Forwards Team Insp Rept 50-285/89-40 on 891023-1109 & Notices of Violation & Deviation.Followup Item Identified Re Lack of Fuse/Breaker Coordination Study
ML20006C237
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/30/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20006C238 List:
References
NUDOCS 9002070165
Download: ML20006C237 (3)


See also: IR 05000285/1989040

Text

m

--

a

W j[

-

_

B,

Mi 80i990

-

  1. ,-

o :.

,

n

LIn Re'ly' Refer To: _

j

p

r

Docket: 50-285/89-40-

.

u

?

.0maha Public Power District

'ATTH:- Kenneth J. Morris, Division Manager

. Nuclear Operations

'444 South:16th Street Mall

-

Omaha', Nebraska - 68102-2247

"

%

(Gentlemen:.

This refers to the team inspection conducted by members of our staff from

.

,

.0ctober 23 through Nosember 9,1989, of activities authorized by NRC Operating

'

,

License DPR-40-for the. Fort'Calhoun Station. Our findings were discussed with

you and other members of your staff at the conclusion of the inspection.

,

,

' Areas examined during this inspection-included systems selected on the basis of

r

relative risk from the generic accident sequences that were developed by a

'

generic based probabilistic risk ass, ssment. During the equipment inspection,

,

the inspectors focused on the availability of critical components as evidenced-

>

,by plant conditions and implementation of programs and procedures that would

,

i

ensure operability. Within these areas, the. inspectors examined selective

procedures and representative records, interviewed personnel, and observed

equipment and-simulated activities.

'

t

During this inspection, the. inspectors- found that some of your activities were

in violation ~of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the-provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, code of Federal Regulations,

j

,

Your response should be based on the specifics contained in the: Notice of

Violation enclosed with this letter.

The inspectors also identified another activity that was in violation of NRC

requirements. However, in-accordance with Section V.A of the'NRC's' Enforcement

Policy'(10 CFR Part 2, Appendix C), no citation is being issued for that

,

activity. The violation is described in_Section 4 of the enclosed inspection

report.

In addition, during the' exit meeting for this inspection,

Mr.

S..~.K. Gambhir of your staff made a commitment relative to weaknesses

. identified in your fuse control program. This commitment involved taking

' interim corrective actions within 5 days of the exit by having-a short-term

fuse control program in place and having a comprehensive fuse control program

-developed by the end of the spring 1990 refueling outage.

If these actions are

Tnot consistent with your understanding of the commitment made please notify us

within-30 days of the date of this letter.

,

RIV:RI:PSS*

PSS*

OLS*

D:DRS* Q

D

'ASingh

iStetka

JWhittemore

LJCallan M 0

S

ins

,

'<

/ /90

/ /90

/ /90

/ /90

I

/90

,

  • previously concurred

h

I

9002070165 900130

PDR

ADOCK 05000285

i\\

-

O

PDC

1

,

5

-

..

y--

~~- -

q

'

,

y

%

'

>

,

i

-j cg

-

-

'

,

4 '

.y

<

. . . .

I

,s

.: Omaha Public' Power District

-2-

,

b

'

'

.

.

.

.

Also during-this inspection, it wasLfound that'certain of:your activities =

appeared to deviate from a:comitment'made to the NRC. This. item and reference

-to the commitment'is identified in the' enclosed Notice of-Deviation. 'You are-

'

.

requested,to respond.to this deviation in writing. Your response.should be-

based on the specifics contained,in.the Notice of Deviation enclosed with this

letter.

.;

,

,

.

J

This inspection identified many problems with Emergency Operating

'

Procedures (EOPs); these are discussed in paragraph 2 of the attached report.

. . .

.

Although the inspection concluded that your E0Ps, when used by experienced

'

. operators, provided adequate direction to mitigate accident consequences, the

y

number of problems identified in a small sample of E0Ps is cause for concern.-

'

>

A complete E0P inspection is planned for later this. year; however, we

recommend that corrective actions for your E0Ps not be held in abeyance,until

this E0P inspection.

c

,

The responses directed by this>1etter and the! accompanying Notices are not

subject to the clearance procedures of the'0fficeiof Hanagement and Budget as'

,

required by the' Paperwork' Reduction Act of 1989,'PL96-511.

.

.Should you.have any questions.concerning this' inspection, we will be pleased to.

',

discuss them with~you.

3

Sincerely,

/5/

s

.

Samuel J.-Collins, Director

Division of Reactor Projects

Enclosures:

.

'

1; Appendix A - Notice of Violation

12. Appendix B - Notice of Deviation

'3. Appendix C - NRC Inspection Report

50-285/89-40 w/ Attachments

cc w/ enclosures:

LeBoeuf, Lamb, Leiby & HacRae

ATTH:

Harry H. Voigt, Esq.

1333 New Hampshire Avenue, NH

Washington, D.C.

20036~

Washington County Board

of Supervisors

ATTH: Jack Jensen, Chairman

i

'

Blair, Nebraska 68008

.

t

-

- - - - - -

. -

- - - - . -

,

.-

- a.

./

- -

-

,

.

4

j;( *

'

l l ,i

,

g

\\'k '

li

[h'

~

'

\\

y

+

e

,

v h)h 3;) f3

'

'

.,

.

% ' [k_y -

'

,

'

'

w

.,

Omaha- Public Power District

-3-

( ( w.

-

-

i:3

m?

Combustion Engineering,;Inc.-

4

ATTN:: Charles-B.' Brinkman, Manager

,"

.

' Washington-Nuclear Operations

,

!12300 Twinbrook Parkway,- Suite 330

. f

'

>

Rockville, MD::20852;

j

"

l

Department of Health.

.

o

'

g'

ATTH: '. Harold'Borchert,' Director.

,

"

. Division of-Radiological Health

. 301 Centennial Mall, South'

~

' P.O. Box 95007'

-Lincoln, Nebraska' 68509

.

<

.

Fort CalhounLStation

ATTN:

G..R. Peterson, Manager

,

P.O.' Box 399:

~

Fort:Calhoun, Nebraska 68023-

.,

bccitoDMB'-(IE01);

!

Lbecdistrib.LbyRIV:

  • R. D.; Martin -

'* Resident Inspector

  • DRSS-FRPS
  • SectionChief(DRP/B)

. HIS System

  • RIV-File-
  • DRP:
  • RSTS Operator

-*ProjectEngineer'(DRP/B)

Lisa Shea, RM/ALF

-!

  • DRS (2 copies)
  • RPB-DRSS-

l

t*RPB-DRSS'

i

  • A.: Bournia NRR Project Manager (MS13-D-18)

j

  • RRIE .
  • J. Wing

~i

  • JUPE 11et-
  • J.

Chung

  • T. Westerman'-
  • R. Barrett

i

'*R. Farrell

  • P. Harrell

4

'*T. F. StetkaL

  • A. Singh

1

  • J; Whittemore-

!

7

  • w/766

!

'i

.

I

2

'

$

J

csk,

'

kt h'

t

k