ML20006B919
| ML20006B919 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Mcguire, Catawba, McGuire, 05000000 |
| Issue date: | 01/24/1990 |
| From: | Matthews D Office of Nuclear Reactor Regulation |
| To: | Tucker H DUKE POWER CO. |
| References | |
| GL-88-20, TAC-74394, TAC-74395, TAC-74430, TAC-74431, TAC-74440, TAC-74441, TAC-74442, NUDOCS 9002060092 | |
| Download: ML20006B919 (3) | |
Text
ry-.
yp l
3,n,.,;
January 24, 1990 Qy3
[DocketsNos.: 50-269.-50-270, 50-287' DISTRIBUTI N E
50-369, 50-370, 50 413 clEiiliUl*
eM DHood' g
50 414 NRC & Local PDRs KJabbour F
PDII.3 Rdg.
LWiens f
Mr. ' H. B.. Tucker, Vice President SVarga 0GC Nuclear. Production Department
-WHeh1(Acting-ADR2) EJordan Duke Power Company RIngram MBoyle 422 South Church Street DMatthews ACRS(10)-
- Charlotte, North Carolina 28242 JFlack CATAWBA FILE MCGUIRE FILE OCONEE FILE
Dear Mr. Tucker:
n
SUBJECT:
REVIEW 0F 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL
~'
PLANTEXAMINATIONS(IPE)(TACSNOS. 74394/74395/7,4430/74431/
'74440/74441/74442)
Re:
Oconee 1/2/3, McGuire'1/2, Catawba 1/2
. Generic Letter 88-20 requires,'in part.-that each operating reactor licensee
.and construction permit holder: (1) identify the. approach and method selected for performing l the IPE, (2) describe the method to be used, and (3) identify i
the; schedule for performing the IPE and submitting the results to the NRC.-
l This information was to be submitted to the NRC within 60 days of issuance of
, Supplement 1 of the-generic letter.
We have reviewed your letter dated November 1,1989, submitted in response to 1
the. reporting' requirements of the generic letter. We conclude that your IPE
}
i approach, methodology and schedule are acceptable.
We anticipate that any
.possible additional analysis or reporting requirements, such as those from E
' external events or-from the Containment Performance Improvement Program, will not have any adverse effect on your schedule.
However,. if your schedule should m
H change, please notify the NRC of the proposed change and the reason for the change.
l Should you have any' questions concerning the requirements of the generic letter,
.please contact Mr. Michael L. Boyle, NRR, at (301) 492-1308' or Mr. ' John H. Flack,
.RES; at (301) 492-3979.
Sincerely,
/s/
David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page 1
0FC :LA:PDII-3
- PM:PDI -3
- PM:PDII
- PM-I
- D:P
..:...... g....:. p.$.....:__....
j NAME. :RIngrarh
- DHo' od: bid
- KJabbour iens
- DMa thews a
.....:......._...:...........:............:............:....n.......:
lDATE_:01/9/90.
- 01/25/90
- 01/t4/90
- 01/ M 90
- Olg /90
[0(
'0FFICIAL RECORD COPY j
.. Document. Name: 60 DAY RESPONSE LTR 9002060092 900124 h
4 PDR ADOCK 05000269 P
FDC
y o
s.
4..
~ Mr. H. B. Tucker Catawba Nuclear Station
. Duke Power Company McGuire Nuclear Station 1
Oconee Nuclear Station
.Cc' A.V. Carr, Esq.
Duke Power Company North Carolina Electric Membership Corp.
422 South Church Street -
3400 Sunmer Boulevard Charlotte, North Carolina 28242 P.O. Box 27306 3
Raleigh, North Carolina 27611 1
J. Michael McGarry, III, Esq.
Bishop, Cook, Purcell and Reynolds Saluda River Electric Cooperative, 1400 L Street, N.W.
Inc.
o Washington, D.'C.
20005 P.O. Box 929 Laurens, South Carolina 29360 North Carolina MPA-1 Senior Resident Inspector-Suite 600 Route 2. Box 179N 3100 Smoketree Ct. -
York South Carolina 29745 P.O. Box 29513 Raleigh, North Carolina 27626-0513 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Ms. S. S. Kilborn 101 Marietta Street, NW, Suite 2900 Area Manager, Mid-South Area Atlanta, Georgia 30323 ESSD Projects Westinghouse Electric Corp.
Mr. Heyward G. Shealy, Chief MNC West Tower - Bey 239 Bureau of Radiological Health P.O. Box 355 South Carolina Department cf Health Pittsburgh, Pennsylvania 15230 and Environmental Control 2600 Bull Street County Manager of York County Columbia, South Carolina 29201 1
York County Courthouse York, South Carolina 29745 Ms. Karen E. Long i
Assistant Attorney General Richard,P. Wilson, Esq.
N.C. Department of Justice Assistant Attorney General P.O. Box 629 S.C. Attorney General's Office Raleigh, North Carolina 27602 P.O. Box 11549 Columbia, South Carolina 29211 Mr. Robert G. Morgan Nuclear Production Department Piedmont Municipal Power Agency Duke Power Company 100 Memorial Drive P.O. Box 33189 Greer, South Carolina 29651 Charlotte, North Carolina 28241 Hr. Alan R. Herdt, Chief Project Branch #3 U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
hh "j -
, (
Mr. H. B. Tucker '
Duke Power Company 1
cc:
Dr. John M. Barry Manager, LIS Department of Environmental Health NUS Corporation Mecklenburg County 2536 Countryside Boulevard 1200 Blythe Boulevard Clearwater Florida 34623-1593 Charlotte, North Carolina 28203 Office of Intergovernmental Relations -
County Manager of Mecklenburg County 116 West Jones Street 720 East fourth Street Raleigh, North Carolina 27603 Charlotte, North Carolina 28202 Honorable James M. Phinney Mr. J. S. Warren County Supervisor of Oconee County Duke Power Company Walhalla South Carolina 29621 Nuclear Production Department P. O. Box 33189 Mr. Paul Guill Charlotte, North Carolina 28242 Duke Power Company P.O. Box 33189 Senior Resident Inspector 422 South Church Street c/o U.S. Nuclear Regulatory Commission Charlotte, North Carolina 28242 Route 4, Box 529 Hunterville, North Carolina 28078 Senior Resident. Inspector U.S. Nuclear Regulatory Commission Route 2, Box 610_
Seneca, South Carolina 29678 Mr. Dayne H. Brown, Chief Radiation Protection-Cranch Division of Facility Services Department of Human Resources 701 Barbour Drive Raleigh,' North Carolina 27603-2008 Mr. Robert B. Borsum Babcock & Wilcox huclear. Power Division Suite 525' 1700 Rockville Pike Rockville, Maryland 20852 w a