(c)-Theradiationdosesavingsarelowerandtheevacuation
.l times are higher than for similar. plants-in other locations?
If not, why not?
ANSWER.
The' compliance of a specific emergency plan with the Comission's requirements is not judged on a comparative basis. Rather, each' plan must in and of itself be shown to meet the NRC regulations.
Factors such as topography, meteorology, demography and others..which vary widely from site to site, will have great' l
1 influence on both dose savings and evacuation-times. What is relevant is-3 whether an applicant has established appropriate evacuation time estimates and i
otherwise ensured that, for the specific facility in question, appropriate actions in an emergency can be taken.
1 I