resident-Inspector ~.
-*R. D. Martini
>
- SectionChief(DRP/A)
- '*DRSS-FRPS
. -
- RIV File
E
-
Lisa'Shea,RM/ALF
>
- DRP
- MIS System-
_ RSTS Operator:-
- ProjectEngineer(DRP/A)-
'
_*T.: Alexion,=NRR Project Manager (MS:
z 13-D-18)
- DRS
J
- C.Poslusny,NRRProjectManager(MS:
13-D-18)
,
'
- w/766.
.
.
?
i.
1
I f
.
.